HomeMy WebLinkAboutCHANGE ORDER - BID - 8014 MAX BRT GATE OPERATION AND TRAIN NOTIFICATIONCHANGE ORDER NO. 01 PROJECT TITLE: MAX BRT - Train and Gate Notification CONTRACTOR: H&H Data Services PROJECT NUMBER: 8014 PURCHASE ORDER NO.: 9147174 DESCRIPTION: Contract reconciliation through 04-07-2015 1. Reason for change: This change order reconciles contract changes on the MAX BRT Train and Gate Notification contract through April 7, 2015. This change order is supported by work change directives describing each change authorized on this contract. Work change directive 1 is hereby incorporated by reference. 2. Description of Change: This change order includes changes to the contract to address access and remote capabilities at all MAX gates by adding equipment and wiring. Gate installation at the South Transit Center (STC) was completed after the NTP was issued for the MAX Train Notification and Gate Operation project. 3. Change in Contract Cost: $6,116.64 4. Change in Contract Time: 1 18 calendar days for substantial completion 18 Icalendar days for final completion TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST ACCEPTED BY: Contractor's Ree REVIEWED BY: Construction Manager APPROVED BY: t✓ City Project Manager APPROVED BY: r�K—City Engineer APPROVED BY: Purchasing Agent over $60,000 a: Owner Engineer Contractor Purchasing Project File $0.00 $ 6,116.64 10.34% 10.34% $� 65 256 79 DATE 3 () { DATE: 4/0 - DATE 3 - I / - S— DATE: 7 1 f / )� DATE: max WORK CHANGE DIRECTIVE TO CONTRACTOR: H&H Data Services WCD NO: 001 PROJECT: Mason Corridor— MAX BRT— Train & Gate Notification PROJECT NO: 8014 OWNER: City of Fort Collins — Engineering Department ENGINEER: City of Fort Collins IT Department/Ditesco The following additions, deletions, or revisions to the Work have been ordered and authorized: Description of Work: (Title of WCD): STC Gate Operation - Wiring Connection This Work Change Directive (WCD) directs the Contractor to price and, if accepted, install the following: Contractor to procure and install 7 conductor shielded 18 gauge wire from STC gate, through Vault 1 at corner of Fossil & Fairway, into Vault 2, east of the STC MDF room, and then terminate at equipment inside the MDF room. Approximate length of wire is 1000ft. 2. Contractor to install Owner provided DIN Rail, MOXA SPL 24-T POE Splitter, and MOXA E1214- T I/O Relay. 3. Contractor to procure and install DC Breaker. 4. Contractor to coordinate startup and testing of this gate with the Engineer. The work shall include supplying equipment, labor, and mateirals to perform the work according to the MAX BRT Gater Operation & Train Notification project specifications and approved submittals. The gate installation at the STC has just been completed. Adding the equipment and wiring to this gate will allow Transfort to have access and remote capabilities at all MAX gates. Attachments (List Supporting Documents): STC conduit routing drawings, STC one line, STC MDF room termination points. It is understood that this Work Change Directive may change the Contract Price and/or Time, and is evidence that the parties expect a Change Order request for approval to subsequently follow this Work Change Directive, Ordered By: Owner Recommended By: ylkwta February 5, 2015 i Construction Manager Date Copy: Owner, Engineer, Field File - SharePoint WCDO01_STC GATE WIRE_DRAFT FOR PRICING PAGE 1 OF 1 Transfort Cabinets NetComm Cabinet Cable Ladder Racks CPI Cabinet Part Number: M1033-742 +a Cehb Manager Mason Comdor ® Components fl Video Sewmy STC Cetae Manager ® r;D==l Number: CPI Cabinet Part II M1034 742 CPI Cabinet Part 1 Number: M103131-7322 Cabk Manager fir..