Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7491 BLOCK 32 CM/GC IMPROVEMENTSEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Adolfson & Peterson Construction DATED: 7/25/13 Work Order Number: OP-452626 Project Title: Utilities Admin Building — Relocate Laboratory Building 222 LaPorte Ave. Commencement Date: April 27, 2015 Completion Date: June 26, 2015 Maximum Fee: (time and reimbursable direct costs): $72,577 Protect Description: Relocate the Laboratory Building at 222 LaPorte Avenue to the east approximately 100 feet and to the north 5 feet as shown in the new plans for the Utility Administration Building. Scone of Services: The Construction Manager/General Contractor (CM/GC) will develop a plan for relocating the Laboratory building at 222 Laporte Avenue. This plan will need to be approved by Landmark Preservation Commission and then put Into place and carried out once the new footings and foundations have been completed for the Laboratory building at the new location. The relocation plan will be submitted to the City of Fort Collins and a permit issued prior to work beginning. The CM/GC will need to Incorporate any items necessary maintain stormwater requirements during the scope of work. General condition charges will be allowed as per Exhibit C of the RFP along with the approved rates. Each invoice shall have detailed itemization of each item submitted and no contingency spent without Owner approval. Total Invoice to be within the not to exceed amount as listed above. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity City of Fort Ilins Faciiities ect Manager ian Hergpftt By: Date: .2 in the terms of the Professional By: Services Agreement and this work Director of Purchasing and order (including the attached forms) the (if over $60,000.00) Professional Services Agreement shall Date: control. The attached forms consisting of Ten (10) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Risk Management Contractor: Adolfson & Peterson Construction Signature: Z' 7 Name: Eric Kimmelshue, Sr. Project Manager Date: 3/26/2015 movement, tree removal, written permission as necessary for access or egress, state patrol or police escort if required by state, etc. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. Building cannot be transported or work performed during inclement weather, temperatures under 32 degrees or when roads or earth are unsafe and/or unstable for travel. Mammoth Structural Movers, Inc and its employees will NOT be responsible for any personal effects left on premises during these processes. Please make sure that anything of sentimental value or otherwise is removed from the premises before work commences. The Owner is to carry fire, tornado, vandalism and other necessary insurance not covered by our policies. Mammoth Structural Movers, Inc. will not be responsible for inherent structural damage. Mammoth will make every effort to preserve plumbing and wiring that is left in place but will NOT be responsible for any damage in our efforts to move this