PROJECTTITLE: N. College, Conifer to Willox
PROJECT NUMBER: 400903950.3
CONTRACTOR: Interwest Consulting Group (PO #9124622)
CHANGE ORDER NUMBER: 3
n preparing cnange orders snow In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detall.
3. The contract cost Wit increase by $ 76,822.78
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$675,649.57
TOTAL APPROVED CHANGE ORDERS
$71 244 00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$76,822.78
TOTAL % OF THIS CHANGE ORDER
11.37%
TOTAL C.O. % OF ORIGINAL CONTRACT
21,91%
ADJUSTED CONTRACT COST
$823,716.36
(Assuming all change orders approved)
ACCEPTED BY: J'LdYlfAT a
DATE:
(Contra rs Representative)
REVIEWED BY: X
DATE:
SUBMITTED BY:
APPROVED BY:
APPROVED BY:
cc: Contractor
Purchasing
Project File
)ATE: Z,( ?'0((J
DATE:
DATE: Z - Zq - tj /
November 17, 2014
Mr. Randy Maizland
City of Fort Collins
281 College Avenue
Fort Collins CO 80522
RE: N. College Avenue — Conifer to Willox
Change Order Request #3
Dear Randy,
INTERWEST CONSULTING G ROU P
Please accept this request for additional services in the amount of $76,822.78 for the North College — Conifer
to Willox Improvement Project based on our previous discussions.
Summary
The Interwest Team will provide additional services as further described below and pursuant to the attached
sub -consultant proposals for construction related services.
Additional Services
1. Construction Administration
Task I — Meetings and Site Visits: Interwest Team members will attend various onsite meetings such as
the pre -construction meeting, partnering meeting, monthly team coordination meetings and weekly project
meetings and site visits as further outlined in the attached documents for each team member.
Interwest Labor Fee:
$11,450.38
AECOM Labor Fee:
S 1,790.00
BHA Labor Fee:
$ 5,880.00
Hines Labor Fee:
$ 5,600.00
Task Subtotal
$24,720.38
Task 2 —Minor Plan Revisions and General Consulting Services: Interwest Team members will provide
general consulting services and technical support during construction. This includes an estimate for minor
design revisions to clarify construction means and methods as further outlined in the attached documents
for each team member. Significant design changes will be considered an additional service and will be
determined on an individual case basis with the City Project Manager.
Interwest Labor Fee:
S 4,937.24
AECOM Labor Fee:
$ 6,790.00
BHA Labor Fee:
$ 1,680.00
Hines Labor Fee:
$ 1,000.00
Task Subtotal
$14,407.24
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INTERWEST CONSULTING GROUP INC.
DATED: 7-27-12
Work Order Number:
Purchase Order Number:
Project Title: 7392 CIVIL ENGINEERING, DESIGN, DRAFTING & SURVEY SERVICES ON -CALL
Jensen MLD
Commencement Date: 9-1-14
Completion Date: 2-1-15
Maximum Fee: (time and reimbursable direct costs): $1,300 ADD (NEW TOTAL $7,500)
Project Description: SEEATTACHED
Scope of Services: SEEATTACHED
City P.M. Acceptance
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of One (1) pages
are hereby accepted and incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
Professional: I nterwest
By:,
Date: 12-31-14
City of Fort Collins
BykJ44l > v
Gerry Paul
Director of Purchasing and Risk Management
(over $60,000.00)
Date:�`� hs-
RFP 7392 Civil Engineering, Design, Drafting & Survey Services On -Call
December 31, 2014
Ms. Tawnya Ernst
City of Fort Collins — Operations Services
PO Box 580
Fort Collins, CO 80522-0580
Jensen MLD — Add 1
Project Description and Scope of Services
Dear Tawnya,
INTERVYEST C O N SULTING GROUP
Attached is the project scope and description: Items related to this additional service request are in bold italics.
Description
King Surveyors will provide a Minor Land Division Plat of the property at 1408 Wood Lane (the Jensen Property)
in accordance with Latimer County code.
Scope of Services
Minor Land Division Plat — King Surveyors will prepare a Minor Land Division Plat of the Jensen property. The
fee includes the initial submittal and two additional submittals addressing County comments. A current Title
Commitment and copies of the Schedule B Exceptions will need to be provided by the City before starting the
project. The fee includes setting the pins and one set of final mylars. Additional fieldwork and property research
are necessary to completed this task.
Estimated Fee: $5,900 —ADD $1,300
Coordination — Interwest will provide administrative services related to the invoicing of this project through its
General Service Contract.
Estimated Fee: $300
Assumptions-
1. A current Title Commitment and copies of the Schedule B Exceptions will be provided by the City.
2. Major changes made to the layout after the initial draft will be billed at our standard hourly rates.
3. Attending meetings and copies for submittals are not included in the fee.
4. Any services required for the project not specifically discussed above will be provided by the City.
5. The City will be responsible for all submittals to the County and will be the applicant.
Schedule
We can proceed immediately with the project. Please call me at 970-460-8471 if you have any questions or need
any additional information.
Thanks,
Michael Oberlander, PE
1218 W. ASH, STE. C, WINDSOR, COLORADO 80550
TEL, 970.674.3300 — FAX 970.674.3303
Task 3 — RFXs and Shop Drawings — The Interwest Team will respond to Requests for Information (RPIs)
and review/approve applicable shop drawings presented by the contractor or city project manager for
construction.
Interest Labor Fee:
$ 4,515.63
AECOM Labor Fee:
$ 3,400.00
BHA Labor Fee:
$ 1,890.00
Hine Labor Fee:
$ 1,250.00
Task Subtotal
$11,055.63
Task 4 — Record Drawings — The Interwest Team will provide a paper set of I lx17 Record Drawing at the
end of the project based upon the contractor's final redline set of plans and field survey data provided by
the contractor, along with a punch list meeting and final site walk with the contractor and city project
manager.
Interest Labor Fee: $ 6,391.53
AECOM Labor Fee: $ 790.00
BHA Labor Fee: $ 3,150.00
Hines Labor Fee: $ 850.00
Task Subtotal $11,181.53
Task 5 — Survey Monumentation — 105 West will set fifty seven (57) CDOT type I monuments in
accordance with the approved Right of Way Plans.
105 West Labor Fee:
$12,080.00
Task 6 — Reimbursable Expenses — The Interwest Team will incur direct reimbursable expenses such as
travel mileage to meetings, graphics and printing charges in their execution of this Change Order.
Intenvest Fee: $2,000.00
AECOM Fee: $ 900.00
BHA Fee: $ 378.00
Hines Fee: $ 100.00
Task Subtotal $3,378.00
Change Order #3 Total $76,822.78
Thank you for your consideration of this request. Please call me at 970-460-8487 if you have any questions or
need any additional information.
Sincerely,
al� A4�X
Robert Almirall, PE
Senior Project Manager