► i.r. rr.r r.i,ei Audio Equipmentle Wrrr ar reWr arlr+r+ar Manegerur Ni==W YYIe a1WYi /iW iitiieihla ® Monitoriver MKVM ManagerxeeaeLCD falirYi WiWeani ii1 WWS WllW Automatic Anrwuncemere Motorola Radio I NetCom Cabinet: (provide specified equipment or equivalent): APC 2200 UPS shall be installed in cabinet to provide battery backup power for the South Transit Center. An ADC fiber patch panel shall provide fiber connectivity for the South Transit Center. Contractor shall provide ADC FL2000 fiber patch panel and LC pigtails. Two power strips shall be mounted on back of cabinet. Transfort Cabinets: (provide specified equipment or equivalent): Cable management: Some on front and some on back Two Power Strips shall be mounted along the back of each side of each cabinet. APC 1500 UPS shall be installed in both Transfort cabinets. All three cabinets shall have two 200 Amp, 110 volt AC quad electrical outlets, each on separate circuits. The adjacent side panels of the Transfort cabinets shall be removed and the -cabinets shall be connected together. othrn The designated radio data cables shall be terminated on a dedicated 24-port Category 6 copper patch panel in the middle cabinet. The designated GPS clock data cables shall be terminated on a 24-port Category 6 copper patch panel located in the middle cabinet. Category 6 network cables for Video Surveillance Cameras shall be terminated on a dedicated 24-port copper patch panel in the NetComm cabinet. A separate enclosed cable management system shall be installed between the NetCom cabinet and the Transfort cabinets. To provide cable management for the structural Category 6 cable coming into the ER/MDF closet, an enclosed cable management system shall be installed to provide a cable route to the copper patch panels located in two of the three cabinets. Cable entry into the top of the cabinet shall be designed to mitigate overhead water damage. O LL ~ZU393 0 0 NZV gZJZ LLVJ, _Out tL i- 0Ix o Li. U V (II�� auaa.�a,yP.asaen aaoartcn PC .Cahinet Laygul. � W o_ IT1.2 Three cabinets shall be installed in the ER/MDF closet. ' 1 — Netcomm cabinet — This cabinet will be physically separated J from the Transfort cabinets. The lock on the door will be keyed differently than the Transfort cabinets 2 - Transfort cabinets —These cabinets will be populated with the Transfort's identified systems. All three cabinets shall have two 20 Amp, 110 volt AC quad electrical N 0 outlets, each on separate circuits. Z Z An electrical ground as defined by building codes shall be provided on W 0 a 6" bar mounted 6" above the finished floor. This grounding bar shall L% g J be connected to building steel (main building ground electrode), a N 0 separate concrete -encased electrode, or a buried ring ground with 00 Z 0 copper wire using a short feed to the actual ground. N J Z_JZ There are two options for the flooring. One option is for the a sealant to 0 J be applied to the concrete floor or a anti -static vinyl compositional the U J will need to be installed. 0 On the north wall, a V A-C plywood board shall be securely mounted M 0 to the wall. The plywood board shall be mounted horizontally and = LL 0 painted white in color. G 0 U. A key fob reader shall be installed on the door leading into the ER/MDF N closet. V Two conduits coming in from the West fiber optic vault shall be 4" in diameter. One conduit coming in from the East fiber optic vault shall be 4" in diameter. All three conduits shall extend a minimum of 2" above the floor space. Two 2" conduits shall be run independently to two separate �uan•unc•w�ea. waterproof junction boxes on the roof of the building in a direct line for ua. use with communication devices mounted on the roof. �< A separate earth ground shall be provided at the roof junction box ^-Jaxim'. point and the conduit shall be grounded separately from the ground in the equipment room. A 1" conduit terminating in a weatherproof Rmn duplex box shall be provided from the roof to the closet electrical w� panel for electrical power. t ET1=3 kL b 1 Pro _. Larger Vauk Verh .r LV wa result wire vauathilTatldrawin4s. $V ..