Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWORK ORDER - RFP - 7392 CIVIL ENGINEERING DESIGN DRAFTING & SURVEY SERVICES ON-CALL (3)WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
AECOM
DATED: 02/2412015
Work Order Number: 1-AECOM-902070-2015
Purchase Order Number.
Project Title: AECOM Arbitration Support
Original BidrRFP Project Number & Name: 7392 (Civil Engineering Design On -Call Service Contract
Commencement Date: 02/24/2015
Completion Date: 06/2312015
Maximum Fee: (time and reimbursable direct costs): $8,101.00
Project Description: Arbitration support associated with the Citit+'s dispute with Growling Bear for the
South Transit Center construction.
Scope of Services: Review_previously prepared claim analvsis documents. oadicinatP in intervfcwc by
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of one (1) page are
hereby accepted and incorporated herein, by this
reference, and Notice to Proceed is hereby given.
Professional
%%
By:
Date: 2%2 �i /2o(-T
�^1
City of Fo ollin�s { %
By: Ed a
Project Manager
Date: 02/24/2015
By:
Gerry Paul
Director of Purchasing and Risk Management
(over $60,000.00)
Date: