HomeMy WebLinkAboutRFP - 8026 FURNITURE FOR NEW UTILITIES ADMINISTRATION BUILDINGRFP 8026 Furniture for New Utilities Administration Building Page 1 of 26
REQUEST FOR PROPOSAL
8026 FURNITURE FOR NEW UTILITIES ADMINISTRATION BUILDING
The City of Fort Collins will be constructing a new office building starting in May of 2015.
Completion is expected May of 2016. The intent of this request is to select a vendor to
supply all the furniture for the new building and for that vendor to work through the
design process with the project team as a vested partner. This will allow the
coordination of the furniture systems layouts with the building design to minimize the
delays often involved in furnishing a new building. Furniture will include systems
furniture and freestanding furniture.
Proposals submission via email is preferred. Proposals shall be submitted in
Microsoft Word or PDF format and e-mailed to: purchasing@fcgov.com. If
electing to submit hard copy proposals instead, five (5) copies, will be received at the
City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins,
Colorado 80524. Proposals will be received before 3:00 p.m. (our clock),
December 12, 2014 and referenced as Proposal No. 8026. If delivered, they are to
be sent to 215 North Mason Street, 2
nd
Floor, Fort Collins, Colorado 80524. If mailed,
the address is P.O. Box 580, Fort Collins, 80522-0580.
The City encourages all disadvantaged business enterprises to submit proposals in
response to all requests for proposals and will not be discriminated against on the
grounds of race, color, national origin for all proposals for negotiated agreements.
A pre-proposal meeting will be held at 1:30 PM on November 6, 2014 at the
Operations Services Building located at 300 LaPorte Ave, Building B, Fort Collins.
Questions concerning the scope of the project should be directed to Project Manager,
Jennifer Harvey at (970) 221-6848 or jharvey@fcgov.com.
Questions regarding bid submittal or process should be directed to Doug Clapp,
CPPB, Senior Buyer at (970) 221-6776 or dclapp@fcgov.com.
All questions must be submitted in writing via email to Jennifer Harvey, with a
copy to Doug Clapp, no later than 5:00 PM (our clock) on November 21, 2014.
Questions received after this deadline will not be answered.
A copy of the Proposal may be obtained online from the Rocky Mountain E-Purchasing
system at: www.rockymountainbidsystem.com.
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
RFP 8026 Furniture for New Utilities Administration Building Page 2 of 26
The City of Fort Collins is subject to public information laws, which permit access to
most records and documents. Proprietary information in your response must be clearly
identified and will be protected to the extent legally permissible. Proposals may not be
marked ‘Proprietary’ in their entirety. Information considered proprietary is limited to
material treated as confidential in the normal conduct of business, trade secrets,
discount information, and individual product or service pricing. Summary price
information may not be designated as proprietary as such information may be carried
forward into other public documents. All provisions of any contract resulting from this
request for proposal will be public information.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council,
shall have a financial interest in the sale to the City of any real or personal property,
equipment, material, supplies or services where such officer or employee exercises
directly or indirectly any decision-making authority concerning such sale or any
supervisory authority over the services to be rendered. This rule also applies to
subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment,
kickback or any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited.
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal
will be rejected and reported to authorities as such. Your authorized signature of this
proposal assures that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive
any irregularities or informalities.
Sincerely,
Gerry S. Paul
Director of Purchasing & Risk Management
RFP 8026 Furniture for New Utilities Administration Building Page 3 of 26
Request for Proposal
8026 Furniture for New Utilities Administration Building
General Information
The City of Fort Collins will be constructing a new office building starting in the first
quarter of 2015. Completion is expected May of 2016. The intent of this request is to
select a vendor to supply all the furniture for the new building and for that vendor to
work through the design process with the project team as a vested partner. This will
allow the coordination of the furniture systems layouts with the building design to
minimize the delays often involved in furnishing a new building. Furniture will include
systems furniture and freestanding furniture.