structure. Mammoth will make every effort in order to preserve landscape and sidewalks, etc but does not guarantee it from damage during the move processes. Please make sure any important landscape features arc removed before Mammoth work commences. Access to these areas needs to be provided to Mammoth. After three business days from date of signing this paperwork, deposit is nonrefundable and will be applied to mobilization. In the event a subcontractor agreement is required for this work, Mammoth Structural Movers, Inc. will require our terms to be included in your paperwork. Acceptance of Proposal The above prices, specifications and conditions arc satisfactory and are hereby accepted. You arc authorized to do the work specified. Payment will be made as outline above. Signature Si Owner/Agent for Owner Date of Acceptance Authorized Agent for Mammoth Structural Movers, Inc. Date of Acceptance Ryberg Construction Co. Inc. 17843 W.C.R. 6 Brighton, Co. 80603 Office 303 659 5943 Fax 303 659 8495 Email W2260(a),hotmail.com March 3, 2015 To-Bradon Hill Adolfson & Peterson Construction 797 Ventura Street Aurora, Co. 80011 Subject- Relocation of masonry building located on city of Fort Collins property at on the North east corner of Laport & Howes streets Relocate building to the South east corner of property and set on new foundation provide by others $30,750.00 Moving contractor will remove concrete slab and excavate inside of building for relocation; disposal of slab debris and excavated dirt to be done by others Exclusions - Utility disconnect and reconnections New excavation and new foundation Any site work need for building relocation Engineering Permits Bonds Any plumbing, heating, and electrical work Removal of existing foundation Disposal of any debris created by moving operation Any asbestos or lead paint removal, abatement, testing and permitting Any changes to insurance other than currently carried by Ryberg Construction Co Inc. Current insurance certificates available upon request Customer is to supply adequate and acceptable delivery site for building relocation. All foundation work must be coordinated with mover prior to foundation work commencement. Any foundation work performed without coordination with mover or not done to mover requirements may result in project delays and additional charges. Note- Effective January 1, 2015, All, moving contract must be on movers form and sign by property owner. No third party contract will be allowed. WOP,GUNU CONCRETE Proposal 275 Casper Rd. Livermore, CO 80536 e-mail: david@topgunconcrete.com Phone (970) 988-8003 March 17, 2015 Pmposet 5ubmated To. Adolfson & Peterson Phone: 303/363-7101 swat: e-,,yen: edimmickta)a-D.com City, State, and Zip Code, Job Nome. Butterfly Building Attention: Eric Dimmick Job LmiVon. Ft. Collins, CO uantit Units UniUCost Totals SCOPE OF WORK: Footings & Walls: 1 LS $6,500.00 $6,500.00 Slab: 400 SF $5.50 $2,200.00 TOTAL = $8,700.00 Items by Us: Items by Others: To place and finish Elevations and layout To set edge forms To