HomeMy WebLinkAboutCHANGE ORDER - BID - 8014 MAX BRT GATE OPERATION AND TRAIN NOTIFICATIONCHANGE ORDER NO. 01
PROJECT TITLE: MAX BRT - Train and Gate Notification
CONTRACTOR: H&H Data Services
PROJECT NUMBER: 8014
PURCHASE ORDER NO.: 9147174
DESCRIPTION: Contract reconciliation through 04-07-2015
1. Reason for change:
This change order reconciles contract changes on the MAX BRT Train and Gate Notification contract through
April 7, 2015. This change order is supported by work change directives describing each change authorized
on this contract. Work change directive 1 is hereby incorporated by reference.
2. Description of Change:
This change order includes changes to the contract to address access and remote capabilities at all MAX
gates by adding equipment and wiring. Gate installation at the South Transit Center (STC) was completed
after the NTP was issued for the MAX Train Notification and Gate Operation project.
3. Change in Contract Cost: $6,116.64
4. Change in Contract Time: 1 18 calendar days for substantial completion
18 Icalendar days for final completion
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
ADJUSTED CONTRACT COST
ACCEPTED BY:
Contractor's Ree
REVIEWED BY:
Construction Manager
APPROVED BY: t✓
City Project Manager
APPROVED BY:
r�K—City Engineer
APPROVED BY:
Purchasing Agent over $60,000
a: Owner Engineer
Contractor Purchasing
Project File
$0.00
$ 6,116.64
10.34%
10.34%
$� 65 256 79
DATE 3 () {
DATE: 4/0
-
DATE 3 - I / - S—
DATE: 7 1 f / )�
DATE:
max
WORK CHANGE DIRECTIVE
TO CONTRACTOR: H&H Data Services
WCD NO: 001
PROJECT: Mason Corridor— MAX BRT— Train & Gate Notification PROJECT NO: 8014
OWNER: City of Fort Collins — Engineering Department
ENGINEER: City of Fort Collins IT Department/Ditesco
The following additions, deletions, or revisions to the Work have been ordered and authorized:
Description of Work:
(Title of WCD): STC Gate Operation - Wiring Connection
This Work Change Directive (WCD) directs the Contractor to price and, if accepted, install the following:
Contractor to procure and install 7 conductor shielded 18 gauge wire from STC gate, through Vault
1 at corner of Fossil & Fairway, into Vault 2, east of the STC MDF room, and then terminate at
equipment inside the MDF room. Approximate length of wire is 1000ft.
2. Contractor to install Owner provided DIN Rail, MOXA SPL 24-T POE Splitter, and MOXA E1214-
T I/O Relay.
3. Contractor to procure and install DC Breaker.
4. Contractor to coordinate startup and testing of this gate with the Engineer.
The work shall include supplying equipment, labor, and mateirals to perform the work according to the MAX
BRT Gater Operation & Train Notification project specifications and approved submittals.
The gate installation at the STC has just been completed. Adding the equipment and wiring to this gate will
allow Transfort to have access and remote capabilities at all MAX gates.
Attachments (List Supporting Documents):
STC conduit routing drawings, STC one line, STC MDF room termination points.
It is understood that this Work Change Directive may change the Contract Price and/or Time, and is evidence that the parties
expect a Change Order request for approval to subsequently follow this Work Change Directive,
Ordered By:
Owner
Recommended By: ylkwta February 5, 2015
i Construction Manager Date
Copy: Owner, Engineer, Field File - SharePoint
WCDO01_STC GATE WIRE_DRAFT FOR PRICING PAGE 1 OF 1
Transfort Cabinets NetComm Cabinet
Cable Ladder Racks
CPI Cabinet Part
Number:
M1033-742
+a
Cehb Manager
Mason Comdor
® Components
fl
Video Sewmy
STC
Cetae Manager
® r;D==l
Number:
CPI Cabinet Part II
M1034 742
CPI Cabinet Part 1
Number:
M103131-7322
Cabk Manager
fir..► i.r. rr.r r.i,ei
Audio Equipmentle
Wrrr ar reWr arlr+r+ar
Manegerur
Ni==W
YYIe a1WYi /iW iitiieihla
®
Monitoriver
MKVM
ManagerxeeaeLCD
falirYi WiWeani ii1 WWS WllW
Automatic
Anrwuncemere
Motorola Radio
I
NetCom Cabinet: (provide specified equipment or equivalent):
APC 2200 UPS shall be installed in cabinet to provide battery backup power
for the South Transit Center.