While the exact building layout and dimensions are not yet finalized, it is anticipated that
the building will be a three story structure and approximately 37,500 square feet. The
foot print will be approximately 32’ deep and 134’ wide with a central core. The spaces
will be flexible usage that encourages innovation and collaboration. Current information
calls for:
Private Office PO-3 140 square feet Quantity = 7
Workstation WS-1 80 square feet Quantity = 19
Workstation WS-2 64 square feet Quantity = 124
Workstation WS-3 32 square feet Quantity = 24
Collaboration CO-1 4-6 people Quantity = 6
Small Conf. CO-2 10-12 people Quantity=3
Medium Conf. CO-3 15-20 people Quantity=2
Large Conf. CO-4 20-25 people Quantity=1
Training CO-5 80 people Quantity=1
Phone Booth PB-1 Individual Quantity=2
Coffee Bar CB-1 180 square feet Quantity=2
Lunch Room LR-1 600 square feet Quantity=1
Quiet Room QR-1 120 square feet Quantity=1
Lobby LB-1 700 square feet Quantity=1
Please note that these quantities are likely to change, but are suitable for the purposes
of this proposal.
Schedule for RFP process
Pre-Bid meeting: November 6, 2014 at 1:30pm
• Operation Services, 300 LaPorte Building B, Fort Collins
Last opportunity to ask questions: November 21, 2014 by 5:00 pm
RFP 8026 Furniture for New Utilities Administration Building Page 4 of 26
Final addendum issued: December 2, 2014
RFP due to City purchasing department: December 12, 2014 by 3:00pm
Notification to vendors: January 9, 2015
Product Review / Showroom tours: January 21, 2015 or January 22, 2015
Interviews with top 4 vendors: January 28, 2015
Award to Vendor: Week of February 2, 2015
Mock-ups due (Mock-up will stay up a minimum of 90 days) April 3, 2015
Anticipated construction started: May 1, 2015
Anticipated Installation of product: April 1, 2016
Requirements
The City of Fort Collins desires to have a furniture vendor provide design assistance,
guidance, and procurement of furniture and furniture systems. The selected vendor
must be able to work with both the City of Fort Collins and RNL Architects to perform
these tasks and selections. These services are to be included in a single Professional
Services Agreement.
• Development of furniture typicals with creative ideas
• Selection of products
• Procurement of products ?
• Installation of products and removal/disposal of all packaging materials
• Maintenance of products as per the warranty
• Sustainability – 3
rd
party certification and / or manufactures initiatives
• Education of design team on new products that might be appropriate for this
project
In the event it becomes necessary to revise any part of the “Request for Proposal” a
written addendum will be issued. Each Proposal shall state that it is valid for a period of
not less than ninety (90) days from date of proposal opening. Further, the City of
Fort Collins retains the right to reject all proposals and re-solicit, if deemed to be in the
best interest of the city.
In the interest in minimizing maintenance and reconfiguration problems over the life of
the furniture, the City prefers to have a single manufacturer. Furniture within the
manufacturer owned family will be accepted. Ancillary furnishings can be other
manufacturers. Notwithstanding this requirement, the City may, at its option, furnish
portions of the new building with products from other manufacturers, outside of this
contract.
More than one style may be bid if complete information is provide for each style and
submitted on separate bid forms.
All furniture must be highly durable, ergonomic and meet BIFMA standards.
RFP 8026 Furniture for New Utilities Administration Building Page 5 of 26
Steel must be between 16 gauge to 20 gauge – exceptions for minor pieces will be
reviewed as needed.
Work surface tops must meet or exceed 1 1/8” solid core high density particle with a
high pressure applied laminate surface.
The City of Fort Collins requires LEED Gold or higher on projects, and has the
expectation that the furniture will assist in meeting that requirement. All material and
sustainability cut sheets must be included as a part of the submitted proposal.
Pre-bid meeting is not required, yet it preferable that companies are present if possible.
Catalogs and price lists must be provided with the bid for all furniture pieces proposed.
Pricing worksheet should show the list price and the applicable discount including
available local or state contracts. List out which contract you are using for pricing and
your registration number for that contract. See the attached spreadsheet format.