supply & lay wire mesh To supply & tie rebar in footing & walls To Soft Cut To cure stabs Concrete Concrete Pump Bid Based On: Exclusions: Drawings Dated 316115 Concrete Wash -Out Excavation & Backfill Grading Material Weather & Winter Protection Subgrade and compaction Traffic Control Permits & Fees Nate: This Propose, May Be withdmmn By Us It Not Accepted within 20 Days. Authorized Signature ACCEPTANCE OF PROPOSAL PLEASE SIGN AND RETURN ONE COPY. Date of Acceptance: Company Name Signature Adolfson & Peterson Construction T97 Ventura Street, Aurora, 00 90011 Project LUdy AdmWabativn Bulding Client City of Fort Colku Architect RNL Design, NoM*m Enginwri g JVA Date- March 23.2015 PrecantruWon Manager. Edo T. Di nick Bustling SF. 400 Duration In W04%, 5 Estimate ContruWon Coat Butterfly Building Relocation Construction Cost Summmy New Building Dlvbkn 0 General Conditions $O 50.00 /SF. 0. DO% of project Dlvbkn 1 General Requirements $11 526 528.82 JSFj 17.42% d P ed Division 2 Demolition $1.910 $4.78 /SF 2.89% d P Dlvbkn3 Concrete $6,600 S1650 /SFI 999% d Projild _Division 4 MasorvV So fSF 0.00% ofproject Dtvision5 Metals $38W _MOD $9.50 ISF 5.74% of Pmaject Division cowpapAry $2892 S7.23 fSF 437% dP ect Division 7 Thermal III, Moisture Prvlactbn S640 $1.60 ISF 0.97% of Issoject Division 5 Dori 6 Windows S0 $0.00 ISF 0.00% of PMect DivWm 9 Flnistm S4 $0.00 ISF 0.00% d ed Division 10 SO $0.00 ISF Division 11 So SD.00 ISF 0.00% of Pallect Division 12 Furnistangs So SOAO ISF 0.00% of Proiect Division 13 Special Construction $30 750 S76.66 ISF 46.49% of ect Division 14 Conveyft Systerns So SO.00 ISF 0.00% of Pr4ect Division 21 Firs Suppression SD 50.00 ISF 0.00% of PMW Division 22 PtLxnbkV SO SO 00 ISF O.OD% of Protect Division 23 Heaft, VerTUalhn 6 Air Card SO $ol 00 ISF g.00% d Proied Division 26 Electrical $O 56.00 ISF 0.00% of Froied Division 27 Communkabons SD $000 ISF 0.00% of Proied Division 28 Bectronk Safiely S SecuMy SO SO 00 ISF 0.00% of Pr4ed Division 31 Ea10n/ark $6 916 $17.29 ISF 10.441% of PrWect Otvision 32 Exterior Im ravemerns $1,116 52.79 ISf 1-89X d Prowl Division 33 UW9fee SD SO DO IS f OAO% of Proied Corr of Work Suboow $41111115111 $165,37 fSF 87.14% of Projed Weathw Con litkm Alkw9nce Not Irchided SO.00 ISF 0.00% d TW, DevellMnerd Fees Not Inchded $0.00 ISF 0.00% d Pricied Stakling P Plan Cheek Fee Not Induded SO.00 ISF 0.00% of PffAed State Saks & Use Tax Tex EXSMPk SO.00 ISF 0.00% of Pidod CUC Reduced to SO at FGM .00 ISF7ofSt"oW C49 of Work CAOGC Camtndlon S13.23 ISFof Cost dwak SuMm Risk Wourance $143 $0.36 ISFofSt"oWSubmrl4ador rd S827 5207 ISFd Cost d WorkGwwal arai a S797 $1.99 /SFd SubtotalPerlormance Labor 6 Material Bond 5439 SI.10 fSFof SubtotalCoat Escalation Albwanoe Reduced la SO at FGM Not Inckded SD.00 /SFof SubtaialComtrudion Ma eeg Fee Fbr RF 5322 ISFof SuboalPrecontructw Services Fee SB74 52.44 fSFo1 lioMct Project Cost Total $75.910 $199.78 ISF 100% of Project Project Aaematea liaise era ,at CWrjy Md daa M tM a ft fatal atawai Overamavale for new buedtrq slab, 