•.... ' nr / Rrn o as Pull wire lmm vault scat of "TC 3rv. autta into MDF mom and t I IIII 1( Ill wxrYl' "�- ' ERIMOF __ F �p Poll TT"easedV.'rutl 2 +wwan eurrra+ STC HySecunly Galo x w i asera s I '-I i 't cr no.usoma �, �r ud or rop�"i�i4r � I •' _ � roves nwc,y t Larger /bYal. r.w•f^-.•v ...- L.�, � � - ,,t o veuR ._... •• t _ ...... .. � mat 4 Pull new 18 gauge wire in ? +'r+TM 4" conduit that runs Case Vault f awast Pedestal —rnaTac gnaw Ch") between Vault 1. at the owe C.. +< •S{; :. comer of'I Fossil 8 Fairway, Ff;y2, 0 and Vault 2, east of STC. �+5+' , . r�'9+r .I t' {) 3-2"wndurta extending from vaub �— Daneestars or the standard vault. North West per a vault ng 1 2 conduit extending tram SY I 2 2' conduits extending Iran vauft located in I.M."Pjrj located at comet of Fairway Lane and Orgdal sign locafmn a vault located I Fossil Blvd' on [be waM side of the building. r �,_. 1 rhharcanduit LV Osucsums of the larger vault-lfibertondo! r]waat coodult -`_ 1 hlxer condub -- CD 4' x SW' a 3' — _ --^t spzra conduit _ -.�- t e Dare conduit 1 ....._....___.—..._„___._.,_,.. .. 'East Vault. Wesr vault:ILxated next to building,,, lantlsra datoi ' the Fat roues exlxnding nht Hain ILncmod next to bulldiny in lantlataped area Iivault _T�-IY-J'•J-M •yam-- _ the Cant vaub algll be exlondatl eat Ups¢o iha cmtduil tlr 4" exMntlurg Irum th,• vault to the tlpsize dnr r.onduit hr 4 extending Prom the vaub to the2 2' cnnJuas nWoldin§ front vaud memhmfthe Ytlen enrvalllonr;e ER/h1Of clmaot.located nn Coleco Avenue. camraptryurrallocatinsthallave hou. CRYADFrki I 1 A .00dwt1 fibarcarrdt Irene IdonNfiad by vendur. id'unndun wlll need lu Iw: etuUUod up MrsWs the IrtsUll 2d' cundurts�.. 1 Sparc condan nuM wall of Lire ER)MOF closet. All 2-4" condurts will need to he stubtwd up bnaNe w... - �- WLL Z Z O ~ZV Z-� z O3 J 20v 00U. N 41Gefema m .YABLTS 8 FIBER. � � o IT1 e4 R d [ 3 G') G) G) 0 S (D Qt is f; 5 'a �3 k 2 8E t E � glq °ii�R bm 3i g $E#E {j Hit E3 fat', 111111 3/17/2015 System for Award Management USER NAME PASSWORD M Forgot Usemame? Forgot Password? H & H Data Services, Inc. Entity Dashboard DUNS: 053181702 CAGE Code: 1WUB2 Status: Active Expiration Date: 01/15/2016 t Entity Overview Purpose of Registration: All Awards t Entity Record Entity Overview t Core Data t Assertions Entity Information r Reps & Certs Name: H & H Data Services, Inc. Business Type: Business or Organization t POCS POC Name: Jim Daniels Registration Status: Active Activation Date: 01/15/2015 t Reports Expiration Date: 01/15/2016 t Service Contract Report t BioPreferred Report r Exclusions Active Exclusions r Inactive Exclusions t Excluded Family Members REIVRICTO SEARCH SAM I system for Award Management 1.0 Note to all Users: This is a Federal Government computer system. Use of this system constitutes consent to monitoring at all times. IBM v1.P.24.20150116-1831 WWW2 Create an Account 1310 Webster Ave Fort Collins, CO, 80524-2756, UNITED STATES GSP. https:lhvww.sam .gov/portal /SAM/7navigati onal state= J BPN S_rOOABXdcACJ gYXZ heC 5mY W N I cy5wb3J obGVOYrUpZ GdI U N U QVR FXOI EAAAAAQApdm I ldzp... 1 /1 FOfrt CoUi115 Dale of Estimate: 9-Mar-15 Contract Type: Train and Gate Notification Hard Bid Existing Contract or PO (Y/N): Y Description of Goods (A) or Services (B): MAX Train Notification and Remote Access to Gates Independent Cost Estimate I have obtained the following estimate from; Online Pacing and Historical Project Cost Data Published Price List / Past Pncing (date) Engineering or Technical Estimate (performed by) Jill Bunell/Jenna Beairsto Independent Third Party Estimate (performed by) Omer (specify) Cost Estimate Details: (Estimate calculated in US Dollars) e r......r