The top four vendors based on the written proposals will be invited to interview. Access
to see the physical product must be provided prior to the interviews. This can be
accomplished through scheduling a tour of a local showroom that will last for 45 minutes
with the 5 members of the owner’s team. The tours will be scheduled after the
submission of the proposals.
In order to submit a proposal, each vendor must have successfully completed at least
three (3) new furniture installations similar in scope to this project and over $750,000
within the last 3 years.
The hired vendor must provide all drawings that relate to the project in an appropriate
format, AutoCAD, Revit, or Sketchup, to the City Facility Designer at the end of the
project or upon request. The City is currently running AutoCAD 2015, Revit 2015, and
Sketchup 2014. The architectural backgrounds will be provided in Revit 2014, preferred,
unless you require AutoCAD.
Responses Required
Please keep responses concise. Packets should not be more than 25 pages – not
including drawings, brochures, or pricelists. Refer to the numbers listed below in your
responses.
1. Vendor History
a. Number of years in partnership with primary furniture vendor
b. Number of years in business
c. Philosophy of the needs of a changing work environment
d. Personnel profiles and responsibilities for individuals that would be
working on this project
RFP 8026 Furniture for New Utilities Administration Building Page 6 of 26
e. Response to requests for modifications after installation. Including timing
for parts or labor if something needs to be fixed or reworked
f. Staff capacity for design, purchase, and warranty work
g. Availability of local technicians to perform the work
h. Processes that you have in place for Quality Assurance / Quality Control
i. Unique core competencies that will help you on this project
2. Manufacturer Information
a. Provide a letter certifying the vendor as the authorized
resellers/distributors in Northern Colorado
b. Support provided to local vendor
c. Will manufacturer fulfill customer service role should your company cease
to exist?
d. Manufacturer history
e. Philosophy of the needs of a changing work environment
f. Sustainability practices and certifications
g. Schedule to manufacturer the needed materials for this project
3. Previous Projects / References
a. Provide size, scope and contact information for projects of similar or larger
scale completed within the last five years
b. If three or more projects have not been completed in the last five years by
the proposed project team, provide three references that have worked with
the staff proposed for the projects. References cannot come from anyone
on the project team including the City of Fort Collins, RNL Architects, or
Adolfson and Peterson Construction
4. Product Requirements
a. All furniture must be freestanding and not mount to the walls. An exception
will be considered only for overheads in PO-3
b. Tile based system – Describe how tiles are constructed
c. Indicate specific line that you are proposing
i. Include a listing of options that are available within the line even if
you are not proposing them
ii. Does line have the option to run power or data through the panels?
iii. Option for task lighting that can connect to the furniture
d. Furnishings should encourage flexibility, innovation, and collaboration in
use and design
e. Multiple modes of works style must be accommodated so that employees
have options to choose from to best suit their changing need.
f. Furniture shall be of a medium grade and price, suitable for a general
office environment
g. Furniture is frequently reconfigured so the proposed system should be
able to withstand being able to be broken down, stored, and reset.
Durable construction is a must.
i. Describe reconfiguration process
RFP 8026 Furniture for New Utilities Administration Building Page 7 of 26
ii. Will new components need to be order each time?
iii. Local technician or technician available within 24 hours? If non-
local technician will travel be charged back to the City during
warranty or post-warranty service?
iv. Lead time if parts are needed
v. Is there a minimum order for future parts?
h. Provide floor plans and 3D renderings for typical workstations
i. Greenguard or third party sustainability certification?
j. System needs to be able to be added to with like or coordinating parts for
at least 15 years. Long life cycle for all parts
k. Lockable storage must be included for each person.
l. Easy maintenance
m. Looking for a vibrant feel that will be able to have a timeless quality
n. At least one section of each desk should be height adjustable to move
between sitting and standing to provide better ergonomic options in WS-1,
WS-2, and PO-3.
o. Chairs
i. Desk chairs should have high ergonomic functionality along with
durable construction and finishes.
ii. List task chairs as a separate line item. The City has an ergonomic
program and will have the option to purchase task chairs through
that program rather than this RFP.