An ADC fiber patch panel shall provide fiber connectivity for the South
Transit Center.
Contractor shall provide ADC FL2000 fiber patch panel and LC pigtails.
Two power strips shall be mounted on back of cabinet.
Transfort Cabinets: (provide specified equipment or equivalent):
Cable management: Some on front and some on back
Two Power Strips shall be mounted along the back of each side of each
cabinet.
APC 1500 UPS shall be installed in both Transfort cabinets.
All three cabinets shall have two 200 Amp, 110 volt AC quad electrical outlets,
each on separate circuits.
The adjacent side panels of the Transfort cabinets shall be removed and the
-cabinets shall be connected together.
othrn
The designated radio data cables shall be terminated on a dedicated 24-port
Category 6 copper patch panel in the middle cabinet. The designated GPS
clock data cables shall be terminated on a 24-port Category 6 copper patch
panel located in the middle cabinet. Category 6 network cables for Video
Surveillance Cameras shall be terminated on a dedicated 24-port copper
patch panel in the NetComm cabinet.
A separate enclosed cable management system shall be installed between
the NetCom cabinet and the Transfort cabinets.
To provide cable management for the structural Category 6 cable coming
into the ER/MDF closet, an enclosed cable management system shall be
installed to provide a cable route to the copper patch panels located in two
of the three cabinets. Cable entry into the top of the cabinet shall be
designed to mitigate overhead water damage.
O
LL
~ZU393
0 0
NZV
gZJZ
LLVJ,
_Out
tL i-
0Ix
o Li.
U V
(II��
auaa.�a,yP.asaen
aaoartcn
PC
.Cahinet
Laygul.
� W
o_ IT1.2
Three cabinets shall be installed in the ER/MDF closet. '
1 — Netcomm cabinet — This cabinet will be physically separated J
from the Transfort cabinets. The lock on the door will be keyed
differently than the Transfort cabinets
2 - Transfort cabinets —These cabinets will be populated with the
Transfort's identified systems.
All three cabinets shall have two 20 Amp, 110 volt AC quad electrical N 0
outlets, each on separate circuits. Z Z
An electrical ground as defined by building codes shall be provided on W 0
a 6" bar mounted 6" above the finished floor. This grounding bar shall L% g J
be connected to building steel (main building ground electrode), a N 0
separate concrete -encased electrode, or a buried ring ground with 00 Z 0
copper wire using a short feed to the actual ground. N J
Z_JZ
There are two options for the flooring. One option is for the a sealant to 0 J
be applied to the concrete floor or a anti -static vinyl compositional the U J
will need to be installed. 0
On the north wall, a V A-C plywood board shall be securely mounted M 0
to the wall. The plywood board shall be mounted horizontally and = LL 0
painted white in color. G 0 U.
A key fob reader shall be installed on the door leading into the ER/MDF N
closet. V
Two conduits coming in from the West fiber optic vault shall be 4" in
diameter. One conduit coming in from the East fiber optic vault shall
be 4" in diameter. All three conduits shall extend a minimum of 2"
above the floor space.
Two 2" conduits shall be run independently to two separate
�uan•unc•w�ea.
waterproof junction boxes on the roof of the building in a direct line for ua.
use with communication devices mounted on the roof. �<
A separate earth ground shall be provided at the roof junction box ^-Jaxim'.
point and the conduit shall be grounded separately from the ground in
the equipment room. A 1" conduit terminating in a weatherproof Rmn
duplex box shall be provided from the roof to the closet electrical w�
panel for electrical power.
t
ET1=3
kL
b 1
Pro
_. Larger Vauk
Verh .r LV wa result
wire
vauathilTatldrawin4s. $V ..•....