24' deep Underalab gravel under new building tab, 4' tfdck New 4' budding floor slab wilt W WF reinforcing 6 vapor barrier Remwal 6 disposal of existiV widows 8 necessary at Ome of relDmltkn, OR with wood $6,771 $552 S2,463 $1,889 FACILITIES REQUISITION FORM VENDOR Adolfson & Peterson Construction DATE 3-26-15 REQ BY: Brian Hergon • Opemdon Services CHARGE# 510108.562020 Work Order # OP452626 Billable? Y/N Yes TOTAL COST: $72,577.00 - BUYER: John Stephen OTY DESCRIPTION COST Relocate the Laboratory Building at 222 LaPorte Ave approximately 105 feet east and 5 feet north and coordinate with the new UAB site plan. Involves site work, new footings and foundations, interior structural. $72,577.00 ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: Adolfson & Peterson Construction 797 Ventura Street, Aurora, CO 80011 Project: Utility Admidstretion Bulidirg Ment City of Fort Collins Architect: RNL Design. Northern Engineenng, JVA Date: March 23. 2015 Revised. March 24, 2015 Prermstnution Manager: Eric T. Dirnmick Bumig SF: 4w Duration in Wanks: 5 EaOmale: Construction Cast Butterfly BuIldina Relocation Construction Cost Summary Division 0 General Conditions s0 SD.00 ISF 0.00% of Protect Division 1 General R uiremer" $9.694 S24.24 ISF 15.34% of Pro ect Division 2 Demolition SI.910 $4.78 /SF 3.02% of Division 3 Concrete S6,600 $16-50 ISF 10.44% of act Division 4 Mae so $0.00 ISF 0.00% of Project Division 5 Metals S3.800 59.50 ISF 6,01% of Project Division 6 Carpentry S2.148 S5.37 ISF 3.40% of Project Division 7 Thermal L Moisture Protection S640 SI.60 !SF 1.01% of Project DMBkm 8 Doors L Windim $0 SO-00 /SF 0.00% of Project Division 9 Rnlshes $0 $0.00 ISF 0.00% of Project Division 10 specious so $OM ISF 0,00% of Project Division 11 Equipment s0 S0.00 ISF OM0% of act Division 12 Furniallimlis SO $0.00 !SF 0,00% of Project Division 13 Special Construction $30.750 S76.88 ISF 48.65% of Project Division 14 Conv Systems so SO.00 ISF 0.00% of Project Division 21 Finn Suppression so SO.00 /SF 0.00% of Project Division 22 Plumbing s0 $000 ISF 0.00% of act Division 23 Hea . Verok2don L A6 C*nditiomrq so SO.00 ISF 0.DO% of Project Divislort 26 Electrica. SO SO.00 ISF 0.00% of Project Division 27 Communications so s0.00 ISF 0.00% of Project Division 28 Electronic Safety L Security SO SO-00 ISF 0.00% of "act Division 31 EarBnvrk 56.550 $16.38 fSF %P Division 32 Exterior Improvements 51.116 5279 ISF 7 1%of ct 33 UBles 0.00% of at cDivision Cost of War* Subtatat $63,207 $158.02 ISF 97.09% of Project Weather Conditions Mlovrance Not Included SO.00 ISF 0.00% o/ Project Utility. Tap. Development Fees Not Included SO.00 /SF 0.00% of act Building Permit. Plan Check Fee Not Included S0.00 ISF 0,00% of Project State, Safes L Use Tax Tax Exempt S0.00 ISF 0.00% of act CM/GC Biddim QnU a Reduced to SO at FGMP Not Included SOM ISF 0.00% of Cost of Work CMIGC Construction Contingency S5.057 S12.64 ISF 8.00% of Cost of Work Builder: Risk Insurance S137 SO.34 ISF 0.20% of Subtotal Sub=nua=r Su uard $790 SI.98 ISF 1.25% of