iii. Chairs for community spaces (lobby, break room conference
rooms, etc) will be included in this RFP
p. Finishes & Upholstery
i. Standard options within the line. No custom colors or patterns
ii. Upholstery must be over 75k double rub
iii. All final selections will be reviewed and approved by the Facility
Designer and the project Interior Designer.
q. Open office with low walls between stations. Walls will be between 42” –
54”
r. Connecting pieces should be all metal. Plastic is not acceptable.
s. Stock will be added to the final order to have the most common parts and
pieces available in our warehouse
t. Warranty information on each component
u. Samples required
i. Proposals must include the pricing worksheet for all sample
furniture listed in Exhibit A, attached. The sample workstations and
furniture pricing are intended to facilitate a fair method of
comparisons between proposals and are not intended to represent
the eventual mix of furniture products used in the building.
ii. If your proposal is selected, at a minimum a mockup of WS-2, WS-
3, and CO-1 must be installed within an existing City facility.
Mockup will remain in place for a minimum of 90 days.
iii. Samples of all proposed options for materials and finishes shall be
submitted to the design team.
RFP 8026 Furniture for New Utilities Administration Building Page 8 of 26
5. Purchasing Restrictions
The proposer’s authorized signature on the proposal assures the team’s
compliance with City of Fort Collins’ purchasing restrictions. A copy of the
restrictions is available for review in the Purchasing and Risk Management
Division or the City Clerk’s Office. City of Fort Collins’ Resolution 91-121
requires that suppliers and producers of cement, or products containing cement,
to certify that the cement was not made in cement kilns that burn hazardous
waste as fuel.
6. Building design and construction standards manual
The City of Fort Collins has developed a Building Design and Construction
Standards Manual. This manual will be available for use by the selected team
and can be downloaded at the following address:
http://www.fcgov.com/opserv/design-standards.php.
7. State Taxation
The City of Fort Collins is exempt from all state and local taxation including sales
and use taxes.
RFP 8026 Furniture for New Utilities Administration Building Page 9 of 26
PROPOSAL EVALUATION CRITERIA
Vendors will be evaluated on the following criteria. These criteria will be the basis for
review of the written proposals and optional interview session. At discretion of the City,
interviews of top rated vendors will be held.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average
rating, and 5 being an outstanding rating.
WEIGHTING
FACTOR QUALIFICATION STANDARD
3.0 Scope of Proposal
Does the proposal show an understanding of
the project objective, methodology to be used
and results that are desired from the project?
2.0 Assigned
Personnel
Do the persons who will be working on the
project have the necessary skills? Are
sufficient people of the requisite skills assigned
to the project?
1.0 Availability
Can the work be completed in the necessary
time? Can the target start and completion
dates be met? Are other qualified personnel
available to assist in meeting the project
schedule if required? Is the project team
available to attend meetings as required by the
Scope of Work?
1.0 Motivation Is the vendor interested and are they capable
of doing the work in the required time frame?
2.0
Cost and
Work Hours
Do the proposed cost and work hours compare
favorably with the Project Manager's estimate?
Are the work hours presented reasonable for
the effort required in each project task or
phase?
2.0 Vendor Capability
Does the vendor have the support capabilities
the assigned personnel require? Has the
vendor done previous projects of this type and
scope?
RFP 8026 Furniture for New Utilities Administration Building Page 10 of 26
Reference Evaluation (Top Rated Vendor)
The Project Manager will check references using the following criteria. The evaluation
rankings will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION STANDARD
Overall Performance Would you hire this Professional again? Did
they show the skills required by this project?
Timetable
Was the original Scope of Work completed
within the specified time? Were interim
deadlines met in a timely manner?
Completeness
Was the Professional responsive to client needs;
did the Professional anticipate problems? Were
problems solved quickly and effectively?
Budget Was the original Scope of Work completed
within the project budget?
Job Knowledge
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction
contract, was the project functional upon
completion and did it operate properly?
Were problems corrected quickly and
effectively?
RFP 8026 Furniture for New Utilities Administration Building Page 11 of 26
Exhibit A
Panels & Materials
Panel heights should be no greater than 54” so that individuals have privacy when
seated and easy communication when standing; lower panels are preferred where
appropriate. Panels should have a noise reduction coefficient (NRC) greater than or
equal to 0.75. Sound transmission class (STC) shall be greater than or equal to 45.