' nr
/ Rrn o as Pull wire lmm vault scat of "TC 3rv.
autta into MDF mom and t
I IIII 1(
Ill wxrYl' "�- ' ERIMOF __
F �p Poll
TT"easedV.'rutl 2 +wwan eurrra+
STC HySecunly Galo
x w i asera s I '-I i 't
cr
no.usoma
�, �r ud or rop�"i�i4r � I •' _ � roves nwc,y
t
Larger /bYal. r.w•f^-.•v ...- L.�, � � - ,,t o
veuR ._... •• t _ ...... .. � mat 4
Pull new 18 gauge wire in
? +'r+TM 4" conduit that runs Case
Vault f awast
Pedestal —rnaTac gnaw Ch") between Vault 1. at the owe C..
+< •S{; :.
comer of'I Fossil 8 Fairway, Ff;y2, 0
and Vault 2, east of STC. �+5+' , . r�'9+r
.I t'
{) 3-2"wndurta extending from vaub �— Daneestars or the standard vault. North West per a vault
ng 1 2 conduit extending tram SY I 2 2' conduits extending Iran vauft located in I.M."Pjrj
located at comet of Fairway Lane and Orgdal sign locafmn a vault located I
Fossil Blvd' on [be waM side of the building. r �,_.
1 rhharcanduit LV Osucsums of the larger vault-lfibertondo!
r]waat coodult -`_ 1 hlxer condub -- CD 4' x SW' a 3' — _ --^t spzra conduit _
-.�- t e Dare conduit 1 ....._....___.—..._„___._.,_,.. .. 'East Vault. Wesr vault:ILxated next to building,,, lantlsra datoi
' the Fat roues exlxnding nht Hain ILncmod next to bulldiny in lantlataped area Iivault
_T�-IY-J'•J-M •yam-- _ the Cant vaub algll be exlondatl eat Ups¢o iha cmtduil tlr 4" exMntlurg Irum th,• vault to the tlpsize dnr r.onduit hr 4 extending Prom the vaub to the2 2' cnnJuas nWoldin§ front vaud memhmfthe Ytlen enrvalllonr;e ER/h1Of clmaot.located nn Coleco Avenue. camraptryurrallocatinsthallave hou. CRYADFrki
I 1 A .00dwt1 fibarcarrdt Irene IdonNfiad by vendur. id'unndun wlll need lu Iw: etuUUod up MrsWs the IrtsUll 2d' cundurts�.. 1 Sparc condan nuM wall of Lire ER)MOF closet. All 2-4" condurts will need to he stubtwd up bnaNe
w... - �-
WLL
Z Z
O
~ZV
Z-�
z O3
J
20v
00U.
N
41Gefema
m
.YABLTS
8 FIBER.
� � o
IT1 e4
R
d [ 3
G') G) G) 0 S (D
Qt
is
f;
5
'a
�3
k 2 8E
t
E �
glq
°ii�R
bm
3i
g $E#E {j
Hit E3
fat',
111111
3/17/2015 System for Award Management
USER NAME PASSWORD
M
Forgot Usemame? Forgot Password?
H & H Data Services, Inc.
Entity Dashboard DUNS: 053181702 CAGE Code: 1WUB2
Status: Active
Expiration Date: 01/15/2016
t Entity Overview Purpose of Registration: All Awards
t Entity Record Entity Overview
t Core Data
t Assertions
Entity Information
r Reps & Certs
Name: H & H Data Services, Inc.
Business Type: Business or Organization
t POCS
POC Name: Jim Daniels
Registration Status: Active
Activation Date: 01/15/2015
t Reports
Expiration Date: 01/15/2016
t Service Contract Report
t BioPreferred Report
r Exclusions
Active Exclusions
r Inactive Exclusions
t Excluded Family Members
REIVRICTO SEARCH
SAM I system for Award Management 1.0
Note to all Users: This is a Federal Government computer system. Use of this
system constitutes consent to monitoring at all times.
