Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7089 WATER WASTEWATER & STORMWATER UTILITIES INFRASTRUCTURE DESIGN & CONSTRUCTION SERVICES CONTRACTORRequisition Form loggq5 Vendor: Connell Resources Today's Date: March 5, 2015 Requisition No.: Fort Collins, CO Ship To: Date Entered: Date Required: ASAP Date Approved: Special instructions: Date Denied: Item k quantity Unit Description Unit Price Total Charge Number 1 1 LS Mountain Ave. Waterline - Design and Cost Estimating Services $30,929.00 $30,929.00 5026415026.521210.3 01 v� _Requested By-� Matt Fater KNGFOR1l5YtvY C N . PROFESSIONAL SERVICE AGREEMENT m d 1 51501 WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Connell Resources, Inc. DATED: February 16, 2010 Work Order Number. Conneil Mountain-1 - 2015 Purchase Order Number: Project Title: Mountain Ave. Waterline Replacement lou) 4561-1il-1 Commencement Date: March 5. 2015 dVvz plf CompletionDate: October 31. 2015 pfi�,� 7/" Maximum Fee: (time and reimbursable direct costs): Not to exceed Thirty Thousand, Nine Hundred Twenty Nine ($30.929) Project Description: Design and estimating services related to Mountain Ave Waterline Replacement Scope of Services: See Attached Scope of Work Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. in the event of a conflict between or ambiguity In the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professio !/ wrlj By: 0e Title: Date: City of Fort Collins Submitted By: Special Proog0s Manager Date: Reviewed By: Owen L. Randall, Chiq Engineer Date: 3Ie;, S Approved By: Jon FFaukaas, Water Engineering and Field Serv1 Orations Manager Date: -: 7 / / Approved By: Kevin Gertig, Utilities Executive Director (over $1,000,000) Approved By: Gerry Paul, Director of Purchasing and Risk Management (over $60,000.00) Date: EXHIBIT B MOUNTAIN AVE WATER - CONNELL RESOURCES, INC. WORK PLAN Labor aP Castncllon S nlcllon M EHhS I CAD TECH Pavvie Crow TASK TOTAL T L kdlAdial I Dan 0. CAM F. I Shawn O 1 John W. Rate /how $87 $84 $107 55e Connof 1225 INVESTIGATION AND DESIGN PHASE SERVICES Task 1 Prellminery Final Design Msetln s 1.1 20 8 $6,146 1.2 Final Datl n MmdrW _30 2 2 2 $556 _ 1.3 Publk Ousasch / Salmdule 4 2 $562 1.4 slbassWtps 10 10 2 $1,924_-- -- alawsbl:46 32 14 0 0 0 To* 1 sublottl: ,188 Task 2 Field Investigation 2.1 UtUfty Locate 2 2 2 $792 2.2 Poaatlnp 0aoach aoro TM Was 5 12 36 1,000 $10,543 2.3 8 2 8 600 $3,264 eaaabl: 1 0 0600 Took2mubMik 14,599 Task 3 Cost Estimates for Attematives 3.1 HDD 8 4 1 $1,139 3.2 PIPE BURST 8 4 1 $1,139 3.3 $0 $0 $0 — — -- — — _ 16 2 0 Ba3 bol:sualom: 2,278 Task 4 Cost Estimating / Contract Negotiation 5.1 Kkkee meM" whh Indapendent Esemalwa -__ 5 2 $603 5.2 Eaenab Pnepsrseon 32 4 4 1 $3,602 $435 5.3 Eeemsb Reemnallllaeon — - 5 _ _... --- -- Subleft 6 4 1 0 0 Task 5 subtom: ,640 Task 5 Administration 8.1 AtrNnatrtlbn 4 _ 1 4 -. - .. _ _ -- -250 $671 8.2 PwwJb(SWYP/C"Wtwdm Dm &Wnp!APEN) 1 4 $553 _ _ 8ublom:5 0 1 8 0 250 Talk a subtotal: $1,224 level of short per lobar category noun : 124 62 21 9 46 262 «Total Manhours total cosh per Mbar categoty, sub-consuK 8 expenses: $ 10,788 S 5,208 S 2 2471 S 486 $ 10,350 $ 1,850 Total Cost&>> $ 30,929 staff-wooks: 3.10 1.55 0.531 0.23 1.15 Total Man-wepicsi 6.55 Pape 1