When seated, an individual should have a privacy index (PI) between 85-95% so the
Articulation Index (AI) will be in the range of 0.15-0.05. [If you have a concern about
these standards, please submit a comment in writing to the project contact, Jennifer
Harvey Facility Designer jharvey@fcgov.com]
Desks & Storage
All workstations (WS-1, WS-2, PO-3) shall have at least one surface that is not attached
to a panel and is pneumatic height adjustable that will move at least between 28” and
48”.
All workstations must include task lighting that the individual can control.
Modesty panel to be included on each space, if work surfaces that are not attached to a
panel. The panel should not be load bearing and easily removed if required.
Overhead storage cabinets must not flip on top of the unit when open.
At least one set of lockable storage for each individual.
Design Guidelines
Creation of a collaborative and innovative environment that still maintains spaces for
individuals to work on sole pieces of a project in a semi-private setting.
Conference & Collaboration Rooms
Easy to move furniture that can accommodate multiple configurations.
A variety of heights should be made available throughout the building, ie seated 30”
height and bar height.
Spaces will be equipped with AV equipment as appropriate. AV components will be
purchased in a separate RFP process, but furnishing should allow for raceways,
electrical and AV to the extent possible.
Chairs
Task chairs to be highly adjustable for proper ergonomics. Steel frame, 5 leg pedestal
base with casters. Seat and back to be fully upholstered. Arms must clear the underside
of all work surfaces. Arms to be fully adjustable steel reinforced contoured soft integral
foam with a long lasting covering. Controls pneumatic cylinder for 5” seat height
adjustment, 5 degrees forward seat position with lock + dynamic motion through 20
degrees total range level seat position with lock + dynamic motion through 15 degrees.
Conferences, collaboration, break room chairs should all be easy to move and have
arms that slide easily under the proposed table for each space.
RFP 8026 Furniture for New Utilities Administration Building Page 12 of 26
The attached images are to be used for pricing purposes and are not representative of a final layout. Design will be worked
out with vendor and the design team.
RFP 8026 Furniture for New Utilities Administration Building Page 13 of 26
RFP 8026 Furniture for New Utilities Administration Building Page 14 of 26
The following worksheet must be filled out and submitted as part of your proposal.
Code Item Quantity Manufacturer and
Line List Price % Dis.
Warranty
(In Years) Unit Cost
Extended
Cost
C1 Ergonomic task
chair 174
C2 Side and
conference chairs 412
T1 30" Round table 7
T2 Table for 4-6
people 6
T3 Table for 10-12
people 3
T4 Table(s) for 15-20
people 2
T5 Table(s) for 20-25
people 1
T6
Training style
tables to
accommodate 80
people
RFP 8026 Furniture for New Utilities Administration Building Page 15 of 26
WS1
Workstation,
panels, and
storage based on
image 1
19
WS2
A
Workstation,
panels, and
storage based on
image 1
114
WS2
B
Workstation,
panels, and
storage based on
image 1
10
WS3
Workstation,
panels, and
storage based on
image 1
24
WS4
Workstation and
storage based on
image 2
7
TOTAL COST
RFP 8026 Furniture for New Utilities Administration Building Page 16 of 26
SAMPLE SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and , hereinafter referred to as "Service Provider".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Service Provider agrees to provide services in accordance with
the scope of services attached hereto as Exhibit "A", consisting of ( )
page and incorporated herein by this reference. Irrespective of references in Exhibit
A to certain named third parties, Service Provider shall be solely responsible for
performance of all duties hereunder.
2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement
shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B",
consisting of ( ) page , and incorporated herein by this reference.
3. Time of Commencement and Completion of Services. The services to be performed
pursuant to this Agreement shall be initiated within ( ) days following
execution of this Agreement. Services shall be completed no later than . Time is of
the essence. Any extensions of the time limit set forth above must be agreed upon in a
writing signed by the parties.