IBM v1.P.24.20150116-1831
WWW2
Create an Account
1310 Webster Ave
Fort Collins, CO, 80524-2756,
UNITED STATES
GSP.
https:lhvww.sam .gov/portal /SAM/7navigati onal state= J BPN S_rOOABXdcACJ gYXZ heC 5mY W N I cy5wb3J obGVOYrUpZ GdI U N U QVR FXOI EAAAAAQApdm I ldzp... 1 /1
FOfrt CoUi115
Dale of Estimate: 9-Mar-15
Contract Type: Train and Gate Notification Hard Bid
Existing Contract or PO (Y/N): Y
Description of Goods (A) or Services (B):
MAX Train Notification and Remote Access to Gates
Independent Cost Estimate
I have obtained the following estimate from; Online Pacing and Historical Project Cost Data
Published Price List / Past Pncing (date)
Engineering or Technical Estimate (performed by) Jill Bunell/Jenna Beairsto
Independent Third Party Estimate (performed by)
Omer (specify)
Cost Estimate Details:
(Estimate calculated in US Dollars)
e r......r cr..n.m a.....
Product
Unit Price
Quantity
Unit
Contract Item
Total
7 Conductor Shileded 18 Gauge Wire
$0.67
650
LF
MAX BRT
$435.50
V GRC Conduit
$20.00
25
LF
MAX BRT
$500.00
1" SCH 40 PVC Pie
$0.48
10
LF
MAX BRT
$4.80
1" UT Flex PCV Seal Tight
$1.25
20
LF
MAX BRT
$25.00
1" SCH 40 PVC 90
$1.16
20
LF
MAX BRT
$23.20
1" to V FA
$0.68
1
EA
MAX BRIT
$0.68
1" NM L(r Connector
$2.34
4
EA
MAX BRIT
$9.36
2 Pale, 5A, 80 VDC Din Rail Mount
$43.711
1
EA
I MAX BRIT
543.71
6 Point Panel Mount Terminal Block
$10.76
1
EA
MAX BRT
$10.76
Velcm
$44.00
1
EA
MAXBRT
$44.00
Rmo Tape - Labelin
$16.84
1
EA
MAXBRT
$16.84
Miscellaneous Electrical
$200.00
1
LOT
MAXBRT
$200.00
Labor
$4400.00
1
LS
MAXBRT
$4,400.00
Mark-up 5%
$285.69
Sub -Total
$5,999.54
Cost of Services, Repairs, or Non -Standard Item
Ilem(rask:
Markup
Total
r
Signature of Prepares 1f�0'J�'t'(-Cf.E/
$0,00
Cast $5.999,54
281 N College Ave
Fort Collins, CO 80524
CHANGE ORDER NO. 1
SUPPORTING DOCUMENTATION
Project: MAX BRT — Train and Gate Notification
Project No. 8014
Date: March 6, 2015
Description of Change:
This change order amends the MAX Train Notification and Gate Operation project scope to include additional
procurement and installation of conduit and wire at the STC gate in order for Transfort to have access and remote
capabilities at all MAX gates.
Change in Contract Value:
The contract value is being increased by $6,116.64. Please see attached work change directive as summarized in
the table(s) below.
Work Change Directives
Item Number
Description
Contract Value
WCDO01
Conduit and Wiring for Gate Notification Capabilities
$6,116.64
Total Work Change Directives:
$6,116.64
Total Contract Change — this change order
Total Change Order: $6,116.64
Change in Contract Time:
Contract time changes associated with this change order are summarized below. All days shown are calendar
days.