Cost of Work General Liability Insurance $761 51.90 ISF 1.10% of Subtotal Performance. labor L Material Bond S420 51.05 ISF 0.60% of Subtotal Cost Earalatlon Aliowance Reduced to $O of FGMP Not Included 1 50.00 !SF 0.00% of Subtotal Construction ens Fen Fer RF 51.232 $3.08 !SF 1.75% of Subtotal Preconstrunbn Services Fee I S974 I S2.44 ISF 1.34% of 'act Prey Cat Total Mal" $IAIA4 ISF 100%. of Prejed Project Altamatea(C<att heidane eel mini eckrdeehr me aatlmafa mew aaovd Overexcavate for now building stab, 24' deep Underslab gravel under new budding stab, 4'thick New 4' budding floor stab with W W F rektforcLlg L vapor bonier Removal L disposal of existng windows 9 necessary at time of reocation, Inrdl with wood $6.775 $552 $2,454 S1,890 v 30,Mp Saselr awldr A.NR.s/.rl. �� OM. RNnMa DrASSOM 0 -GENERAL CONWVN50. THE CCNTR cY«N cowm l d a. Geaa.n A. NdY 1 Nall. 1. Nd YIt1uWN I t]WhJtl lfti Nd meww 3 ! fi m bm.d 1Y Nd wdWY Orr . % En dr .m 4w Nd wdWW Ors 5 D .N & Nd YrdueY +ma.a 1 dFdt Cabe• e.wX as 1... NdY " oe. > C d Fol CaM. .r. 4Y Nd YldudY °"� DN4bnS-sYdm TpW s w 3 11IllIOM 1- GENERAL REC ENENTII sb.wu Md w 1 axn m.0 .ww• wdW.d 3 R cas4.N On bem.W YVArd.d 6 CVN Godnv Same• t 4 w w S 9044 t Cmnvc0wl OAIOC 1m Old w z •d Llaa SnrvY •6 ev.cn IS RtnMW 5 1.951 ] .d S hnVdWw dar..ae 70. 1.951 A...G.m.0 fvY Rna .ct Wr.em t mn 51.I s 5.141 5 BlM Gmell.am Nd hdu 0 w d.d 4 No MWY T Ot•W No W.d ftOrd 0 AW thYpmryw dWfa mYYlnng Nd w.la 7•m F.dlea 1 N w We $ 11W t I S .n0 L 150.00 f IN z RMg d md.vumn fo nlY.em d nwlOd and t N S00 500 3 ytKa YRN GC. . w.m NO a wNv.nb wln cc. 5 a ...w. wan GC• 0 >.. maemcaan r.le alpc. Nd wdue.e > T.m dM 1.1 a, wtdnNl hdo.L Nd w S FM Kong.Y.IN N wpud.d p NaYIdu0.0 10 WO a.. dllu Nmw. wdW.0 11 T.m OfRG dlwYll b4f blllu NNY tdw 12 T.m M Not wdda.d 13 ]o0 •N dM1:.. N.I wtl1tlY 11 Twn 1wC. Y0i II.tldVMl Nd bxkdw MM a 15 T.m I. manOJv nnW Nd Y•dt'd.d �.W��3 is r.n f.,xA 4•. 1z w. Nd YYluE.a .ra.w..r 17 T.m d.mrAi •amu a mm .Id MW.d 1s o.aYaf.n wne.aY Ym i nN nRc mnad Nd w ww 10 N.N.N lu l.m nYW Nd wdWM z0 T.m h •rrt le YHnv Ron Ntl I+tlud.0 21 T.m h m1.0 mY.YI. b w1Ym MYh trNx Nd Mud.d Cb..W1 1 w WIi 3 pm., aaeeumNN crtreml W W. cl..n-g MNd f 1 GY 5a I F.W Nd WUdW ONWN11-I.ativr T.1.w f am d 1 IIIa IIfIMN 3.OENOLMOR OI.t 15 Sd.<Dn OYldrba t 4 1 1t00.00 S IABO S 1p1C I Ld.e.l+M.rtw d.mdlbn t It wdW.d 7 Own Nr dYn a4r t Y .50.00 S 450 ] R.mau.l..Ewwn•nldh.intlaV. m.I.rW Nat wdWY a.r ONI.am I-S.0 mTefaN C33000 C -V.P nCP9.4 Nd Yldaa.e 1 SYeaeaW Nd lntlue.e I Gm1O.4.W.w.R. Ndwdud.d 3 con wI Ndwtlua.d . CWa Yd Nd Ydud.tl on w C -k plb. C 1 4 S 5300.50 f asap 1 s.t 07I/ 15 B G..da V R.tud.N 1 1. Y1dW.d 1 Rwa Idunalm.n.ap1 Ir Y1..1r w.4w4�w so 11 wim" I Imld IwW W v m.AI./-wk..M ael. n.wfVCW so I wdW.a 3 Cmv IOLIW od. w5 »dm. aalv.41 4wd 1 is wdWae Fwelh. w•ml W. far O MW Oki"1 I. f Im m S 100 5 ma .. I ,low m.4.Yl. hm 1....t4..0r1.. .00 to wdW Y 0 1p wdudH > cma.fi.OeaA.a..dm m 10 w[cWY a C.a 1 10 wtAbY p DabA mNY1I mal mYtab O.Mg Nd wdudw] 10 R 4rt.w laWlL maf..W mvrenN No wWdY 11 W. .mndYlnN .bYOPY OVCY No wduded .