HomeMy WebLinkAboutPrebid - BID - 8449 PITKIN STREET BIKEWAYATTENDANCE RECORD
PRE BID MEETING
Project: $yqq Pitkin Street Bikeway
Time: 11:00 AM
Date: 1 /20/17
Location: 215 N Mason St., Community Room, Fort Collins, CO
NAME
FIRM NAME
ADDRESS
TELEPHONE
E-MAIL ADDRESS
%ylOvvr�q i� Co.✓-fTRucTAe S
. p ETCR S
/C 47TF�LC Cie QOIoS/
9,7e -
"#vc4eIrs .
39413 E- IbarH ow
J OHO ObRIErJ
N0MA At CON CfLETE
KrEnr�bBUlLlr ; b
T
/aNC/ZL
awe'
V A ,s.✓EitISON
pi44A
L
C�-tC� r ►-sE�-�.�,� cv�
�70-.-C l
c C.>r
-071
(::�SP.+oQ? .(c 4�,Ck),
�
QQ ,� 1 I
0�0 64-j L4-o:-i AV C
'as cv Pos�
303'74/z-9-700
II4k��.�:
70 L
Gil �O
�(S 9,f7
C'(--)
o1"
c-o r-\
.D"
. C-0.-V\
SECTION 623 - IRRIGATION
623 — Irrigation Restoration — LS
— Impacted irrigation systems, Shields and Pitkin
— Existing irrigation heads at back of walk
— Includes all work required to restore the impacts to the systems
and make fully operational
• Anticipated replacement of irrigation heads
Minor irrigation line repairs
Controller reprogramming
• Tying into CSU's system in Pitkin median
623 —2.5" Irrigation Line — Bored
— To tie into CSU irrigation in median
SECTIONS 626, 627
• 626 — Mobilization — LS
• 627 — Pavement Marking — GAL
• 627 —Thermoplastic Pavement Marking (Word -Symbol)— SF
• 627 —Thermoplastic Pavement Marking (Xwalk-Stop Line) — SF
SECTION 630 - TRAFFIC
630 — Construction Zone Traffic Control — LS
— Covers all traffic control items necessary for the project except
for Flagging, TCS, & TCI
— Plans developed by Contractor
— Approved by City of Fort Collins
630 — Flagging — HOUR
630 — Traffic Control Inspection — DAY
— Pays for every day of contract that a full time TCS is not reuired
(weekend inspections, weekday inspections when no traffic
control is setup in arterial roadways)
630 — Traffic Control Management — DAY
— Pays for every day that a full time TCS is required, which is only
on days when work occurs in arterial roadways (estimated to be
15 working days)
1 /20/2017
YJ
1 /20/2017
TRAFFIC CONTROL
• All plans for work must be submitted at least 48 hours in advance
• Maintain pedestrian and bicycle traffic — TCP to account for these
movements
• Emergency vehicle access into and through construction site
• Provide and maintain continuous temporary access for businesses
and residences
• Maintain 11 foot lanes throughout the project
TRAFFIC SIGNAL COORDINATION
• City will install all new traffic signal equipment,
contractor to install conduit and pull boxes
City Traffic Signal Contact:
Britney Sorenson
970-222-5533
bsorenson@fcgov.com
TRAFFIC SIGNAL COORDINATION
• Contractor shall coordinate with City Traffic
Department to meet the following goals
— Traffic Department work is expedited
— Duplication of work is minimized
— Impacts to traffic are minimized
10
PAVEMENT MARKINGS AND SIGNAGE
• Permanent pavement markings to be installed by the Contractor
• Permanent signage to be installed by City
• Coordinate with City Traffic Department
Signing and Striping Contact:
Rich Brewbaker
970-221-6792
rrewbaker@fcgov.com
UTILITIES
The following utility work will be performed by Utility Company
or their agent:
Centuryl-ink — Relocate OH lines at Shields and Pitkin
— Work may need to be coordinated by contractor at
beginning of project
CSU — Relocate existing light poles at Shields and Pitkin
— Work needs to be coordinated by contractor and
scheduled
City Traffic — Install all signal poles and wiring
— Timing and work needs to be coordinated by contractor
1 /20/2017
11
1 /20/2017
12
1 /20/2017
Pitkin Bikeway Project
