HomeMy WebLinkAboutCHANGE ORDER - BID - 7579 RIVER RESTORATION AT WOODWARD TECHNOLOGY CENTER LOT 4 (5)City of �„ort Collins Natural Areas Natural Areas 1745 Haft n AM Rued P.O. Box 580 Fort Collins, CO 90522,0580 970A%2816 070416,2211 . fix Change Order Form PROJECT TITLE: River Restoration et Woodward Tec11 10109y Center Lot 4 BID NUMBER: 7579 CONTRACTOR: Walsh Construction Inc CHANGE ORDER NUMBER: 5 n n Dranarmr a.,.,c I. Reason for cha '"" " �F,,,� etn rlumoerea peregraphSZFie o Owing: nge. See Anached Exhibit A dated March 5, 2015 2. Descdption of Contract Change: See Attached Exhb4 A dated March 5, 2015 3. Change in Contract Cost: See Attached _ 4. Change in Contract time: See Attached $ 00 Decrease 0 Increase Decrease ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) LA lf/Z $1,994,383.00 $345.975,06 $0.00 _ 38.620.00 1.94% ®- 19.28% $2,378,978.06 ACCEPTED BY: l� i+� +�T• � -- \ - (welsh nstructio c.) DATE: 3I! �' 15 ...._ APPROVED BY: _ ( ty Of Ft. Collins) DATE: APPROVED BY: (Purchasing Agent over tt Comrades Pluchagnp PR)jM F40 LO(O DATE: Recommended for accepto4 :e WTWC, LLC 3/18/2015 g1y660 -113 City of r' _ �y ^O) l'Y Natural Areas r� (`/>�r'' j [V ` n 1745 14 4%w Milt Rona � P.O. Box 580 Natural Fon CaBns, CO eo522.05eo 370.416.2815 Areas 4 970 416 2211 lax Change Order Form PROJECT TITLE: River Restoration at Woodward Technology Center tot 4 BID NUMBER: 7579 CONTRACTOR: Walsh Construction Inc. / /r CHANGE ORDER NUMBER: 6- inprep ring change orders show In order as separate numDerect paragraphs the lvlowly 1. Reason for change: 2. Description of Contract Change. 3. Change in Contract Cost: $ 26,614.00 ®Deoroase 4. Change in Contract time: 0 Increase Decrease See Attached Exhibit A dated March 5, 2015 ORIGINAL CONTRACT COST $1'994'383'00 TOTAL APPROVED CHANGE ORDERS $394,595.06 TOTAL PENDING CHANGE ORDERS $0"00 28.614.00 TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 1•33% TOTAL C.O. % OF ORIGINAL CONTRACT 20•' ADJUSTED CONTRACT COST $2''S�� (Assuming all change orders approved) +t ACCEPTED BY:�-_ DATE: _� I � &\ \S -- (Walsn Construction. Inc APPROVED BY: ,((n DATE. I J ( rty of FL Collins) APPROVED BY: DATE: --- (Purchasing Agent over $60.000) �s Corro'eaa PwU+ashnp Proled Poe /3 Cit of F"'i i ollin + Natural Areas V �7 \ PO M580 ry Road eav 580 Natural F Fes, Collins, c099sz2 r:se9 Areas 970,416.2616 970 416.2211 . W Change Order Form PROJECT 727LE: River Restoration at oodward Technology Centsr Lot a BID NUMBER: 7579 CONTRACTOR: Walsh Construction Inc. CHANGE ORDER NUMBER: 7 C' (/ tj C� In r w y mange Orders show m or r , separ a num parag 1e a owing t Reason for change: 2. Description of Contract Change: 3. Change in Contract Cost 4Change in Contract $ (30,B20.o0) Increase---J . Gme: 0 Increase Decrease See Attached Exhibit A dated March 5, 2015 ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS $1,994,383.00 TOTAL PENDING CHANGE ORDERS $411,209.06 TOTAL THIS CHANGE ORDER $0 00 TOTAL i, OF THIS CHANGE ORDER (30,820.00) TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST 19.4 7% (Assuming all Change orders approved) `, \ 52,374,772.06 ACCEPTED BY: I u\Qttv,�T , 4V R-� DATE: Z Co Inc.) DATE: -- —.— APPROVED BY: Zv /f (City or Ft. Conins ) APPROVED BY: (Purchasing Agent over $60,000 DATE: « cone Purtlxseg Prow File