cr..n.m a..... Product Unit Price Quantity Unit Contract Item Total 7 Conductor Shileded 18 Gauge Wire $0.67 650 LF MAX BRT $435.50 V GRC Conduit $20.00 25 LF MAX BRT $500.00 1" SCH 40 PVC Pie $0.48 10 LF MAX BRT $4.80 1" UT Flex PCV Seal Tight $1.25 20 LF MAX BRT $25.00 1" SCH 40 PVC 90 $1.16 20 LF MAX BRT $23.20 1" to V FA $0.68 1 EA MAX BRIT $0.68 1" NM L(r Connector $2.34 4 EA MAX BRIT $9.36 2 Pale, 5A, 80 VDC Din Rail Mount $43.711 1 EA I MAX BRIT 543.71 6 Point Panel Mount Terminal Block $10.76 1 EA MAX BRT $10.76 Velcm $44.00 1 EA MAXBRT $44.00 Rmo Tape - Labelin $16.84 1 EA MAXBRT $16.84 Miscellaneous Electrical $200.00 1 LOT MAXBRT $200.00 Labor $4400.00 1 LS MAXBRT $4,400.00 Mark-up 5% $285.69 Sub -Total $5,999.54 Cost of Services, Repairs, or Non -Standard Item Ilem(rask: Markup Total r Signature of Prepares 1f�0'J�'t'(-Cf.E/ $0,00 Cast $5.999,54 281 N College Ave Fort Collins, CO 80524 CHANGE ORDER NO. 1 SUPPORTING DOCUMENTATION Project: MAX BRT — Train and Gate Notification Project No. 8014 Date: March 6, 2015 Description of Change: This change order amends the MAX Train Notification and Gate Operation project scope to include additional procurement and installation of conduit and wire at the STC gate in order for Transfort to have access and remote capabilities at all MAX gates. Change in Contract Value: The contract value is being increased by $6,116.64. Please see attached work change directive as summarized in the table(s) below. Work Change Directives Item Number Description Contract Value WCDO01 Conduit and Wiring for Gate Notification Capabilities $6,116.64 Total Work Change Directives: $6,116.64 Total Contract Change — this change order Total Change Order: $6,116.64 Change in Contract Time: Contract time changes associated with this change order are summarized below. All days shown are calendar days. Contract Time Summary Original Substantial Completion Date: March 13, 2015 Original Final Completion Date: March 20, 2015 Contract Extension CD 001 — Gate Power Connection 18 calendar day(s) Revised Substantial Completion Date CO1 : March 31, 2015 Revised Final Completion Date: April 7, 2015 Page 1 of 1 Change Order 01 MAX BRT — STC Gate 1310 Webster Ave. SEERV SICES Nc DATA & VOICE CABLING • PHONE SYSTE mS PROPOSAL TO: CITY OF FORT COLLINS STREET: PO BOX 580 CITY: FORT COLLINS,CO 80522 CONTACT: KRYSTE KORF PHONE: 222-1633 JOB NAME: MAX BAT TRAIN NOTIFICATION Ft. Collins, Co.80524 Tel: 970-482-6064 Fax: 970-484-3252 PROPOSAL M 1410013-2 (WCD-001) GRC 03/02/15 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT TRAIN NOTIFICATION SYSTEM PER SCOPE DESCRIPTION LISTED BELOW: ANY WORK NOT DESCRIBED IN THE SCOPE BELOW WILL BE CONSIDERED A CHANGE ORDER AND IS NOT INCLUDED IN THE BOTTOM LINE PRICE BELOW. ADDITIOANL WORK WILL NOT BE PERFORMED UNTIL CHANGE ORDER HAS BEEN APPROVED. *WE NEED TO EXTEND OR DEADLINE TO THE END OF THE MONTH 3-31-15 IN LEIU OF WCD-001. PROJECT COORDINATION AND CONDUIT INVESTIGATION: *PROJECT COORDINATION BETWEEN H&H AND DITESCO. *LOCATE ROD AND ROPE CONDUIT ROUTE FOR CABLE TO NEW GATE. SCOPE OF WORK: *INSTALL 18AWG 7CONDUCTOR WIRE FROM MIS CABINET IN TCR TO MASTER GATE CONTROLLER. *INSTALL 3U PLATE WITH DIN RAIL MOUNTED ON IT IN RACK LOCATION PER PRINT. PLATE FURNISHED BY COFC. *INSTALL OWNER PROVIDED EQUIPMENT DINRAIL AND MOXA EQUIPMENT TERMINATE WIRES ON APPROPRIATE EQUIPMENT *INSTALL V PVC PIPE FROM ELECTRICAL HANDHOLE TO COLUMN AND TRANSITION TO 1" GRC TO RACEWAY. *INSTALL 1" GRC FROM RACEWAY INTO BLDG FOLLOWING EXISTING CONDUIT PATHWAY. *THE INSTALLATION OF THE GRC RACEWAY WILL BE PERFORMED BY T'S ELECTRIC. *COORDINATE ALL WORK WITH APPROPRIATE COFC PESONEL. *ALL TESTING WILL BE DONE WITH ALL PARTIES INVOLVED. TESTING AND DOCUMENTATION: *INCLUDES LABELING WITH MACHINE GENERATED WHITE LABELS WITH BLACK LETTERING. *LABELING SCHEME: PER CITY STANDARDS. *INCLUDES TESTING WITH LEVEL III TESTERS. *EXCLUDES (1) ONE PDF COPY OF TEST REPORTS. 