Contract Time Summary
Original Substantial Completion Date:
March 13, 2015
Original Final Completion Date:
March 20, 2015
Contract Extension CD 001 — Gate Power Connection
18 calendar day(s)
Revised Substantial Completion Date CO1 :
March 31, 2015
Revised Final Completion Date:
April 7, 2015
Page 1 of 1
Change Order 01
MAX BRT — STC Gate
1310 Webster Ave.
SEERV SICES Nc
DATA & VOICE CABLING • PHONE SYSTE mS
PROPOSAL TO: CITY OF FORT COLLINS
STREET: PO BOX 580
CITY:
FORT COLLINS,CO 80522
CONTACT:
KRYSTE KORF
PHONE:
222-1633
JOB NAME:
MAX BAT TRAIN NOTIFICATION
Ft. Collins, Co.80524
Tel: 970-482-6064
Fax: 970-484-3252
PROPOSAL M 1410013-2 (WCD-001) GRC 03/02/15
PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT TRAIN NOTIFICATION
SYSTEM PER SCOPE DESCRIPTION LISTED BELOW:
ANY WORK NOT DESCRIBED IN THE SCOPE BELOW WILL BE CONSIDERED A CHANGE ORDER AND IS NOT INCLUDED
IN THE BOTTOM LINE PRICE BELOW. ADDITIOANL WORK WILL NOT BE PERFORMED UNTIL CHANGE ORDER HAS BEEN
APPROVED.
*WE NEED TO EXTEND OR DEADLINE TO THE END OF THE MONTH 3-31-15 IN LEIU OF WCD-001.
PROJECT COORDINATION AND CONDUIT INVESTIGATION:
*PROJECT COORDINATION BETWEEN H&H AND DITESCO.
*LOCATE ROD AND ROPE CONDUIT ROUTE FOR CABLE TO NEW GATE.
SCOPE OF WORK:
*INSTALL 18AWG 7CONDUCTOR WIRE FROM MIS CABINET IN TCR TO MASTER GATE CONTROLLER.
*INSTALL 3U PLATE WITH DIN RAIL MOUNTED ON IT IN RACK LOCATION PER PRINT.
PLATE FURNISHED BY COFC.
*INSTALL OWNER PROVIDED EQUIPMENT DINRAIL AND MOXA EQUIPMENT TERMINATE
WIRES ON APPROPRIATE EQUIPMENT
*INSTALL V PVC PIPE FROM ELECTRICAL HANDHOLE TO COLUMN AND TRANSITION TO 1" GRC TO RACEWAY.
*INSTALL 1" GRC FROM RACEWAY INTO BLDG FOLLOWING EXISTING CONDUIT PATHWAY.
*THE INSTALLATION OF THE GRC RACEWAY WILL BE PERFORMED BY T'S ELECTRIC.
*COORDINATE ALL WORK WITH APPROPRIATE COFC PESONEL.
*ALL TESTING WILL BE DONE WITH ALL PARTIES INVOLVED.
TESTING AND DOCUMENTATION:
*INCLUDES LABELING WITH MACHINE GENERATED WHITE LABELS WITH BLACK LETTERING.
*LABELING SCHEME: PER CITY STANDARDS.
*INCLUDES TESTING WITH LEVEL III TESTERS.
*EXCLUDES (1) ONE PDF COPY OF TEST REPORTS.
'EXCLUDES (1) ONE COPY OF AUTOCAD AS -BUILT ON CD.
GENERAL:
*H&H TECHNICIANS ARE INDUSTRY AND MANUFACTURER CERTIFIED.
*H&H DATA SERVICE'S RCDD AND A PROJECT MANAGER WILL OVERSEE THE INSTALLATION.
*INSTALLATION WILL BE PER ANSI/EIA/TIA STANDARDS AND LOCAL CODES AND ORDINANCES.
*INSTALLATION OF ALL WORK TO BE COMPLETED DURING STANDARD BUSINESS HOURS.
*INCLUDES MANUFACTURER'S WARRANTY ON MATERIALS AND ONE-YEAR WARRANTY ON WORKMANSHIP.
*EXCLUDES TAX.
*EXCLUDES CROSS -CONNECTS TO SERVICES AND CUSTOMER EQUIPMENT.
*EXCLUDES CONDUIT, J- BOXES IN WALLS AND ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS AND THROUGH WALLS.
1310 Webster Ave.
DATA
`� SERVICESIHC.