�W..ti L'pYb.A.r... 13 p..aadrennmfm ln.d.aea Nd wdue.a 13 Cm .tlYYa4. III . R. PW bl~ I Nd wdudW 14 CY.v.1 Nd YaludY swYAIFGWdnp Ramrc80 m CAyd rw cdaa. ,. xee6 ..maM au t tw Is brnoeW Na Mdww to "-mums NaMWdw 17 v lmn. kN atnl q. 4 bAdMq Web Na Mdww Is tManWp Mdudw ..�.. n Bu. Wpm rw.. Y' 6rra. me. Na hnd�e .r+s 20 v p.m.r.pWOM Wpm qd.. tb m1 ...n.. Wn.dw. Nghd.dw w...r 2t S.aan mnRar. bile., Wm Na Mtlww r+.•r 03200f Cdda.M R.wq[e i Is MWd.d HduNl.nmmm I R.Mbrtti .tW.+nYrnhm.b e.Mvh t b Mtludw .uYr.nmmm z w.ldw.h.+.ed<lw tla..ee w2l.w:.6 Na hMud.d ..„,.. 1. I I Mdww wr...nmmm l t4 rM01 YMII N.IhMYdw ttl.l.wlf-6.aww Tagq ! 0.18 Sm il •IWIXIt1Y 0.22W C.o uwVN. NW Mv0e0 1 shNm.r LM Wfwl d~ Nawd Nd Mdww N n W r SMn. Na 17rludw DM.b1il•S.Nvl Ttlq f .I ! f-I&177ALS OS12W SbumlN blwlF.I, q f 3.600.00 f 3.W0 f 3.W0 W W W N.W F.blulhm 1 q M dw I 1NN numrM tq.t tlgmWiaraq. ct.t]t 2 .. Mudw 2 N.V IIYCWN CIY fANM1 L!Y]YIN 1 1. Ydmmd l N.r MrvdviM.W dgnM .ndp pdb.t?dgen.l.r 1 1. MWdw . n.[.M1m1N W.I hga..lYn 1 1. WO dw b SA+aeY.l..lona N.n RNd.tYM NO hMww OMYm 3•S.NmTaW ! 0.76 M ! NCYON t-cARPENTRT 0610M A. Isn. R C 1 q Md.0.d t 2.140 1 N..r575'LVL.Imq hun 2 w f t60.W L 3w 2 R.TMysu W t N f 2W.W f 20 ] W I.per 32 mM1 3 06.16 f I'm . Sm.e led.b Iurdwre tv MrM e+en W% As f SSO.W S. 110 b R I.rrnl+eMJ.L m.lnW molw..rtt Na Mdudw 6 TWI Wtbn+aq ] mo Wtl1 LCo, 7 FW urmkNm Iq LEEO NW Mdudw e N WMtludel 06ISW Wa Nqt W W to W O8N I mwj Cm.wrdm Na Mdww M 41 to MU IW C.bM b Wo.d alh Nq MOww Mib1t-t.cdarl TabW ! On .1 6 W 1 • TNERh41L t MOLMRE PROTECFMSN W 1113 BLrrimm, Dmnmts, 1 q hMud.d t Val 072113 Fym E.Nd Fgnd66m .m:gmn 1 1. W.0.d t LaM • e.m .ln+amnibn WIt. hYM1 M 160 M f dW f mo 2 tlMlugam..ilHb l.nd .in .d. p..1..TTtk 150 q+ Mdud.d 3 Or.M. bwd N,A M Ad . O.n m.d Itq www ..uaw.w r.mww 0721W Tp. IjmRdIs, Nq Mtludw 07 U 23 nen00.nc Pd M R Nq YMww t MwdMA.mID NghMww 07nm bIM YI.uI N. 6Tr.n Null dw 07 72 33 Rocd.lmFwk. NW Mdudw m M 13 P.nw Na MW 0702W Jd.bbW.0q No Ajw 1 GWhM 6 oMl nN.mf. WIdF d N01. 7 Pwhn.br uul a I NO Mdudw Ol.vl.n 7-l.Fhd. T.uq 6.l2 N ! t4 OMSION • OOORS IMCOWS, ! OIAW 101113 i1.Ew Yl.ly Doa.6 ir..m. N.1 Mdudw 1 R hampllgs HM dgAlh.mn Nq hKluOW WTI W Oea HNd.ar. NM Mdww I R ranmlq.dtlM dOTM1ItOru. N M A t 13 ftn Fnmw E10ran b $IDralmq NW h.dud.d 06W W U Nq MNOw t Rr.n.Hlq.YW .MOvn Nq Mdudw .1Y....p0 Bu6m6F Bu.dM! Rdwtlm Cad iaR CWM. P ][.i[{ C Wb1MN WAA" PAWA y 1 R Pad • •.Ida MatlM OMrvI -feadM Tetre t •} {-FNUNE! OD 221a Nm SaNCAFr Abb1 F� Nd 11tivWd 0{t[17 G SnuT Na MUIPI 1 EIIPH meW Wtlw•e t Nf•T Nor Yldlrf0 2 Y.sb mftY Nud wN tram [ Nue+N Na Mined PIVrN d • m NNT Na Mud•tl M 51 12 �TN C•IF f Ha MrNidetl W 2D IL Tl1 NW MWea M 5513 ReWnl .B.Llvavabf Nat Yldadfd W m 12 ii• Na MUJPI M [122 YnPb Na Mutl.e OS 0t 10 EN Rf Na Muafd hbWM[-featbfl TafW i el I m t0-{VECU m 1024W Vmg. Na llaudM 1 Yefr1P rN Na rdllaM 2 Emv e. ENIOF IflPH Na Ylaku 2 MN .e Nd l�drrrl qy tl -S dW Ta t N i 11- E011PIEN2 Na YOAW M 11•{fcden TeffJf i N i n 1]-NRNIfifNG[ 12 W W S Furar+. Na r dw t FurNNrl•IurrIYM f NNY 6" 1 MI Q W NalnNueW geb{m 12.lYdb•TMr• 1 •1 i N 13. itVECtLL CIJNETI1VCTgN 125000 SWr91r•RroFJ f If 15 30,7WM S XJW [ 00.?w i iiNocelbn d vNr:Yi W iartlr b nW 1ad14e T W 1 N Mueetl Omllew 11-{•aBM TL i N { ][YS{ M-CdNEYNG [YSiEYi taa YNWd ObYb114•EMbn TP r i N 21 •FWE WVRESiON 21 M W [onunm WM Rriu lu FYe lu Na MW0 1 Fla YIP Y�rIRIt•O WWn Na MWtl OlrJan 21-1I•eVM i•{r• t • f N 22-YLBNBVIG 1 !