WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HDR ENGINEERING, INC.
WORK ORDER NUMBER: UHDR-SCP-CPABDesign-082018
PROJECT TITLE: UCathodic Protection AB Water Line Design
and Repairs
ORIGINAL BID/RFP NUMBER & NAME: U8073, Engineering Services for Water, WW
and Stormwater Facilities Capital
Improvements
MASTER AGREEMENT EFFECTIVE DATE: UMay 15, 2015
ARCHITECT/ENGINEER: U HDR Engineering, Inc
OWNER’S REPRESENTATIVE: USue Paquette
WORK ORDER COMMENCEMENT DATE: UAugust 27, 2018
WORK ORDER COMPLETION DATE: UJanuary 1, 2019
MAXIMUM FEE: (time and reimbursable direct costs): U$150,485.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: UEngineering design and construction
services for the City of Fort Collins Cathodic Protection Program project – Anheuser Busch
Water Line CP Design and Repairs. See attached supporting documentations.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement
between the parties. In the event of a conflict between or ambiguity in the terms of the Master
Agreement and this Work Order (including the attached forms) the Master Agreement shall
control.
The attached forms consisting of UsixU (6) pages are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
SERVICE PROVIDER: HDR Engineering, Inc.
By: Date:
Name: Title:
Page 1 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Brad Martin Senior Vice President
August 30, 2018
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Sue Paquette, Civil Engineer III
REVIEWED: Date:
Marisa Donegon, Buyer II
APPROVED AS TO FORM: Date:
Name,City Attorney's Title
(if greater than $1,000,000)
ACCEPTANCE: Date:
Owen Randall, Civil Engineering Director
ACCEPTANCE: Date:
Theresa Connor, Utilities Deputy Director
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
August 28, 2018
August 28, 2018
August 31, 2018
August 31, 2018
August 31, 2018
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE OF SERVICES
Page 3 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Fort Collins Utilities | A-B Line CP Design & Repairs
Scope of Work
1
Scope of Work
Date: Monday, August 06, 2018
Project: Fort Collins Utilities Cathodic Protection Program
Subject: Anheuser-Bush Water Line CP Design and Repairs
Providing cathodic protection (CP) for the Anheuser-Busch (A-B) pipeline was identified as the
top priority from the 2018 Cathodic Protection Master Plan (HDR, Aug 2018). The master plan
improvement recommendations include major capital project work to 1) repair the identified joint
discontinuities and 2) provide design assistance and construction documents for an impressed
current cathodic protection (ICCP) system for the A-B Line consisting of five rectifiers. The
proposed rectifiers are to be located on city-owned property or within city acquired easements.
Task 1 – Management, Coordination and QA/QC
1.1 Project Management, Accounting and Quality Control
• Initiate project accounting, budget and resource management tools.
• Prepare a project guide that clearly identifies the project work elements, deliverables,
budget and schedule.
• Prepare monthly invoices and progress reports.
• Perform QA/QC reviews of calculations and supporting documents.
1.2 Project Coordination Meetings
• Hold monthly meetings at City offices (or HDR local office as appropriate) to discuss
progress, address technical issues, and review submittal comments. Approximately 8, 1-
hr progress meetings are anticipated.
• Prepare agendas and notes for each project coordination meeting.
Key Assumptions:
• 4 month Work Order duration
Deliverables:
• Meeting notes with Action Items
• Monthly invoices
Task 2 – Design Development
2.1 Site Plan Development
• Develop site plan base mapping from city provided hi-resolution aerial imagery, GIS-
based line work for existing utilities and parcels/right-of-way, and existing utility
easement line work/legal descriptions.
• Identify proposed locations for deep anode groundbeds, rectifier cabinet/structure
locations, available electrical power supplies, access roads, and other pertinent features
necessary to construct and maintain the proposed facilities.
Page 4 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Fort Collins Utilities | A-B Line Rectification
Scope of Work
2
• Develop site plans for each rectifier site for use in stakeholder coordination and to
ultimately be included in the construction drawing package.