Federal Aid Project No. TAP M455-120
PRE -BID CONFERENCE
Friday January20, 2017
11: 00 AM — 12:00 PM
215 N. Mason Street
Community Room
City of Fort Collins
INTRODUCTIONS
• Engineering Capital Projects:
• Mark Laken — Project Manager 222-3546
Joe Crabill— Construction Inspector 222-1134
Purchasing:
• Elliot Dale— Buyer 221-6777
• Gerry S. Paul — Director of Purchasing 221-6779
1 /20/2017
SUMMARY OF WORK
• New signal installations at arterial streets (City performed,
contractor installs caissons)
• Removals (curb, concrete, asphalt)
• Clearing and grubbing and Tree removal (Shields)
• Concrete sidewalk (includes curb ramps) and median work — bike
medians
• Curb and gutter
• Asphalt paving
• Construction traffic control
• Striping (thermoplastic "sharrowV along route)
• Utility coordination
SUMMARY OF WORK (by others)
Construction Staking
> Provided by the City of Fort Collins
> 48 Hours (Minimum) Required for Notification
Testing
> Paid for by the City of Fort Collins thru CTL Thompson
> Concrete and asphalt
> Contractor will schedule material testing as required
Signal installations
> Performed by City of Fort Collins Traffic Department
> Contractor required to coordinate timing
SUMMARY OF WORK
1 /20/2017
VICINITY MAP
U
t E.
i All.
..S-,
• TAP Funding
• Facilitates bicycle/ped crossing of major arterials
• Work primarily at Taft Hill, Shields and Lemay
• Striping work at College
IMPORTANT CONTRACT DATES
Award Contract
Partnering Meeting
• Mandatory meeting prior to start of construction
• Date to be determined, Late February/Early March
Notice to Proceed with CDOT concurrence to award
Substantial Completion
• Fifty (50) calendar days
Final Completion
• Ten (10) calendar days
CDOT LOCAL AGENCY PROJECT
UDBE goal for this project: 10 %
Contractors to be on CDOTs prequalified list
Bid proposal must include.
- CDOT 606 Anti -Collusion Affidavit
- CDOT 714 UDBE Assurance
• Bids will not be accepted if they do not have these forms
• Low bidder to receive.
• Form 605, Form 621, Form 715 and Form 718
• These forms must be returned by 4:30 pm the following day
Monthly payments will not be processed until all documentation required by I
CDOT for federally funded projects has been submitted to the City
PROJECT OVERVIEW
Coordination with other utilities (Centurylink overhead line at
Shields), City Departments and CSU (light poles at Shields)
Contractor responsible to acquire all appropriate permits
and submit required documentation
— SWMP—permit and inspections
— COOT Form 205 for each subcontractor
— TCS Diaries, Payrolls
All required CDOT documentation prior to progress
payments (Buy America, EEO, etc.)
No designated staging area provided
PROJECT OVERVIEW
Traffic Control
— All MHT's approved through City Traffic Department,
submitted at least 48 hours in advance
— Lane rental spec for arterial roadways
— Minor (local) street closures will be permitted
— Contractor responsible for submitting all MHT's
— Access to local businesses and residents required at all times
— Coordination with CSU events/construction near Shields and
College
— Arterial road lane closures permitted between 8:30 AM to 3:30
PM.
HIGHLIGHTS FROM SPECIFICATIONS
Section 104 — Lane Rental Fee
— Total of 15 daytime lane rental days for the project.
— Anticipate 5 lane rental days on Taft Hill Road, Shields Street
and Lemay Ave.
— Additional days shall be $1200/1ane day
— Lane day measured as any day that thru lane or left turn lane
closed to traffic on arterials roads (Taft Hill, Shields, College
Ave, or Lemay).
