Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7675 SOUTH TRANSIT CENTER - BIKE SHELTER ADDITIONPlanning, Development & Transportation `^ City `'y of F6rtCollins Engineering 281 North College Aveue P.OrtCos InCO80522n 0580 .- 970.221.6605 970.221.6378 - fax fcgov. coWengineering CHANGE ORDER FORM PROJECT TITLE: PROJECT NUMBER: MAX BRT Project 400903220.563040.90 CONTRACTOR: Heath Construction (PO#9145871) CHANGE ORDER NUMBER: 1 In preparing change orders show in order as separate numbered paragraphs the following 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached for reason and description of change. 3. The contract cost will increase by $1,835.36. 4. There is no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: SUBMITTED BY: anager) APPROVED (Director ofTnfrastructure Services) APPROVED BY: (Purchasing Agent) cc: City Clerk Contractor Purchasing Project File $224,760.00 $0.00 $0.00 $1,835.36 $226,595.36 DATE: n312-//Z0/5 DATE: .TE: 3 -- Z��� DATE: ,�c�F6rt' of Planning, Development & Transportation Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins, CO 80522.0580 970.221.6605 970.221.6378 - fax tcgov. com/engineenng To: Gerry Paul, Director of Purchasing and Risk Management From: Chad Mapp, Facilities Project Manager Date: 3/20/2015 Re: South Transit Center Pond Repairs The South Transit Center Bike Shelter Addition Construction Documents specify to route conduits for electrical and data along the underside of the roof canopy in an existing chase, down from roof on the south side of the existing column and water bore under the existing concrete drive out the bike shelter location. However, upon investigation the chase was full of existing conduits and would not allow for the additional conduits. Therefore, the project team determined alternative routes for the electrical and data conduits. The alternate path identified does not use the chase on the underside of the roof canopy or the water bore under the existing concrete drive. The route for data will utilize existing vaults and conduits but will require additional linear feet of fiber optic cable. Furthermore, the City requested an upgrade from 6 strand fiber to 12 strand fiber. The route for electrical power will require trenching to a nearby electrical vault on the MAX guide way. A Change Order Request submitted by Heath Construction in the amount of $1,835.36 is in line with the attached ICE completed by the City staff in the amount of $2,100. As such, project staff is requesting a change order in the amount of $1,835.36 and I believe the requested amount is reasonable and I recommend approval. 3/27/2015 View assistance for Search Results System for Award Managemerd SAM.gov will be down for a scheduled maintenance wndow from Friday, 03/27/2015, at 7:00 PM to Saturday, 03/2812015, at 2:00 AM (EDT). Search Results Current Search Terms: HEATH* construction* Notice: This printed document represents only the first page of your SAM search results. More results maybe available. To print your complete search results, you can download the PDF and print it. Vo records found for current search. SAM I System for Award Management 1.0 Note to all Users: This is a Federal Government computer system. Use of this system constitutes consent to monitoring at all times. Glossary Search Results Entity Exclusion Search Filters By Record Status BY Functional Area - Entity Management BY Functional Area - Performance Information IBM v1.P.24.2 1 16-1831 �US'A.govr https:/hwywsam.gov/portal/SAM/?mvigati onalstate=JBPN S_rOOABXdcACJgYXZheC5mYVVN IcySwb3JObGVOYnJpZGdl U N UQVR FX0I EAAAAAQApdm lldzp... 1/1 Heath Construction, LLC CHANGE ORDER REQUEST 141 Racquette Drive No. 00001 P.O. Drawer H Phone: 970-221-4195 Fort Collins, CO 80524 Fax: 970-221-4258 TITLE: CO#O1 -Conduit routing DATE: 01/05/2015 PROJECT: South Transit Center Bike Shelter Ad JOB: 14BO597 TO: Attn: Chad Mapp CONTRACT NO: 1 City of Fort Collins 300 LaPorte Ave Fort Collins, CO 80522 Phone: Fax: RE: To: From: DESCRIPTION OF PROPOSAL Relocate Electrical Feeds and Upgrade Low Voltage Data. Item Description Stock# Quantity Units 00001 Electrical 1.000 00001.1 Boring Credit 1.000 00002 Low Voltage Addition 1.000 00002.1 Low Voltage Credit 1.000 00003 Overhead & Profit -Sub (5%) 1.000 00004 Project Management 0.000 ]its 00005 Field Coordination 5.000 Hrs 00006 Project Coordination 5.000 Hrs 00007 Overhead & Profit - Heath 1.000 (15%) 00008 Insurance (I %) 1.000 APPROVAL: By: Chad Mapp Date: Pnmacera D Number: Unit Price Tax Rate Tax Amount Net Amount $2,150.57 0.00% $0.00 $2,150.57 ($4,136.80) 0.00% $0.00 ($4,136.80) $5,411.21 0.00% $0.00 $5,411.21 ($2,336.00) 0.00% $0.00 ($2,336.00) $54.45 0.00% $0.00 $54.45 $0.00 0.00% $0.00 $0.00 $65.17 0.00% $0.00 $325.85 $44.93 0.00% $0.00 $224.65 $82.58 0.00% $0.00 $82.58 $58.85 0.00% Unit Cost: Unit Tax: Unit Total: $0.00 $58.85 $1,835.36 $0.00 $1,835.36 By: Dan Dirksen Date: Page I or I I,, "i ��rt_ Collins Date of Estimate: 20-Mar-15 Contract Type: Lump Sum Existing Contract or PO (YIN): Y Independent Cost Estimate Description of Goods (A) or Services (B): 8 Alternate route for data vrili utilize existing vaults and conduits but wit require additional linear fact of fiber optic cable. Furthermore, the City requested an upgrade from 6 strand fiber to 12 strand fiber. The route lot electrical power will require trenching to a nearby electrical vault on the MAX guide way. I have obtained the following estimate from; Published Price List I Past Pricing (date) Engineering or Technical Estimate (performed by) Independent Third Party Estimate (performed by) Other (specify) Cost Estimate Details: (Estimate calculated in US Dollars) Coat of Standard Items Product Cost (S/ea) Cost (Sea) Notes/Data Source Delivered No Freight Tolal Cost of Services, Repairs, or Non -Standard Items itemlTesk: Materials or Work Description Other Direct Costs Quantity Unit Unit Price Allocated Overhand SGBA' Profit TOTAL Bonne, excavation, pipe - credit 100 LF 5 40.00 -4,DD0.00 Trenching and electrical wire service 50 LF s 50.00 2.500.00 6ST Low voltage - credit 400 LF s 5,00 -2.000.00 12ST Low voltage - add 700 LF s 8.00 5,6D0.00 0.00 0.00 0.00 UM eta 'eellvg. eenerd and M,Jnetnove &nn.,..s Signature of Preparer