Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7175 BRIDGE INSPECTION MAINTENANCE REPAIR AND REPLACEMENT PROGRAM (15)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MICHAEL BAKER JR., INC. DATED: February 25, 2015 Work Order Number: 4-254902100-15 Purchase Order Number: Project Title: Arthur Ditch Manhole Retrofits Project Post -Design Support Services Original Bid/RFP Project Number & Name: Commencement Date: 2/2512015 Completion Date: 5/29/2015 Maximum Fee: (time and reimbursable direct costs): Not to exceed $6,020.00 7,1 -0 /� Project Description: Arthur Ditch Manhole Retrofits Project Post -Design Support Services Scope of Services. See attached. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date: 2l2 V1S— City of Fort By: Project Manager: ang Date: �� By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: 165 South Union Boulevard, Suite 200 1 Lakewood, CO 80228 Office: 720.514.110 1 Fax: 720.479.3157 TO: Jin Wang, City of Fort Collins FROM: Dave Nemovitz, Michael Baker International DATE: February 25, 201S PROJECT: Design Services for Arthur Ditch Manhole Retrofits at Lake Street and Prospect Road Project SUBJECT: Post -Design Support Services - Scope of Work & Fee Estimate At the request of the City, Baker will provide post -design engineering support during construction for the above referenced project. As the Engineer -of -Record, Baker is best suited to support the City for this work, including: • Review of contractor submittals (working drawings, shop drawings, and product information) • Review and response of contractor requests for information (RFI) • Other technical support as requested by the City. An approximate estimate of labor and fee has been prepared to support this work. The estimate is approximate because the level and scale of the work is not known at this time, and is subject to the Contractor's needs. Therefore, if additional scope is needed beyond that assumed in the attached estimate, a change order would be needed to complete that work. This requested is for a total $6,020. Please refer to the attached estimate for a breakdown of costs. Please contact me if you have an questions or concerns. Regards, Dave Nemovitz, PE Enclosure MICI IAH BAKER INTERNAT10NA1, C" Global Innovatiorv... Done Right :1.111► /®LLLYPORT PNISI (t M