Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7392 CIVIL ENGINEERING DESIGN DRAFTING & SURVEY SERVICES ON-CALL (12)Po gas-t s i 3 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP, INC. DATED: 2-23-15 Work Order Number: 01 -ICG-SRTS-1 5 Purchase Order Number: Project Title: Tavelli Multi -Use Path Civil Design Original Bid/RFP Project Number & Name: 7392 Civil Engineering, Design, Drafting & Survey Services Commencement Date: 3-1-2015 Completion Date: 8-1-2015 Maximum Fee: (time and reimbursable direct costs):$35,000 Project Description: See Attached. Scope of Services: See Attached. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional �v��P cam-. By: Date: 2-17-2015 City of Fort Collins By: Robert Mosbev e Chief Construction Inspector Date: 2-23-2015 By: Gerry Paul Director of Purchasing and Risk Management (over$60,000.00) Date: February 1, 2015 Mr. Rob Mosbey City of Fort Collins - Engineering PO Box 580 Fort Collins, CO 80522-0580 Tavelli Multi -Use Path Civil Design Project Description and Scope of Services Dear Rob, Attached is the project scope and description: Description 4wrewwearrow 3UL7lNG Gnaus Interwest will work with your department as well as King Surveyors to design a multi -use path connecting the Tavelli Elementary School with an existing sidewalk south of the school. This multi -use path will be located on the east side of Lemay Avenue and will use an existing pedestrian bridge across a canal. There will be a new signalized pedestrian/school crossing to connect the new multi -use path with an existing sidewalk on the west side of Lemay Avenue just north of Linden Gate Court. This project will go through the Colorado Department of Transportation (CDOT) Local Agency process. Scope of Services Topographic Survey — King Surveyors (King) will provide a topographic survey of the project corridor. The survey will include one -foot contours and platted property lines and easements on the east side of Lemay Avenue. The survey will be tied to the City of Fort Collins Bench Mark (NAVD 1988) and will be tied to the State Plane Coordinates, North Zone 1983/07. Utility locates will be ordered by King using the One Call System and King will locate the utility marks made by the respective companies. Estimated Fee: $5,000 2. Multi -use Path Design (Conceptual & FIR) — Interwest will prepare a conceptual layout of the multi- use path. After approval of the conceptual layout, Interwest will move to the preliminary plans and determine easement needs for the project. Interwest will prepare FIR plans, outline specifications and a drainage report for submittal to the City and CDOT. The FIR plan set will include multi -use path plans, grading plans, and drainage plans for the canal crossing. It is assumed that all work will be within the existing Right -of -Way (ROW). Estimate Fee $10, 000 3. Multi -use Path Design (FOR) — After the FIR meeting, Interwest will prepare the FOR plans, specifications, tab sheets, estimates and drainage report for submittal to the City and CDOT. All comments received during the FIR meeting will be incorporated into the plan set. Estimate Fee $15,000 4. Bid Set (100%) Design — Interwest will address the comments from the FOR Submission and prepare the drawings and specifications for bidding. No additional sheets are anticipated with the phase unless a new drawing is needed for clarification. Estimate Fee $3,000 1218 W. ASH, STE. C, WINDSOR, COLORADO 80550 TEL. 970.674.3300 — FAX 970.674.3303 5. Meetings/Coordination— Interwest will be responsible for the project from start to finish. Interwest will coordinate all the design and documentation requirements of the team prior to releasing information for review to the City. As the lead consultant, Interwest will take full responsibility for the quality control means and methods and will not rely on the City to preform quality control reviews of the construction documents. Interwest will attend the FIR and FOR meetings with the City and CDOT. Estimate Fee $2,000 Total proposed fee - $35,000 Assumptions — I. It is assumed CDOT will provide the environmental clearances for the project corridor. 2. There will be no structural or geotechnical services needed for the multi -use path design. 3. There will be no permanent ROW impacts or property acquisitions. 4. The City will plot out and provide all hard copies needed for the FIR and FOR submissions to CDOT. 5. Interwest will not provide CM or CA services. Schedule We can proceed immediately with the project. Please call me at 970-460-8471 if you have any questions or need any additional information. Thanks, n 44t /°� Michael Oberlander, PE