4. Contract Period. [Option 1] This Agreement shall commence upon the date of execution
shown on the signature page of this Agreement and shall continue in full force and effect
for one (1) year, unless sooner terminated as herein provided. In addition, at the option of
the City, the Agreement may be extended for an additional period of one (1) year at the
RFP 8026 Furniture for New Utilities Administration Building Page 17 of 26
rates provided with written notice to the Service Provider mailed no later than ninety (90)
days prior to contract end.
5. Contract Period. [Option 2] This Agreement shall commence , 200 , and shall
continue in full force and effect until , 200 , unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for
additional one year periods not to exceed ( ) additional one year periods.
Renewals and pricing changes shall be negotiated by and agreed to by both parties.
Written notice of renewal shall be provided to the Service Provider and mailed no later
than thirty (30) days prior to contract end.
6. Delay. If either party is prevented in whole or in part from performing its obligations by
unforeseeable causes beyond its reasonable control and without its fault or negligence,
then the party so prevented shall be excused from whatever performance is prevented by
such cause. To the extent that the performance is actually prevented, the Service
Provider must provide written notice to the City of such condition within fifteen (15) days
from the onset of such condition.
7. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Service Provider. Such notice shall be delivered at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in
writing by the parties. All notices provided under this Agreement shall be effective when
mailed, postage prepaid and sent to the following addresses:
Service Provider: City: Copy to:
Attn:
City of Fort Collins
Attn:
PO Box 580
Fort Collins, CO 80522
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
RFP 8026 Furniture for New Utilities Administration Building Page 18 of 26
In the event of early termination by the City, the Service Provider shall be paid for services
rendered to the date of termination, subject only to the satisfactory performance of the
Service Provider's obligations under this Agreement. Such payment shall be the Service
Provider's sole right and remedy for such termination.
8. Contract Sum. The City shall pay the Service Provider for the performance of this
Contract, subject to additions and deletions provided herein, ($ ) as per the
attached Exhibit " ", consisting of page , and incorporated herein by this
reference.
9. City Representative. The City will designate, prior to commencement of the work, its
representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the services provided under this agreement. All
requests concerning this agreement shall be directed to the City Representative.
10. Independent Service provider. The services to be performed by Service Provider are
those of an independent service provider and not of an employee of the City of Fort
Collins. The City shall not be responsible for withholding any portion of Service Provider's
compensation hereunder for the payment of FICA, Workmen's Compensation or other
taxes or benefits or for any other purpose.
11. Subcontractors. Service Provider may not subcontract any of the Work set forth in the
Exhibit A, Statement of Work without the prior written consent of the city, which shall not
be unreasonably withheld. If any of the Work is subcontracted hereunder (with the
consent of the City), then the following provisions shall apply: (a) the subcontractor must
be a reputable, qualified firm with an established record of successful performance in its
respective trade performing identical or substantially similar work, (b) the subcontractor will
be required to comply with all applicable terms of this Agreement, (c) the subcontract will
not create any contractual relationship between any such subcontractor and the City, nor
RFP 8026 Furniture for New Utilities Administration Building Page 19 of 26
will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work
of the subcontractor will be subject to inspection by the City to the same extent as the
work of the Service Provider.
12. Personal Services. It is understood that the City enters into the Agreement based on the
special abilities of the Service Provider and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Service Provider shall neither assign
any responsibilities nor delegate any duties arising under the Agreement without the prior
written consent of the City.
13. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the
services shall not be construed to operate as a waiver of any rights or benefits provided to
the City under this Agreement or cause of action arising out of performance of this
Agreement.
14. Warranty.
a. Service Provider warrants that all work performed hereunder shall be performed with
the highest degree of competence and care in accordance with accepted standards for
work of a similar nature.
b. Unless otherwise provided in the Agreement, all materials and equipment incorporated
into any work shall be new and, where not specified, of the most suitable grade of their
respective kinds for their intended use, and all workmanship shall be acceptable to
City.
c. Service Provider warrants all equipment, materials, labor and other work, provided
under this Agreement, except City-furnished materials, equipment and labor, against
defects and nonconformances in design, materials and workmanship/workwomanship
for a period beginning with the start of the work and ending twelve (12) months from
RFP 8026 Furniture for New Utilities Administration Building Page 20 of 26
and after final acceptance under the Agreement, regardless whether the same were
furnished or performed by Service Provider or by any of its subcontractors of any tier.
