Loading...
HomeMy WebLinkAboutBID - 8038 ARTHUR DITCH WOOD STREET BRIDGE REPLACEMENT (2)SPECIFICATIONS AND CONTRACT DOCUMENTS FOR ARTHUR DITCH WOOD STREET BRIDGE REPLACEMENT BID NO. 8038 PURCHASING DIVISION 215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS DECEMBER 17, 2014 – 3:00 P.M. (OUR CLOCK) Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing CONTRACT DOCUMENTS TABLE OF CONTENTS Section Pages BID INFORMATION 00020 Notice Inviting Bids 00020-1 - 00020-2 00100 Instruction to Bidders 00100-1 - 00100-9 00300 Bid Form 00300-1 - 00300-3 00400 Supplements to Bid Forms 00400-1 00410 Bid Bond 00410-1 - 00410-2 00420 Statements of Bidders Qualifications 00420-1 - 00420-3 00430 Schedule of Major Subcontractors 00430-1 CONTRACT DOCUMENTS 00500 Agreement Forms 00500-1 00510 Notice of Award 00510-0 00520 Agreement 00520-1 - 00520-6 00530 Notice to Proceed 00530-1 00600 Bonds and Certificates 00600-1 00610 Performance Bond 00610-1 - 00610-2 00615 Payment Bond 00615-1 - 00615-2 00630 Certificate of Insurance 00630-1 00635 Certificate of Substantial Completion 00635-1 00640 Certificate of Final Acceptance 00640-1 00650 Lien Waiver Release (Contractor) 00650-1 - 00650-2 00660 Consent of Surety 00660-1 00670 Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications, and Payment 00900-1 00950 Contract Change Order 00950-1 - 00950-2 00960 Application for Payment 00960-1 - 00960-4 SPECIFICATIONS SECTION 00020 INVITATION TO BID SECTION 00020 INVITATION TO BID Date: November 26, 2014 Sealed Bids will be received by the City of Fort Collins (hereinafter referred to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock, on December 17, for the Arthur Ditch Wood Street Bridge Replacement; BID NO. 8038. If delivered, they are to be delivered to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing address is P. O. Box 580, Fort Collins, CO 80522-0580. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The Contract Documents provide for the construction of Bid 8038. The work on this bridge includes removal of a potion of existing bridge (CBC), construction of new bridge, excavation, hot mix asphalt, concrete flat work and traffic control. The project also includes installation of trash guard, storm water inlet, curb & gutter, sidewalk & ramp, sanitary sewer and water main realignments. . All Bids must be in accordance with the Contract Documents on file with the City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. The City encourages all disadvantaged business enterprises to submit bid in response to all invitations and will not be discriminated against on the grounds of race, color, national origin. A prebid conference and job walk with representatives of prospective Bidders will be held at 10:00 am, on December 5, 2014, in 2E at 215 N Mason, Fort Collins. Prospective Bidders are invited to present their questions relative to this Bid proposal at this meeting. The Contract Documents and Construction Drawings may be examined online at:  Rocky Mountain E-Purchasing System: www.rockymountainbidsystem.com Bids will be received as set forth in the Bidding Documents. The Work is expected to be commenced within the time as required by Section 2.3 of General Conditions. Substantial Completion of the Work is required as specified in the Agreement. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. No Bid may be withdrawn within a period of forty-five (45) days after the date fixed for opening Bids. The OWNER reserves the right to reject any and all Bids, and to waive any informalities and irregularities therein. Bid security in the amount of not less than 5% of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision- making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. City of Fort Collins Gerry S. Paul Director of Purchasing & Risk Management SECTION 00100 INSTRUCTIONS TO BIDDERS SECTION 00100 INSTRUCTIONS TO BIDDERS 1.0 DEFINED TERMS Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract (No. 1910-8, 1990 ed.) have the meanings assigned to them in the General Conditions. The term "Bidder" means one who submits a Bid to OWNER, as distinct from a sub-bidder, who submits a Bid to Bidder. The terms "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder to whom OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an award. The term "Bidding Documents" includes the Advertisement or Invitation to Bid, Instructions to Bidders, the Bid Form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids). 2.0 COPIES OF BIDDING DOCUMENTS 2.1. Complete sets of Bidding Documents may be obtained as stated in the Invitation to Bid. No partial sets will be issued. The Bidding Documents may be examined at the locations identified in the Invitation to Bid. 2.2. Complete sets of Bidding Documents shall be used in preparing Bids; neither OWNER nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 2.3. The submitted Bid proposal shall include Sections 00300, 00410, 00420, and 00430 fully executed. 