•le dl eNv� NIP 6 Ym I Iea Id INWOM 1 If MuaM •b W .w UM I 2 Nw re1P8 wnf lwNwlW OultlY. Ntl YIWOetl We 2 ONmrmea L rPnavr a fNsm f mrer Hd Muded �10 v dr OIYNIerI II•a.dlo•T•Wa [ N { - N HEATUL VENTtAT10N 6Ali CONOR10NW0 i Nev INh: nlPnf b r•la[•le6 hull Na FUWPI a W Ob41M b • {etL•n Teuw { N t N 28. ELECT111CAL t SIu oN r.minlfrwrat brraF�lNn 1 N NIWdN •rrfrwwtW e�.e..r 2 Nw r•alral lsed la relaaP•01NIdn Nat YItlW0 n1W New Yfifrdr•m & L NO MWd OIAtL dNJP1 ]f •[ectlM Taut f N { • [OYLU I TdWfw "s,N[ NdMWfa CMflln ]Y • iedbn Tauls i N i N ?t • EIECTROHC [IFFY\' l fECunffY Buaarfy BufdkV Rda'. Ceyd Fw CoL s City of Fort Collins lv AdMIMIG NOW SU114 YIrG 231nL 2013: R..6 Muth ZJM W13 O 0609 UrR IFd Ca• Bbtred Rrrp•111 6•Cbe f1lef.tN bON. Mw+gMr• aR.miYL rw•r mil- 1 Fl.Wl Not WWtl 2 Na Waded 3 bsu antra Na lndud•d 1 SunNMp • NaMWd.d OI•I.Mr?t • a.dl.n Tad• 5s1 i NI ON 31-EM1M K 312000 Eanh Mwc I N f 2A0000 S 2.100 t 2A00 312300 E"nm AM I in Ndudld 1 EKay.L lv nw ouldn IauWmn a0 9 bMu 2 8p10 nw 1pn"w 00 v Wudld 3 M abnwhWbW .N6 100 d bdu0•d 1 WN fa•.m.vYLanam No WWtl S T.m WreMY rM'JIM Na WWd a TampanmycRNr map, MR.LIOVI L d.IWypew Na Wud•d T Eo •a 6mn lv.Wsdon ...me NORIWw" rwa v«.a S Cv-aMmA d1opmola• 1wnd NdWWd nu.e a W..d mldb Riv urd+Nae NaYWWW 10 Roct •iJvIbn. eud.d OwU•r d•md.bM1 91ssm Na *d W 11 Na Yidud•d .1nr 12 Era . L • Ia1 Na Wud•d rar.rew+arr.r. 13 wpw aN1 m•terW.. e•d bmE IWnd1RA 1Cd Na Mdu0.d �N41N 312590 Is L SOOM S 500 t AAW t Emlbn m�bvf. m.nl.nN�n•amR.rrl• 1 Is MMud.d 1 W n . donm•nl.d.n, m•ntmand a •rdlori mnird, dumbW 1 Is baud" 3 bt•a a Ca .W. l 1 1 "wdW 1 V•ed• Vockrg pW.2O.W zT I u t 2.903W S 2.900 5 CmvW raMai 1 u i 150.0o S TSO 0 E. GvrVa ermuuDad NaWWd T e.aur m.eadwn Na 1dW 6 S.dmxtl Nm Na llaUdW O1.w3en 31 • s.alen TaW s au O all0 32 • CRERR3R OFROVEhKNT3 RN00 Su & Miwg 21 mN S 1049 f 1.116 f 1.116 I SW. n Wrdim•rtl maa 1 N WW.d 2 SW. wvla Li• brdim mmd m 1 k bdWW 3 E.L~—b lwp,,JdW 1 I. WWd 1 SW1 dJdn fa.d.d.n,Wbn amw• 1 Is bdW.d 5 TaY radon 1 N Nau0sd 0 FvmdWenmum m ran Nabdud d T way L W µWIN N01 Wuded a Mr Na W Wd 9 Aa. w,,y Ne Wud•d 10 T A.Ab mtdtlon•• No Ydud•d 321210 N Na Wu0•d nil 230awn s NabdWW 10 14 53 Tmff. • Na Wud.d 3211430v "P,Wq Na WWed 32 M W UM Nm W Wed OM.Iu ]]•R•ttlrl TatW / 0.03 d I 1114 ss-lRR1fE6 331100 Wwr utuy DYtrDulbn N.W I W.br . N•.n• Ma W Wed 2 Dan•m "WPOV Na Wud•0 33 3000 119UII Na W Wd 1 Ceee•C•Tb 6• s•enme•rb pw1 Nd WWe0 2 . 