Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 91520190/ / �� 2�c (9 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Michael Baker Jr., Inc. DATED: April 2, 2015 Work Order Number: Baker-21-254902200-15 Purchase Order Number: Project Title: Bridge Inspection, Maintenance, Repair and Replacement Program Service Life Estimations for Bridge Network Original Bid1RFP Project Number & Name: 7175 Bridge Inspection, Maintenance, Repair and Replacement Program Commencement Date: July 15, 2015 Completion Date: October21, 2015 Maximum Fee: (time and reimbursable direct costs): Not to Exceed $31,874.95 Project Description: See Attached Scope of Services: See Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Five (5) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date: City of Fort Collins Byi Project Manager Date: !tt/_r"A 'D Lf 2-0/ ti By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: Exhibit "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MICHAEL BAKER JR., INC. DATED: March 25, 2015 Work Order No. Purchase Order No. Project title: Bridge Inspection, Maintenance, Repair and Replacement Program Service Life Estimations for Bridge Network Commencement Date: July 15, 2015 Completion Date: October 21, 2015 Maximum Fee: $31,874.95 PROJECT DESCRIPTION: The City of Fort Collins is interested in gaining a stronger understanding the current condition of their assets (i.e. pavements, bridges, pedestrian facilities, etc.) and is considering improved methods for managing these assets. In terms of cost and public safety, one of the most significant asset classifications is the bridges that are owned and maintained by the City. It is estimated that there are approximately 312 bridges within the City's network (both minor and major structures) which includes approximately 68 minor structures that have not previously been inspected. While asset management is a sophisticated process involving many layers of evaluation and prioritization, this scope is focused specifically on the structural condition of individual bridges. As the current on -call bridge inspection firm, Baker is ideally suited to provide the best available information for the current structural condition, as well as an insight into potential future conditions as these bridges age. While determining potential the future condition of a bridge is not simple, it is possible to predict future condition based on age, current condition, historical performance of similar bridges, and specific attributes among other things. For purposes of this scope, the prediction of structural condition is hereby referred to as "estimated remaining bridge service life". The estimated remaining bridge service life, or alternatively described as "recommended programming" or "optimal replacement", is simply an empirical metric for estimating when money should be allocated to replace any given bridge. The term estimated remaining bridge service life should not be taken as calculated or exact. The primary purpose of this project is to review each of the bridges within the City's network and provide an estimated remaining bridge service life with intent towards aiding the City's management of all assets. Exhibit A - Work Order Form Bridge Inspection, Maintenance, Repair and Replacement Program — Estimated Bridge Service Life It is important to note that the City understands and acknowledges that the information provided by Baker with this project will be approximated at best. The City will not hold Baker responsible for the accuracy of these recommendations, and all information provided will be without liability. This work order is performed under the master agreement for the City's Bridge Inspection, Maintenance, Repair, and Replacement Program. Work elements include project administration, field assessments, and estimated remaining bridge service life. A detailed description of each anticipated service is described below. SCOPE OF SERVICES: In support of this project, Baker will perform a number of tasks and provide several deliverables. The tasks are described below are contingent upon the completion of the scope of work to be completed in the previous work order (Work Order 20) for the Service Life Estimations for Bridge Network. I. Project Administration Upon notice to proceed, Baker will perform project administration duties throughout the length of the contract. A. Invoices will be provided to the City on a monthly basis and will include a billing summary and a progress report for work performed during the current billing period and project to date. B. All documents will receive a quality assurance and quality control (QA/QC) review, in accordance with the Baker Way, prior to submittal. II. Bridge Evaluations and Service Life Assessments Based upon the procedures developed in Work Order 20 for the Service Life Estimations for Bridge Network, Baker will evaluate and categorize all network bridges