• Hold a focus group meeting with city Planning and Development Services staff to
discuss known/upcoming parcel development near or adjacent to the proposed rectifier
sites; specifically the Crumb Pond site and Lindenmeir Outfall Channel.
• Edit and update site plan drawings based on APDS team input and relevant comments
from stakeholder coordination efforts.
2.2 Electrical Service Coordination
• Identify power needs for each site and coordinate with FCU Light and Power for
distribution line extension and service connections.
• Develop electrical loads for each rectifier, including preliminary loads for initial
coordination with FCU Light and Power, and finalize loads during the Construction
Document task. Note this meeting may take place with the above Planning and
Development services staff focus group.
• Hold a focus group meeting with FCU Light and Power staff to discuss power needs,
optimized rectifier locations, and identify distribution system improvements to be
completed by the city.
• Identify focus group meeting conclusions/recommendations in meeting
2.3 Instrumentation and Controls
• Research and evaluate remote monitoring unit (RMU) equipment with their associated
communications requirements.
• Develop SCADA integration approach for RMU connection to city system.
• Hold a focus group meeting with Fort Collins Utilities and IT departments to discuss
network/comms integration and O&M activities.
• Identify focus group meeting conclusions/recommendations in meeting.
2.4 Geologic and Well Data
• Review and incorporate the geologic subsurface conditions as reported in Anticipated
Geologic Conditions AB Waterline Rectifier, Nov 6, 2018, Brierley Associates plus other
city supplied geologic and geotechnical information into the project design,
specifications, and coordination with rectification sub-contractors.
• Research and map existing State registered groundwater well locations within
approximately 1,000 feet to identify potential conflicts. Note that an initial data review
does not reveal any wells immediately adjacent to the proposed deep anode groundbed
with the exception of the Crumb Pond site. It is assumed the deep anode groundbed will
be located a sufficient distance away from the existing wells to avoid permitting or
hydrogeologic analysis.
• Prepare a brief summary memo with associated well location mapping.
2.5 Resistivity Investigations
• Evaluate site resistivity at depth for anticipated deep well anodes based on field
evaluations using 4-pin testing methodology.
Page 5 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Fort Collins Utilities | A-B Line Rectification
Scope of Work
3
• The 4-pin test is proposed at two rectifier sites as determined by a review of geology
across the A-B Line and general orientation/spacing of the proposed rectifiers.
• The 4-pin testing approach would require access of 900’x900’ area at the rectifier site
and 4-days (field work and travel) completed by 2-corrosion engineering specialists. One
corrosion engineer is anticipated to have an additional day to coordinate equipment
delivery, testing plan, and travel to Fort Collins.
• Summarize field work and results in a technical memorandum complete with site plan
mapping of 4-pin alignments and photos for the two sites.
2.6 Discontinuity Repair Support
• Provide CP field testing to support location of joint discontinuities and testing of joint
repairs for span continuity. Spans 2 (east of N College starting at Western States bank
to Red Cedar Circle) and 3 (near the “Crumb” pond between test stations W27955 and
W10388) will require joint continuity repair.
• Field testing is anticipated to be supported by CP staff from the HDR Denver office and
is to occur over a 4-week (+/-) period. A level of effort of 24-hrs (three field days) per
span is budgeted for this effort.
• Provide written field notes and activity log with supporting photos for each field support
workday.
Task 3 – Construction Documents
Task 3.1 Prepare 60% CD Drawings
• Develop drawings and supporting design information to define a 60% level of detail
Construction Drawings (CDs).
• Anticipated sheet list is as follows:
o Cover sheet
o General notes, legend, and abbreviations
o A-B Line Rectification Plan (1-sheets)
o Lincoln Middle School Rectifier – Overall Site Plan
o Lincoln Middle School Rectifier – Rectifier Site Plan and Groundbed Site Plan
o Soft Gold Park – Overall Site Plan
o Soft Gold Park – Rectifier Site Plan and Groundbed Site Plan
o Evergreen East Pond – Overall Site Plan
o Evergreen East Pond – Rectifier Site Plan and Groundbed Site Plan
o Lindenmeir Outfall – Overall Site Plan
o Lindenmeir Outfall – Rectifier Site Plan and Groundbed Site Plan
o Crumb Pond – Overall Site Plan
o Crumb Pond – Rectifier Site Plan and Groundbed Site Plan
o Cathodic Protection Details (3 sheets)
Project specific CP details
Electrical and communication details
• Submit drawings for review
Page 6 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Fort Collins Utilities | A-B Line Rectification
Scope of Work
4
• Provide list of rectifier installation contractors (deep anode groundbed drillers) for
coordination of obtaining quotes by Hydro. It is anticipated the 60% drawings and
geotechnical data will be used for quote coordination.