'EXCLUDES (1) ONE COPY OF AUTOCAD AS -BUILT ON CD. GENERAL: *H&H TECHNICIANS ARE INDUSTRY AND MANUFACTURER CERTIFIED. *H&H DATA SERVICE'S RCDD AND A PROJECT MANAGER WILL OVERSEE THE INSTALLATION. *INSTALLATION WILL BE PER ANSI/EIA/TIA STANDARDS AND LOCAL CODES AND ORDINANCES. *INSTALLATION OF ALL WORK TO BE COMPLETED DURING STANDARD BUSINESS HOURS. *INCLUDES MANUFACTURER'S WARRANTY ON MATERIALS AND ONE-YEAR WARRANTY ON WORKMANSHIP. *EXCLUDES TAX. *EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT. *EXCLUDES CONDUIT, J- BOXES IN WALLS AND ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS AND THROUGH WALLS. 1310 Webster Ave. DATA `� SERVICESIHC. DATA & VOICE CABLING • PHONE SYSTEMS Ft. Collins, Co.80524 Tel: 970-482-6064 Fax: 970-484-3252 PROPOSAL TO: CITY OF FORT COLLINS STREET: PO BOX 580 CITY: FORT COLLINS,CO 80522 CONTACT: KRYSTE KORF PHONE: 222-1633 JOB NAME: MAX BRT TRAIN NOTIFICATION PROPOSAL #: 1410013-2 (WCD-001) GRC 03/02/15 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT TRAIN NOTIFICATION SYSTEM PER SCOPE DESCRIPTION LISTED BELOW: ANY WORK NOT DESCRIBED IN THE SCOPE BELOW WILL BE CONSIDERED A CHANGE ORDER AND IS NOT INCLUDED IN THE BOTTOM LINE PRICE BELOW. ADDITIOANL WORK WILL NOT BE PERFORMED UNTIL CHANGE ORDER HAS BEEN APPROVED. CITY UN MFG PART # DESCRIPTION EXTENSION 1 LOT N/A N/A PROJECT COORDINATION BETWEEN H&H AND DITESCO $0.00 1 LOT N/A N/A LOCATE ROD AND ROPE CONDUIT ROUTE FOR CABLE TO NEW GATE $0.00 650 FT CALVERT WIRE 018 0070 OFS VNTC 600V 7 CONDUCTOR SHIELDED 18 GAUGE WIRE $433.33 1 LOT N/A N/A 1" GRC CONDUIT RACEWAY $640,00 1 LOT N/A N/A LABOR TO INSTALL GRC RACEWAY $0.00 1 LOT N/A N/A MISC CONSUMABLES $200.00 1 EA ALTECH #2E5UM 2 POLE, 5A, 80VDC DIN RAIL MOUNT $43.71 1 EA GE INDUSTRIAL CR151 B6 6 POINT PANEL MOUNT TERMINAL BLOCK $10.76 1 EA VELCRO 189645 VELCRO $44,00 1 EA RINO-TAPE 18443 LABELING $16.84 0 EA $0.00 MATERIAL $1,388.64 Proposal Accepted By: Date: LABOR $4.728.00 TAX (0%) $0.00 Printed Name: H&H Data Contract policies. Proposal number shall be on all Job related documents, including emails. Purchase Orders must be received prior to material purchase and scheduling of project. 50% of materials will be Invoiced upon contract signing. Work Releases for service work must be received prior to scheduling. All service work requests require signature approval prior to scheduling. Note: Proposals are valid for 30 days. Payment Terms: NET30 There will be a 5% finance charge if payment is not received within NET 30 Freight Terms: PPD/CHARGE TOTAL $6,116.64 4�19 9e R a$$ P€ zRli RE gF YL -�R � 34 9= a v=i� g Cjp¢ "lpiq pI", $3 log R : ggi7o' I � RC ASS jep ill w! I lilt€'g 'a€ 7 M€I Pa, £§ 99 154g Jim all a ilk - €p SOUTH TRANSIT CENTER IV spaea 'I( CITY OF FORT COLLINS - TRANSFORT;�? FORT COLLINS, COLORADO 9;�Ie b ; OGVUO-103 `SNI11001MO:J j� 1NO:JSNV'H1- SNI11001MO:J :10 A113 N31N3311SN"1 H1f10S o - b L g �ia � pis c a _ r Opt Fb all E9�3 TliE 1 .21 E. �I x =gyp = EtOUR IN �- oo ® o o 4� l� C �1 �V Transfort Cabinets NetComm Cabinet Cable Ladder CPI Cabinet Part Number: M1033-742 Lamo Mannpar Meson CArndl� components Vgeo Sectary - STC Cate Manager i A' .y c w7 DUlal Sigivgta III` n i CPI Cabinet Part Number: M 1034-742 i c.ble Ma�aneI®. -. .