HomeMy WebLinkAboutCHANGE ORDER - AGREEMENT MISC - DITESCO LLC (3)PROJECT TITLE: PROJECT MANAGER: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change: CHANGE ORDER NO.1 Council Tree Library Remodel Ditesco nla (See below) 9/!5--)-Z-q 9' The reason for this contract change is to allow Project and Construction Management oversite to complete the Council Tree Library remodel. Ditesco was originally contracted to provide project and construction management services on the Library Streetscape and Library Diagonal Walk projects, as well as on -call services for the Old Town Library Expansion Project close out. The construction remodel of the Council Tree Library is scheduled to be completed by January 2015. The original scope of work and agreement Is attached hereto as Attachment B, 2. Description of Change: The description of the contract change is attached hereto as Attachment A The contract change includes creation of bid documents, facilitation of the bidding process, resident engineering services during construction, and close out procedures 3. Change In Contract Cost: $5,593.00 4. Change in Contract Time: Contract time for this work Is extended to March 1, 2015. ORIGINAL CONTRACT COST $2.222,00 TOTAL APPROVED CHANGE ORDER $0.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER ch- $ 5,59 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 251.71% TOTAL % OF ORIGINAL CONTRACT, ALL C O.'S 251.71% ADJUSTED CONTRACT COST $7,815.00 (Assumino all chance orders aoaroved) ACCEPTED BY: h— DATE: 41 Z4 l4- Project Manager's Representative ACCEPTED BY: DATE 143— Owner �uc%2. r2i ✓2r" �r v L %1ru �5�!/Cr/��%� l�it� cc Owner Project File Project Manager EXHIBIT A dilesco 1315 OakrldgDrive ,Suite 2 Fort Collins, CO 80525 970.204.1673 fax Project & Construction Services ditescoservices.com Delivery via email kdraves apo udrelib ra ries. org September 30, 2014 Mr. Ken Draves Poudre River Public Library District 201 Peterson Street Fort Collins, CO 80524 RE: Council Tree Library Remodel Scope of Services Project Management/Owner's Representative Services Dear Ken: We are pleased to present you with this summary of anticipated scope of services: • Create final bidding package contract documents. • Facilitate bidding process, including contacting potential bidders, conducting a pre -bid walk through, collection of final bids, and bid award. • Facilitate pre -construction meeting. • Oversee, manage, and coordinate construction amongst Successful Bidder, City On -Call contractors, and sole -source supplier contractors. • Review and process Pay Applications through the Library District. • Perform routine inspections of the work; ensure conformance to contract documents. • Process project close out, including completing punch list walk through and follow up. • Other miscellaneous services as requested by the Library District. Thank you for contacting us to be a part of this project. If you have any questions regarding this scope of services, I can be reached by phone at 970.690.1889 or email at iill.burrell(cDditescoservices.com. Sincerely, Jill Burrell, E.I. ditesco Project & Construction Services Council Tree Library 11011161201171 Phase/Task Description Classification Task Total Keith Meyer (hrs) Jill Burrell (hrs) $120 $95 Task: Bid Phase Services $1,073 1.1 Contract Management - Bid Document Assembly 1 2 $310 - Bid Distribution 0 0 $0 - Pre -Bid Meeting 1 2.5 $358 -Addenda 0 0 $0 - Notice of Award 0 1 $95 - Contract Creation 1 2 $310 Task: Construction Phase Services $4,520 1.14 Resident Engineering - Site inspections assume approx 1hr/da 2 16 $1.760 1.13 RFis 2 2 $430 1.9 Submittal review 0 6 $570 1.10 Progress Meetings 2 6 $010 2.1 Start Up and Testing 0 4 $380 3.4 Project Close Out 0 6 $570 Work Effort Subtotal 9 48 $5,593 Subtotal Reimbursable Items $0 Contract Total $5,593 Cost per labor category, $1,080 $4,513 Effort (days)l 1.1 5.9 Effort (weeks)l 0.2 1 1.2 EXHIBIT B dmilesce 1315 Oakridgt Conlin ,Suite 525 Fort Collins, CO 80525 970.204.1673 fax Project and Construction Services ditescoservices.com delivered via email KDraves(o)poudrelibraries. org April 19, 2013 Mr. Ken Draves Deputy Director Poudre River Public Library District 201 Peterson Street Fort Collins, CO 80524 RE: Project and Construction Management Professional Services Agreement Building Expansion Project Dear Ken: We are pleased to present you with this Agreement for Professional Services for the Library Expansion Project. It is our understanding that Poudre River Libraries will be completing an 11 month walk through of the Old Town Library Building Expansion project. As previously discussed, Ditesco staff will be utilized in an on -call hourly basis at the discretion of the Library. Our team will be readily available throughout the completion of the project to provide oversight, inspection, and owner representation to ensure your needs are met. Attached is our Professional Services Agreement, as well as a Ditesco Wage Rate Schedule. Please review as necessary. If you find everything in order, please execute and return 2 copies to my attention. I will return a fully executed copy for your records. Please feel free to contact me with any questions or concerns. I can be reached by phone at 970-206-0878 or email at keith.meyer(aDditescoservcies.com. I look forward to a successful project with the Poudre River Public Libraries District! Sin erely, � Keith Meyer, RE Enc: Agreement for Professional Services Cc: Jill Burrell File