Upon receipt of written notice from City of any such defect or nonconformances, the
affected item or part thereof shall be redesigned, repaired or replaced by Service
Provider in a manner and at a time acceptable to City.
15. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default thereof.
16. Remedies. In the event a party has been declared in default, such defaulting party shall
be allowed a period of ten (10) days within which to cure said default. In the event the
default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting
party commences legal or equitable actions against the defaulting party, the defaulting
party shall be liable to the non-defaulting party for the non-defaulting party's reasonable
attorney fees and costs incurred because of the default.
17. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors,
heirs, personal representatives, successors and assigns of said parties.
18. Indemnity/Insurance.
a. The Service Provider agrees to indemnify and save harmless the City, its officers,
agents and employees against and from any and all actions, suits, claims, demands or
liability of any character whatsoever brought or asserted for injuries to or death of any
RFP 8026 Furniture for New Utilities Administration Building Page 21 of 26
person or persons, or damages to property arising out of, result from or occurring in
connection with the performance of any service hereunder.
b. The Service Provider shall take all necessary precautions in performing the work
hereunder to prevent injury to persons and property.
c. Without limiting any of the Service Provider's obligations hereunder, the Service
Provider shall provide and maintain insurance coverage naming the City as an
additional insured under this Agreement of the type and with the limits specified within
Exhibit , consisting of one (1) page, attached hereto and incorporated herein by
this reference. The Service Provider before commencing services hereunder, shall
deliver to the City's Director of Purchasing and Risk Management, P. O. Box 580 Fort
Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage
required from an insurance company acceptable to the City.
19. Entire Agreement. This Agreement, along with all Exhibits and other documents
incorporated herein, shall constitute the entire Agreement of the parties. Covenants or
representations not contained in this Agreement shall not be binding on the parties.
20. Law/Severability. The laws of the State of Colorado shall govern the construction
interpretation, execution and enforcement of this Agreement. In the event any provision of
this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision
of this Agreement.
21. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et.
seq., Service Provider represents and agrees that:
a. As of the date of this Agreement:
RFP 8026 Furniture for New Utilities Administration Building Page 22 of 26
1. Service Provider does not knowingly employ or contract with an illegal alien who
will perform work under this Agreement; and
2. Service Provider will participate in either the e-Verify program created in Public
Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th
Congress, as amended, administered by the United States Department of
Homeland Security (the “e-Verify Program”) or the Department Program (the
“Department Program”), an employment verification program established pursuant
to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of
all newly hired employees to perform work under this Agreement.
b. Service Provider shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
c. Service Provider is prohibited from using the e-Verify Program or Department Program
procedures to undertake pre-employment screening of job applicants while this
Agreement is being performed.
d. If Service Provider obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Service
Provider shall:
1. Notify such subcontractor and the City within three days that Service Provider has
actual knowledge that the subcontractor is employing or contracting with an illegal
alien; and
2. Terminate the subcontract with the subcontractor if within three days of receiving
the notice required pursuant to this section the subcontractor does not cease
RFP 8026 Furniture for New Utilities Administration Building Page 23 of 26
employing or contracting with the illegal alien; except that Service Provider shall
not terminate the contract with the subcontractor if during such three days the
subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Service Provider shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the “Department”) made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the
authority established in Subsection 8-17.5-102 (5), C.R.S.
f. If Service Provider violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If
this Agreement is so terminated, Service Provider shall be liable for actual and
consequential damages to the City arising out of Service Provider’s violation of
Subsection 8-17.5-102, C.R.S.
g. The City will notify the Office of the Secretary of State if Service Provider violates this
provision of this Agreement and the City terminates the Agreement for such breach.
22. Special Provisions. Special provisions or conditions relating to the services to be
performed pursuant to this Agreement are set forth in Exhibit " " - Confidentiality,
consisting of ( ) pages, attached hereto and incorporated herein by this
reference.