DATA & VOICE CABLING • PHONE SYSTEMS
Ft. Collins, Co.80524
Tel: 970-482-6064
Fax: 970-484-3252
PROPOSAL TO: CITY OF FORT COLLINS
STREET: PO BOX 580
CITY: FORT COLLINS,CO 80522
CONTACT: KRYSTE KORF
PHONE: 222-1633
JOB NAME: MAX BRT TRAIN NOTIFICATION
PROPOSAL #: 1410013-2 (WCD-001) GRC 03/02/15
PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT TRAIN NOTIFICATION
SYSTEM PER SCOPE DESCRIPTION LISTED BELOW:
ANY WORK NOT DESCRIBED IN THE SCOPE BELOW WILL BE CONSIDERED A CHANGE ORDER AND IS NOT INCLUDED
IN THE BOTTOM LINE PRICE BELOW. ADDITIOANL WORK WILL NOT BE PERFORMED UNTIL CHANGE ORDER HAS BEEN
APPROVED.
CITY UN MFG
PART #
DESCRIPTION
EXTENSION
1 LOT N/A
N/A
PROJECT COORDINATION BETWEEN H&H AND DITESCO
$0.00
1 LOT N/A
N/A
LOCATE ROD AND ROPE CONDUIT ROUTE FOR CABLE TO NEW GATE
$0.00
650 FT CALVERT WIRE
018 0070 OFS VNTC 600V
7 CONDUCTOR SHIELDED 18 GAUGE WIRE
$433.33
1 LOT N/A
N/A
1" GRC CONDUIT RACEWAY
$640,00
1 LOT N/A
N/A
LABOR TO INSTALL GRC RACEWAY
$0.00
1 LOT N/A
N/A
MISC CONSUMABLES
$200.00
1 EA ALTECH
#2E5UM
2 POLE, 5A, 80VDC DIN RAIL MOUNT
$43.71
1 EA GE INDUSTRIAL
CR151 B6
6 POINT PANEL MOUNT TERMINAL BLOCK
$10.76
1 EA VELCRO
189645
VELCRO
$44,00
1 EA RINO-TAPE
18443
LABELING
$16.84
0 EA
$0.00
MATERIAL $1,388.64
Proposal Accepted By: Date: LABOR $4.728.00
TAX (0%) $0.00
Printed Name:
H&H Data Contract policies.
Proposal number shall be on all Job related documents, including emails.
Purchase Orders must be received prior to material purchase and scheduling of project.
50% of materials will be Invoiced upon contract signing.
Work Releases for service work must be received prior to scheduling.
All service work requests require signature approval prior to scheduling.
Note: Proposals are valid for 30 days.
Payment Terms: NET30
There will be a 5% finance charge if payment is not received within NET 30
Freight Terms: PPD/CHARGE
TOTAL $6,116.64
4�19
9e R a$$ P€ zRli
RE
gF
YL -�R � 34
9= a v=i�
g Cjp¢ "lpiq pI", $3 log
R : ggi7o' I � RC ASS
jep ill w! I lilt€'g 'a€ 7 M€I Pa, £§ 99 154g
Jim
all a ilk - €p
SOUTH TRANSIT CENTER
IV spaea 'I( CITY OF FORT COLLINS - TRANSFORT;�?
FORT COLLINS, COLORADO 9;�Ie
b ; OGVUO-103 `SNI11001MO:J
j� 1NO:JSNV'H1- SNI11001MO:J :10 A113
N31N3311SN"1 H1f10S
o
-
b
L
g
�ia
�
pis
c
a _ r
Opt
Fb all
E9�3 TliE 1 .21
E.
�I x =gyp = EtOUR IN
�- oo ® o o
4�
l�
C
�1
�V
Transfort Cabinets NetComm Cabinet
Cable Ladder
CPI Cabinet Part
Number:
M1033-742
Lamo Mannpar
Meson CArndl�
components
Vgeo Sectary -
STC
Cate Manager
i A'
.y c w7
DUlal Sigivgta
III` n i
CPI Cabinet Part
Number:
M 1034-742
i c.ble Ma�aneI®. -.
.-n 1 ...moot
LCD Monitor
Keylonaro
Mouse
KVM
- CnDle Manager
F.