6' PJC Na W W.d 334100 Mt Ud Na Wu0•d + Cmn.r9enaurvuemr l.wr b.dam odMbad.rsd Ye NdWWd Na W Wed 1] 1a 00 S.mdM1 • Na W WM 1 8u1dY+ toWd114n .Mr dr•b mmW w DMNtm 33.0•cdvt T•tW f •1 f SVRTOTAL f 172 d t ""1 f sulT f tl.mT f TRUE 9r,dny Bu.dr9 nMwov� Csra Fvl Cans Eric Dimmick From: Dave Denney <ddenney@frontrangesteel.com> Sent: Friday, March 20, 2015 3:55 PM To: Eric Dimmick Subject: RE: 150310-ButterflyMove.pdf Blue light special on a Friday afternoon $ 3,800. fab and erect, prime ptd. no tax Includes: 2 channels 2 angles epoxy bolts (grouted cells by others re: note 5/S101) thru bolts Excludes: 1) holes in wood (pre -drilled by others prior to channel install) 2) shoring 3) column demo Have a good weekend Dave Denney PO Box 630 Wellington, CO 80549 970-S68-9002 (x19) 970-420-4355 (cell) ddenneyPfrontraneesteel.com From: Eric Dimmick [mailto:edimmick@a-p.com] Sent: Friday, March 20, 2015 9:45 AM To: Dave Denney Subject: 150310-ButterfiyMove. pdf Dave, I will give you a call to review and discuss this Thanks Eric l_ �" March 14, 2015 1•IMI Eric Dimmick I Senior Preconstruction Manager LEED AP BD+C, ASHE Adoifson & Peterson Construction direct 303.363.7101 i mobile 720.810.9483 edimmick@a-p.com sib, �0111111 r4ft T LM PROPOSAL/AGREEMENT Thank you for the opportunity to provide you with a bid to relocate your structure. After an on -site consultation we have an option available for this relocation process. Project Name and Address: Butterfly Building — 222 La Porte, Ft. Collins, CO Destination Address: This is an on -site move. 1) Provide all necessary materials, labor and equipment to rig and prepare structure listed above for relocation. 2) Demolition of the interior slab. 3) "Frame -In" where the windows are being removed on the building. 4) Relocate structure to the destination provided above. 5) Set structure at new site. 6) Means & Methods for the City. Proposed price: S 45,000.00 for structure relocation. Terms of Payment: 10% of proposed price upon signing this agreement. 40% of proposed price upon commencement. 30% of proposed price when building is lifted. Balance of proposed price upon commencement of structure set. "*Please initial that you understand and agree to the financial terms of this Agreement. Owners Responsibilities: 1) It is the property/structure owners' responsibility to know what is required of them in each municipality and to comply with all the city and county standards/codes required to relocate structures and adhere to these requirements. 2) All building inspections, asbestos reports, asbestos abatements, demolition permits, building site permit, etc. as necessary by local municipalities. 3) *"Secure your building" in order to prevent vandalism or theft, etc. 4) All utility disconnects in and around structure before Mammoth commences on job. 5) Old and new site debris removal. 6) Assist in the coordination and pay for costs of any necessary utility movement during relocation phase. 7) Provide any dirt work at the new site. 8) All debris removal. 9) Remove windows. 10) All access and egress and the costs associated with the movement of your structure. Including but not limited to overhead wire movement, traffic light movement, signs, right of way access, fencing