RFP 8026 Furniture for New Utilities Administration Building Page 24 of 26
CITY OF FORT COLLINS, COLORADO
a municipal corporation
By:_______________________________
Gerry Paul
Director of Purchasing and Risk Management
Date:_____________________________
ATTEST:
_________________________________
City Clerk
APPROVED AS TO FORM:
________________________________
Assistant City Attorney
By:_______________________________
__________________________________
PRINT NAME
__________________________________
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:_____________________________
RFP 8026 Furniture for New Utilities Administration Building Page 25 of 26
EXHIBIT
INSURANCE REQUIREMENTS
1. The Service Provider will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Service Provider shall furnish the City with certificates of insurance
showing the type, amount, class of operations covered, effective dates and date of
expiration of policies, and containing substantially the following statement:
"The insurance evidenced by this Certificate will not be cancelled or materially
altered, except after ten (10) days written notice has been received by the City of Fort
Collins."
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Service Provider, such
insurance as the City may deem proper and may deduct the cost of such insurance from
any monies which may be due or become due the Service Provider under this
Agreement. The City, its officers, agents and employees shall be named as additional
insureds on the Service Provider's general liability and automobile liability insurance
policies for any claims arising out of work performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Service Provider shall
maintain during the life of this Agreement for all of the Service Provider's
employees engaged in work performed under this agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Service Provider shall maintain
during the life of this Agreement such commercial general liability and automobile
liability insurance as will provide coverage for damage claims of personal injury,
including accidental death, as well as for claims for property damage, which may
arise directly or indirectly from the performance of work under this Agreement.
Coverage for property damage shall be on a "broad form" basis. The amount of
insurance for each coverage, Commercial General and Vehicle, shall not be less
than $1,000,000 combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Service Provider shall
be responsible for any liability directly or indirectly arising out of the work
performed under this Agreement by a subcontractor, which liability is not covered
by the subcontractor's insurance.
RFP 8026 Furniture for New Utilities Administration Building Page 26 of 26
EXHIBIT
CONFIDENTIALITY
IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to
this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been
informed that the City has established policies and procedures with regard to the handling of
confidential information and other sensitive materials.
In consideration of access to certain information, data and material (hereinafter individually and
collectively, regardless of nature, referred to as “information”) that are the property of and/or
relate to the City or its employees, customers or suppliers, which access is related to the
performance of services that the Service Provider has agreed to perform, the Service Provider
hereby acknowledges and agrees as follows:
That information that has or will come into its possession or knowledge in connection with the
performance of services for the City may be confidential and/or proprietary. The Service
Provider agrees to treat as confidential (a) all information that is owned by the City, or that
relates to the business of the City, or that is used by the City in carrying on business, and (b) all
information that is proprietary to a third party (including but not limited to customers and
suppliers of the City). The Service Provider shall not disclose any such information to any
person not having a legitimate need-to-know for purposes authorized by the City. Further, the
Service Provider shall not use such information to obtain any economic or other benefit for itself,
or any third party, except as specifically authorized by the City.
The foregoing to the contrary notwithstanding, the Service Provider understands that it shall
have no obligation under this Agreement with respect to information and material that (a)
becomes generally known to the public by publication or some means other than a breach of
duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed,
provided that the request for such disclosure is proper and the disclosure does not exceed that
which is required. In the event of any disclosure under (b) above, the Service Provider shall
furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and
shall promptly advise the City in writing of each such disclosure.
In the event that the Service Provider ceases to perform services for the City, or the City so
requests for any reason, the Service Provider shall promptly return to the City any and all
information described hereinabove, including all copies, notes and/or summaries (handwritten or
mechanically produced) thereof, in its possession or control or as to which it otherwise has
access.
The Service Provider understands and agrees that the City’s remedies at law for a breach of the
Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that
the City shall, in the event of any such breach, be entitled to seek equitable relief (including
without limitation preliminary and permanent injunctive relief and specific performance) in
addition to all other remedies provided hereunder or available at law.