2.4. OWNER and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids on the Work and do not confer a license or grant for any other use. 3.0 QUALIFICATION OF BIDDERS 3.1 To demonstrate qualifications to perform the Work, each Bidder must submit at the time of the Bid opening, a written statement of qualifications including financial data, a summary of previous experience, previous commitments and evidence of authority to conduct business in the jurisdiction where the Project is located. Each Bid must contain evidence of Bidder's qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract. The Statement of Qualifications shall be prepared on the form provided in Section 00420. 3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins in determining whether a bidder is responsible, the following shall be considered: (1) The ability, capacity and skill of the bidder to perform the contract or provide the services required, (2) whether the bidder can perform the contract or provide the service promptly and within the time specified without delay or interference, (3) the character, integrity, reputation, judgment, experience and efficiency of the bidder, (4) the quality of the bidder's performance of previous contracts or services, (5) the previous and existing compliance by the bidder with laws and ordinances relating to the contract or service, (6) the sufficiency of the financial resources and ability of the bidder to perform the contract or provide the service, (7) the quality, availability and adaptability of the materials and services to the particular use required, (8) the ability of the bidder to provide future maintenance and service for the use of the subject of the contract, and (9) any other circumstances which will affect the bidder's performance of the contract. 3.3. Each Bidder may be required to show that he has handled former Work so that no just claims are pending against such Work. No Bid will be accepted from a Bidder who is engaged on any other Work which would impair his ability to perform or finance this Work. 3.4 No Bidder shall be in default on the performance of any other contract with the City or in the payment of any taxes, licenses or other monies due to the City. 4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE 4.1. It is the responsibility of each Bidder, before submitting a Bid, to (a) examine the Contract Documents thoroughly, (b) visit the site to familiarize himself with local conditions that may in any manner affect cost, progress or performance of the Work, (c) familiarize himself with federal, state and local laws, ordinances, rules and regulations that may in any manner affect cost, progress or performance of the Work, (d) study and carefully correlate Bidder's observations with the Contract Documents, and (e) notify Engineer of all conflicts, errors or discrepancies in the Contract Documents. 4.2. Reference is made to the Supplementary Conditions for identification of: Subsurface and Physical Conditions SC-4.2. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction as may be indicated in or required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 5.0 INTERPRETATIONS AND ADDENDA. 5.1. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer and the OWNER. Interpretation or clarifications considered necessary in response to such questions will be issued only by Addenda. Questions received less than seven days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. 5.2. All questions concerning the scope of this project should be directed to the Engineer. Questions regarding submittal of bids should be directed to the City of Fort Collins' Purchasing Division. 5.3. Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER or Engineer. 5.4. Addenda will be mailed or delivered to all parties recorded by the OWNER as having received the Bidding documents. 6.0 BID SECURITY 6.1. Each Bid must be accompanied by Bid Security made payable to OWNER in the amount stated in the Invitation to Bid. The required security must be in the form of a certified or bank cashier's check payable to OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be executed by a surety meeting the requirements of the General Conditions for surety bonds. 6.2. The Bid Security of the successful Bidder will be retained until such Bidder has executed the Agreement and furnished the required contract security, whereupon Bid Security will be returned. If the successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited. The Bid Security of other Bidders whom OWNER believes to have reasonable chance receiving the award may be retained by OWNER until the earlier of the seventh day after the effective date of the Agreement or the thirty-first day after the Bid Opening, whereupon Bid Security furnished by such Bidders will be returned. Bid Security with Bids which are not competitive will be returned within seven days after the Bid opening. 