Automatic
Announcement
CIF i��
Motorola Radio
CPI Cabinet Part .I
Number:
M103131-7322
- CV M'
LdDI M nap � '
r® WrW e� iYr+.
$self for VG204 -
NetCom Cabinet: (provide specified equipment or equivalent):
APC 2200 UPS shall be installed in cabinet to provide battery backup power
for the South Transit Center.
An ADC fiber patch panel shall provide fiber connectivity for the South
Transit Center.
Contractor shall provide ADC FL2000 fiber patch panel and LC pigtails.
Two power strips shall be mounted on back of cabinet.
Transfort Cabinets: (provide specified equipment or equivalent):
Cable management: Some on front and some on back
Two Power Strips shall be mounted along the back of each side of each
cabinet.
APC 1500 UPS shall be installed in both Transfort cabinets.
All three cabinets shall have two 20 Amp, 110 volt AC quad electrical outlets,
each on separate circuits. 44
The adjacent side panels of the Transfort cabinets shall be removed and the
cabinets shall be connected together.
Ix
WO
H LL
U)
Wfl
W 0
yZV
ZJZ
�VJ
HBO
V
tL ~
O
0 O LL
V
The designated radio data cables shall be terminated on a dedicated 24-port
Category 6 copper patch panel in the middle cabinet. The designated GPS
( �)
clock data cables shall be terminated on a 24-port Category 6 copper patch
�I
panel located in the middle cabinet. Category 6 network cables for Video
Surveillance Cameras shall be terminated on a dedicated 24-port copper
ALLEI-LINOX' �
patch panel in the NetComm cabinet.
" c
A separate enclosed cable management system shall be installed between
--1
the NetCom cabinet and the Transfort cabinets.
To provide cable management for the structural Category 6 cable coming
into the ER/MDF closet, an enclosed cable management system shall be
,
installed to provide a cable route to the copper patch panels located in two
of the three cabinets. Cable entry into the top of the cabinet shall be
o: W'�
designed to mitigate overhead water damage.
I .�
cYMO
SYHem
MenapemeH'..
`
o
awest 4" Contl
(Under Slab)
Cable
Ir Menegamenl
SYHem:-.:
Tritntl
caMnet Two 4" Contluit
extending Gem
me West vault
One 4" Contluit
extending from
the East vauB.
(Under Slab)
Tie In new STC Gate wimp
through east vault
Tren Ifort
GbInet
Netcomm
CebinH
Three cabinets shall be installed in the ER/MDF closet.
1 —Netcomm cabinet —This cabinet will be physically separated
from the Transfort cabinets. The lock on the door will be keyed
differently than the Transfort cabinets
2 -Transfort cabinets —These cabinets will be populated with the
Transfort's identified systems.
All three cabinets shall have two 20 Amp, 110 volt AC quad electrical
outlets, each on separate circuits.
An electrical ground as defined by building codes shall be provided on
a 6" bar mounted 6" above the finished floor. This grounding bar shall
be connected to building steel (main building ground electrode), a
separate concrete -encased electrode, or a buried ring ground with 00
copper wire using a short feed to the actual ground.
There are two options for the flooring. One option is for the a sealant to
be applied to the concrete floor or aanti-static vinyl compositional file
will need to be installed.
On the north wall, a'/:' A-C plywood board shall be securely mounted
to the wall. The plywood board shall be mounted horizontally and
painted white in color.
A key fob reader shall be installed on the door leading into the ER/MDF
closet.
Two conduits coming in from the West fiber optic vault shall be 4" in
diameter. One conduit coming in from the East fiber optic vault shall
be 4" in diameter. All three conduits shall extend a minimum of 2"
above the floor space.
Two 2" conduits shall be run independently to two separate
waterproof junction boxes on the roof of the building in a direct line for
use with communication devices mounted on the roof.
A separate earth ground shall be provided at the roof junction box
point and the conduit shall be grounded separately from the ground in
the equipment room. A 1" conduit terminating in a weatherproof
duplex box shall be provided from the roof to the closet electrical
panel for electrical power.