— Arterial lane closures permitted between 8:30 AM to 3:30 PM
— Minor streets do not have Lane Rental Fee
1 /20/2017
11
1 /20/2017
HIGHLIGHTS FROM SPECIFICATIONS
Section 108 - Prosecution and Progress
- 60 total calendar days for completion of project
- Notice to Proceed, plan to issue by March 15, 2017
- Liquidated Damages assessed for failure to complete work on
time
• $800/day in accordance with Section 108.09
- Standard hours of operations
• 7 AM thru 6 PM M-F
• Extended hours and weekend work may be requested
HIGHLIGHTS FROM SPECIFICATIONS
• Project Meetings
- Once a week at 281 N. College Ave Capital Projects Conference Area
- Time to be determined
- Agree to quantities weekly
- Monthly payments confine acceptance of quantities by the Contractor.
ALL quantity disputes MUST be resolved prior to monthly progress
payments.
Progress and Schedule Revisions
- Prior to construction, initial schedule must be submitted and approved
- Schedules shall be updated weekly
• The Contractor may be required to submit additional schedules
depending on the progress of the project.
HIGHLIGHTS FROM SPECIFICATIONS
Haul Routes
- Arterial and Collector streets only. Contractor will not be
allowed to use residential streets to access the site with
trucks hauling materials.
- The City reserves the right to dictate haul routes to
protect pavement and other material per Section 106
Site Clean-up
- The construction work shall be kept and accomplished in
a neat, clean and orderly fashion
- Tracking pads and street sweeping may need to be used
in order to minimize tracking and meet EPA storm water
quality requirements
- Dust control as required - City has dust control policy
SECTION 201 - CLEARING AND GRUBBING
Clearing and Grubbing — LS
— Includes removal of the following
• Bushes and shrubs as identified by
Engineer or City Forestery
• Material along Shields to facilitate sidewalk
installation
• Abandoned utilities above ground
• All removed debris becomes the property of
Contractor & needs to be disposed offsite.
SECTION 202 - REMOVALS
Removal of Concrete — Includes all ramps and sidewalks
- Saw Cutting equipment needs to be equipped with dust
management devices to meet the City's Dust Policy
Removal of Tree (Less than 8" Diameter) — EA
Removal of Tree (Greater than 8" Diameter) — EA
Removal of Curb and Gutter
Removal of Asphalt
1 /20/2017
no
SECTION 203
Laborer— HOUR
• Backhoe — HOUR
• Potholing — HOUR
— Investigative potholing for traffic caissons
— Potholing, Laborer & Backhoe will only be paid when
specifically requested by City Representative.
— All potholing required to perform work (excavations,
boring, trenching, etc) is considered incidental to the
work.
• Excavation —Along Shields for sidewalk installation
- 150 CY
SECTION 208 - EROSION CONTROL
Erosion Control — LS
— Includes work identified in preliminary erosion control
plan
— Work required to maintain clean job site, sweeping,
washout, etc.
— Other protections identified in order to meet stormwater
BM P's
— Dust Control
SECTION 403 - HOT MIX ASPHALT
• Hot Mix Asphalt (Grading S) (100) (PG 64-22) —TON
Match existing pavement section
1 /20/2017
7
1 /20/2017
SECTIONS 503, 608, 609 - CONCRETE
503 - Drilled Caisson (18 Inch) - LF
503 - Drilled Caisson (36 Inch) - LF
608 - Concrete Sidewalk (includes ramps and pedestnan curt) - SY
608 - Detectible Warnings - EA
609 - Modified Curb and Gutter (4" Rolled Curb, Match Existing) - LF
609 - Curb Type 2 (Section B) - LF
SECTIONS 610 - CONCRETE
610 - Concrete Bike Median (6" Thick) - SY
610 - Concrete Median Cover (6" Thick) - SY
gym°"•-.�a
SECTION 613 - ELECTRICAL
• 2 Inch Electrical Conduit (Bored) - LF
2Inch Electrical Conduit -LF
3 Inch Electrical Conduit (Bored) - LF
3 Inch Electrical Conduit- LF
Pull Box (13"x24"x18") - EACH
• Pull Box (18"x30"x18") - EACH
8