7.0 CONTRACT TIME. The number of days within which, or the date by which the Work is to be substantially complete and also completed and ready for Final Payment (the Contract Times) are set forth in the Agreement. 8.0 LIQUIDATED DAMAGES. Provisions for liquidated damages are set forth in the Agreement. 9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT The Contract, if awarded, will be on the basis of material and equipment described on the Drawings or specified in the Specifications without consideration of possible substitute or "or equal" items. Whenever it is indicated on the Drawings or specified in the Specifications that a substitute or "or equal" item of material or equipment may be furnished or used by CONTRACTOR if acceptable to Engineer, application for such acceptance will not be considered by Engineer until after the "effective date of the Agreement". The procedure for submittal of any such application by CONTRACTOR and consideration by Engineer is set forth in the General Conditions which may be supplemented in the General Requirements. 10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS 10.1. Each Bidder shall submit at the Bid opening to OWNER a list of principal subcontractors he proposes to use in the Work. Refer to Section 00430 contained within these Documents. 10.2. If OWNER or Engineer after due investigation has reasonable objection to any proposed Subcontractor, either may, before the Notice of Award is given, request the apparent successful Bidder to submit an acceptable substitute without an increase in Bid price. If the apparent successful Bidder declines to make any substitution, OWNER may award the contract to the next lowest responsive and responsible Bidder that proposes to use acceptable subcontractors. Subcontractors, suppliers, other persons or organization listed and to whom OWNER or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the effective date of the Agreement as provided in the General Conditions. 10.3. CONTRACTOR shall not be required to employ any subcontractor, supplier or other persons or organizations against whom he has reasonable objection. The use of subcontractors listed by the Bidder and accepted by OWNER prior to the Notice of Award will be required in the performance of the Work. 11.0 BID FORM. 11.1. A copy of the Bid Form is bound in the Contract Documents which may be retained by the Bidder. A separate unbound copy is enclosed for submission with the Bid. 11.2. Bid Forms must be complete in ink or typed. All lump sum prices on the form must be stated in words and numerals; in case of conflict, words will take precedence. Unit prices shall govern over extensions of sums. 11.3. Bids by corporations must be executed in the corporate name by the president or a vice-president (or other appropriate officer accompanied by evidence of authority to sign) and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the corporate name. 11.4. Bids by partnerships must be executed in the partnership name and signed by a partner, his title must appear under his signature and the official address of the partnership must be shown below the signature. 11.5. Bids by joint venture shall be signed by each participant in the joint venture or by an authorized agent of each participant. The full name of each person or company interested in the Bid shall be listed on the Bid Form. 11.6. The Bid shall contain an acknowledgement of receipt of all Addenda (the numbers of which must be filled in on the Bid Form). 11.7. No alterations in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the Bidder; if initialed, OWNER may require the Bidder to identify any alteration so initialed. 11.8. The address and telephone number for communications regarding the Bid shall be shown. 12.0 BID PRICING. Bids must be priced as set forth in the Bid Schedule or Schedules. 13.0 SUBMISSION OF BIDS. 13.1. Bids shall be submitted at the time and place indicated in the Invitation to Bid and shall be enclosed in an opaque sealed envelope marked with the Project title, Bid No., and name and address of the Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement of Bidders Qualifications, and Schedule of Subcontractors as required in Section 00430. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 13.2. Bids shall be deposited at the designated location prior to the time and date for receipt of Bids indicated in the Invitation to Bid, or any extension thereof made by addendum. Bids received after the time and date for receipt of Bids will be returned unopened. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. 13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and will not receive consideration. 13.4. No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. 