• Initiate ICE group with project, send 60% drawings and schedule meeting to discuss
scope and project, in preparation for independent cost estimate and reconciliation
meeting.
Task 3.2 Develop Project Specifications
• Select and edit city standard technical specifications for application to project scope.
• Develop project specific technical specifications to address work elements not covered
within the City’s Master Specifications.
• Submit specifications for review during project progress meetings.
Task 3.3 Prepare 90% CDs for Cost Reconciliation
• Discuss and address City/Contractor review comments from 60% drawing submittal and
interim review of project specifications
• Update 60% drawings and submit 90% for cost reconciliation process.
• Attend ICE reconciliation meeting.
Task 3.4 Prepare Final Construction Documents
• Finalize drawings based on City/Contractor comments during ICE reconciliation process.
• Submit Issue for Construction (IFC) drawings.
Key Assumptions:
• A city stormwater management plan is not required as the impact area will be less than
0.5 acres per site.
• Contractor will prepare dewatering permit as required.
Deliverables:
• Drawings and specifications for use during project coordination meetings (PDF)
• Formal 60% and 90% complete submittals - drawings and specifications (PDF)
• Issued for Construction drawings and specifications (PDF and 3 hard copies)
Task 4 – Master Plan Closeout
• Present master plan to the Water Utilities group.
• Reconcile and resolve master plan review comments from Water Utilities group
presentation and related comments from city review of draft and draft final master plan
document submittals.
• Update implementation cost table/spreadsheet with refined costs for A-B Line RMUs and
other scope items not included in original estimate (e.g. electrical service by city crews).
• Prepare presentation for Fort Collins Water Board and present.
• Finalize master plan and provide MS Word document, compiled PDF, and associated
implementation cost spreadsheets.
Page 7 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER COST DETAIL
Page 8 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
HDR Engineering
Rich Thornton
Contract Manager/
Senior Project
Manager
Senior Technical
Advisor/ QC
Jeff Giddings
Senior Corrosion
Engineer II
Corrosion Engineer
Addison Smith
Bill Cassity
Senior Electrical and
Controls Engineer
Nick Humphrey,
Project Engineer II
Andew Keenan,
Staff Engineer I
Mike Austin,
CAD Designer
Senior Project
Accountant
Clerical Assistant
Hours
Labor
Total Expenses
HDR Fee
$ 240 $ 260 $ 190 $ 150 $ 180 $ 150 $ 105 $ 125 $ 125 $ 65
Task Description
Task 1 – Management, Coordination and QA/QC
1.1 Project Management, Accounting and QC 6 6 16 28 $ 5,000 $ 250 $ 5,250
1.2 Project Coordination Meetings 12 6 16 34 $ 6,420 $ 321 $ 6,741
Sub-total 18 6 6 0 0 16 0 0 16 0 62 $ 11,420 $ 571 $ 11,991
Task 2 – Design Development
2.1 Site Plan Development 8 18 40 12 78 $ 10,320 $ 516 $ 10,836
2.2 Electrical Service Coordination 2 4 8 8 2 2 26 $ 4,430 $ 222 $ 4,652
2.3 Instrumentation and Controls 2 2 8 24 2 2 40 $ 6,930 $ 347 $ 7,277
2.4 Geologic and Well Data 2 4 2 8 $ 1,330 $ 67 $ 1,397