based on the estimated remaining bridge service life. The evaluations will be summarized and documented. Scope items include: A. Prepare a master spreadsheet of evaluation criteria and estimated remaining bridge service life for each bridge. B. Prepare a brief description for each bridge documenting the information and reasoning behind the estimated remaining bridge service life. Specific recommendations may also be included if appropriate to describe recommendations for immediate repairs, ongoing maintenance, or other relevant information. It is anticipated that this structure description will be approximately '/s pages in length. C. Prepare a summary cover sheet documenting the findings for the overall bridge network. D. Present the findings to the City. E. Revise the evaluations and documents as appropriate in response to City comments and recommendations. F. Package up electronic and hard copy deliverables and submit to the City. March, 2015 2 of 3 GUIDELINES AND REFERENCES No bridge inspections will be performed as part of this contract. However, visual evaluations will be conducted in a manner consistent with inspections, and in accordance with current NBIS standards and supervised by personnel meeting the requirements outlined in the Code of Federal Regulations, 23 CFR 650.307. Applicable inspection standards may include: • CDOT PONTIS Bridge Inspection Coding Guide • Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation's Bridges (Report No. FHWA-PD-96-001) • Bridge Inspector's Reference Manual (Publication No. FHWA NHI 12-049) • CDOT Bridge Rating Manual • Any other applicable documents as approved by the City DELIVERABLES The following is an estimate of the deliverables required for this project. As the project develops, the type and number of deliverables may vary. Refer to the detailed discussions above for further information. All inspection information shall be compiled in an electronic format and delivered to the City at the end of the project. 1. Project Administration (Ongoing) • Monthly progress reports with monthly invoices • Quality Control review of all project deliverables prior to submittal 2. Estimated Remaining Bridge Service Life (delivered at the end of the project). The final submittal will include one hard -copy printed set of bound documents, and one electronic pdf file. Documents included in this submittal are: • Estimated Remaining Bridge Service Life Memorandum • Summary of findings • Individual structure descriptions A final schedule will be determined in coordination with the City. It is anticipated that the work will begin on July 15, 2015 and continue through October 2015. Exhibit "B" Task Order 21 Fee Summary for Michael Baker Jr., Inc. City of Fort Collins Bridge Inspection, Maintenance, Repair and Replacement Program Description: Service Life Estimations for Bridge Network PRIMARY DESIGN TASK ELEMENTS TOTAL• LABOR Project Management & Meetings Structure Evaluations and Service Life Assessments 16 288 $1,960.32 $29,812.38 Subtotal 304 $31,772.70 REIMBURSABLE EXPENSES: (Approximate) Copies & Plotting (B&W) (50 x $0.05) Copies & Plotting (Color) (50 x $0.50) -- $2.50 $25.00 Mileage ($0.575/mi) (1 trips @ 130 mi/trip) 1L $74.75 Subtotal 102.25 312512015 1 of 1 DESIGN SERVICES FOR SERIVCE LIFE ESTIMATIONS FOR BRIDGE NETWORK — Hours Fee Estimate — Mirheol Rialto, Intornatinnal ESTIMATED PROJECT HOURS & FEE OA/OD 5mnmm•I Structurel Manager IN•movitx7 Project Manager Johmoo7 Structural Engineer (zwege) Structural Engineer (fnylor) Structural Catltl (Terrell) Admin. Assistant (Robbins) Subtotal Role/Personnel Work Element Description Rate $194.54 $14797 $12252 $18W 11UU E3 $53.69 82.02 PR JECT ADMINI TRATI NB EETIN Project Billin and Pro revs Reports 4 4 General Project Mara omsnt 12 i HOURS SUBTOTAL 0 0 16 0 0 0 0 16 FEE SUBTOTAL $0.00 $0.00 $1.960.32 $0.00 $0,00 S0.00 $0,00 $1.960,32 STRUCTURE EVALUATIONS AND SERVICE LIFE ASSESSMENTS Obtain and Summarize Relevant Metric Data from the Inspection 9 9 9 27 Prepare Master Spreadsheet of Evlauation Criteria 18 18 18 54 Prepare Service Life Narrative for Each Structure 36 36 36 ice Consolidate All Narratives and Evaluations 6 6 Prepare Executive Summaryend Coversheet 18 18 Perform OC of Final Document 4 4 4 4 16 Draft Service Life Assessment Deliverables Review Meeting 6 6 12 Prepare Final Document wl Comments 10 10 Perform QC Final Document 4 4 4 4 16 Package Final Deliverables (Soft and Hard Copy) for City 3 6 12 21 0 HOURS SUBTOTAL 8 14 80 103 71 0 12 288 FEE SUBTOTAL $1,556.32 $2.071.58 $9.B01.60 $8,133.91 $7,144.73 $0.00 $1.104.24 $29,812.38 BAKER TOTAL HOURS BY STAFF 8 14 96 103 71 0 12 304 BAKER TOTAL FEE BY STAFF $1,556.32 $2,071.58 $11,761.92 $8,133.91 $7.144.73 $0.00 $1,104.24 $31.772.70 TOTAL PROJECT HOURS & FEE 304 $31,772.70 157 structures, 10 minutes per structure 312 structures, 10 minutes per structure 312 structures, 20 minutes per si ucure 3/25/2015