-n 1 ...moot LCD Monitor Keylonaro Mouse KVM - CnDle Manager F. Automatic Announcement CIF i�� Motorola Radio CPI Cabinet Part .I Number: M103131-7322 - CV M' LdDI M nap � ' r® WrW e� iYr+. $self for VG204 - NetCom Cabinet: (provide specified equipment or equivalent): APC 2200 UPS shall be installed in cabinet to provide battery backup power for the South Transit Center. An ADC fiber patch panel shall provide fiber connectivity for the South Transit Center. Contractor shall provide ADC FL2000 fiber patch panel and LC pigtails. Two power strips shall be mounted on back of cabinet. Transfort Cabinets: (provide specified equipment or equivalent): Cable management: Some on front and some on back Two Power Strips shall be mounted along the back of each side of each cabinet. APC 1500 UPS shall be installed in both Transfort cabinets. All three cabinets shall have two 20 Amp, 110 volt AC quad electrical outlets, each on separate circuits. 44 The adjacent side panels of the Transfort cabinets shall be removed and the cabinets shall be connected together. Ix WO H LL U) Wfl W 0 yZV ZJZ �VJ HBO V tL ~ O 0 O LL V The designated radio data cables shall be terminated on a dedicated 24-port Category 6 copper patch panel in the middle cabinet. The designated GPS ( �) clock data cables shall be terminated on a 24-port Category 6 copper patch �I panel located in the middle cabinet. Category 6 network cables for Video Surveillance Cameras shall be terminated on a dedicated 24-port copper ALLEI-LINOX' � patch panel in the NetComm cabinet. " c A separate enclosed cable management system shall be installed between --1 the NetCom cabinet and the Transfort cabinets. To provide cable management for the structural Category 6 cable coming into the ER/MDF closet, an enclosed cable management system shall be , installed to provide a cable route to the copper patch panels located in two of the three cabinets. Cable entry into the top of the cabinet shall be o: W'� designed to mitigate overhead water damage. I .� cYMO SYHem MenapemeH'.. ` o awest 4" Contl (Under Slab) Cable Ir Menegamenl SYHem:-.: Tritntl caMnet Two 4" Contluit extending Gem me West vault One 4" Contluit extending from the East vauB. (Under Slab) Tie In new STC Gate wimp through east vault Tren Ifort GbInet Netcomm CebinH Three cabinets shall be installed in the ER/MDF closet. 1 —Netcomm cabinet —This cabinet will be physically separated from the Transfort cabinets. The lock on the door will be keyed differently than the Transfort cabinets 2 -Transfort cabinets —These cabinets will be populated with the Transfort's identified systems. All three cabinets shall have two 20 Amp, 110 volt AC quad electrical outlets, each on separate circuits. An electrical ground as defined by building codes shall be provided on a 6" bar mounted 6" above the finished floor. This grounding bar shall be connected to building steel (main building ground electrode), a separate concrete -encased electrode, or a buried ring ground with 00 copper wire using a short feed to the actual ground. There are two options for the flooring. One option is for the a sealant to be applied to the concrete floor or aanti-static vinyl compositional file will need to be installed. On the north wall, a'/:' A-C plywood board shall be securely mounted to the wall. The plywood board shall be mounted horizontally and painted white in color. A key fob reader shall be installed on the door leading into the ER/MDF closet. Two conduits coming in from the West fiber optic vault shall be 4" in diameter. One conduit coming in from the East fiber optic vault shall be 4" in diameter. All three conduits shall extend a minimum of 2" above the floor space. Two 2" conduits shall be run independently to two separate waterproof junction boxes on the roof of the building in a direct line for use with communication devices mounted on the roof. A separate earth ground shall be provided at the roof junction box point and the conduit shall be grounded separately from the ground in the equipment room. A 1" conduit terminating in a weatherproof duplex box shall be provided from the roof to the closet electrical panel for electrical power. .LLILP •4NalL•MMBLV urcxuacra M .ER/MDF Room hryout. Pyn ®8 M, 0.VA/'ffi 6� [p ■ \) & # ®!§ )/ ,§ @ S S S @ G • . . > | , ! |