2.5 Resistivity Investigations 4 40 32 4 8 2 90 $ 15,050 $ 3,445 $ 18,495
2.6 Discontinuity Repair Support 4 8 48 4 8 72 $ 11,120 $ 2,189 $ 13,309
Sub-total 22 0 54 96 32 34 56 20 0 0 314 $ 49,180 $ 6,784 $ 55,964
Task 3 – Construction Documents
3.1 Prepare 60% CD Drawings 12 2 12 60 16 16 36 60 4 218 $ 31,500 $ 1,575 $ 33,075
3.2 Develop Project Specifications 2 2 8 12 8 16 4 52 $ 8,580 $ 429 $ 9,009
3.3 Prepare 90% CDs for Cost Reconciliation 8 1 10 32 12 12 20 20 4 119 $ 17,700 $ 885 $ 18,585
3.4 Prepare Final Construction Documents 4 1 6 16 4 12 12 12 4 71 $ 10,300 $ 515 $ 10,815
Sub-total 26 6 36 120 40 56 72 92 0 12 460 $ 68,080 $ 3,404 $ 71,484
Task 4 – Master Plan Closeout
Master Plan presenations, document closeout, and
additional estimating support 24 4 15 14 57 $ 10,520 $ 526 $ 11,046
Sub-total 24 0 4 0 0 15 0 14 0 0 57 $ 10,520 $ 526 $ 11,046
Hours 90 12 100 216 72 121 128 126 16 12 893
Fee $21,600 $3,120 $19,000 $32,400 $12,960 $18,150 $13,440 $15,750 $2,000 $780 $ 139,200 11,285 $ 150,485
City of Fort Collins Utilities
Cathodic Protection Program, AB
Line CP Design and Repairs
Page 9 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
WORK ORDER SCOPE DETAIL
Page 10 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
ID Task
Mode
Task Name Duration Start Finish
1
2 Task 1 – Management, Coordination and QA/QC 90 days Mon 8/6/18 Fri 12/7/18
3 1.1 Project Management, Accounting and QC 90 days Mon 8/6/18 Fri 12/7/18
4 1.2 Project Coordination Meetings 80 days Mon 8/20/18 Fri 12/7/18
5 Task 2 – Design Development 85 days Mon 8/6/18 Fri 11/30/18
6 2.1 Site Plan Development 10 days Mon 8/6/18 Fri 8/17/18
7 2.2 Electrical Service Coordination 5 days Mon 8/20/18 Fri 8/24/18
8 2.3 Instrumentation and Controls 10 days Mon 8/20/18 Fri 8/31/18
9 2.4 Geologic and Well Data 5 days Mon 8/20/18 Fri 8/24/18
10 2.5 Resistivity Investigations 5 days Mon 9/3/18 Fri 9/7/18
11 2.6 Discontinuity Repair Support 20 days Mon 11/5/18 Fri 11/30/18
12 Task 3 – Construction Documents 66 days Mon 9/10/18 Mon 12/10/18
13 3.1 Prepare 60% CD Drawings 20 days Mon 9/10/18 Fri 10/5/18
14 City Review 10 days Mon 10/8/18 Fri 10/19/18
15 3.2 Develop Project Specifications 8 days Mon 10/8/18 Wed 10/17/18
16 3.3 Prepare 90% CDs for Cost Reconciliation 15 days Mon 10/22/18 Fri 11/9/18
17 City and ICE Review 10 days Mon 11/12/18 Fri 11/23/18
18 ICE Workshop 1 day Mon 11/26/18 Mon 11/26/18
19 3.4 Prepare Final Construction Documents 10 days Tue 11/27/18 Mon 12/10/18
20 Task 4 – Master Plan Closeout 54 days Mon 8/6/18 Thu 10/18/18
21 Document closeout and estimating support 5 days Mon 8/6/18 Fri 8/10/18
22 Water Board Presentation 1 day Thu 10/18/18 Thu 10/18/18
11/26
10/18
29 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16
Aug '18 Sep '18 Oct '18 Nov '18 Dec '18
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: A-B Line Design & Repairs
Schedule
Date: Fri 8/10/18
Page 11 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT D
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract
Documents.
Page 12 of 12
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804
DocuSign Envelope ID: 7C104371-4E98-4391-9995-5F9464EBB804