14.0 MODIFICATION AND WITHDRAWAL OF BIDS. 14.1. Bids may be modified or withdrawn by an appropriate document duly executed (in a manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. 14.2. Bids may also be modified or withdrawn in person by the Bidder or an authorized representative provided he can prove his identity and authority at any time prior to the opening of Bids. 14.3. Withdrawn Bids may be resubmitted up to the time designated for the receipt of Bids provided that they are then fully in conformance with these Instructions to Bidders. 15.0 OPENINGS OF BIDS. Bids will be opened and (unless obviously non-responsive) read aloud publicly as indicated in the Invitation to Bid. An abstract of the amounts of the Base Bids and major alternates (if any) will be made available after the opening of Bids. 16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE. All Bids shall remain open for forty-five (45) days after the day of the Bid Opening, but OWNER may, in his sole discretion, release any Bid and return the Bid Security prior to that date. 17.0 AWARD OF CONTRACT. 17.1. OWNER reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work, to negotiate contract terms with the Successful Bidder, and the right to disregard all nonconforming, nonresponsive, unbalanced or conditional Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 17.2. In evaluating Bids, OWNER will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award. 17.3. OWNER may consider the qualification and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations is submitted as requested by OWNER. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.4. OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of the Bidder's proposed Subcontractors, Suppliers and other persons and organizations to do the Work in accordance with the Contract Documents to OWNER's satisfaction within the prescribed time. 17.5. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interest of the OWNER. Award shall be made on the evaluated lowest base bid excluding alternates. The basis for award shall be the lowest Bid total for the Schedule or, in the case of more than one schedule, for sum of all schedules. Only one contract will be awarded. 17.6. If the Contract is to be awarded, OWNER will give the Successful Bidder a Notice of Award within forty-five (45) days after the date of the Bid opening. 18.0 CONTRACT SECURITY. The General Conditions and the Supplementary Conditions set forth OWNER's requirements as to performance and other Bonds. When the Successful Bidder delivers the executed Agreement to the OWNER, it shall be accompanied by the required Contract Security. 19.0 SIGNING OF AGREEMENT. When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER hall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification. 20.0 TAXES. OWNER is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Contract Price. Reference is made to the General and Supplementary Conditions. 21.0 RETAINAGE. Provisions concerning retainage are set forth in the Agreement. 22.0 PURCHASING RESTRICTIONS. Purchasing restrictions: The Bidder's authorized signature of this Bid assures the Bidder's compliance with the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing and Risk Management Division or the City Clerk's office. A. Cement Restrictions: City of Fort Collins Resolution 91-121 requires that suppliers and producers of cement or products containing cement to certify that the cement was not made in cement kilns that burn hazardous waste as a fuel. 23.0 COLLUSIVE OR SHAM BIDS. Any Bid deemed by the City in its sole discretion to be a collusive or sham Bid will be rejected and reported to authorities as such. Your authorized signature of this Bid assures that such Bid is genuine and is not a collusive or sham Bid. 24.0 BID RESULTS. For information regarding results for individual Bids send a self-addressed, self-stamped envelope and a Bid tally will be mailed to you. Bid results will be posted in the Purchasing office seven (7) days after the Bid Opening. END OF SECTION SECTION 00300 BID FORM SECTION 00300 BID FORM PROJECT: 8038 Arthur Ditch Wood Street Bridge Replacement Place: Date: 1. In compliance with your Invitation to Bid dated , 20 and subject to all conditions thereof, the undersigned a (Corporation, Limited Liability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment Bonds is as follows: . 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. 7. The undersigned Bidder hereby acknowledges receipt of Addenda No. through . 8. BID SCHEDULE (Base Bid) ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST COST 201-00000 Clearing and Grubbing L S 1 $ - 202-00010 Removal of Tree EACH 1 $ - 202-00019 Removal of Inlet EACH 1 $ - 202-00035 Removal of Pipe LF 77 $ - 202-00200 Removal of Sidewalk SY 79 $ - 202-00203 Removal of Curb and Gutter LF 311 $ - 202-00210 Removal of Concrete Pavement SY 81 $ - 202-00220 Removal of Asphalt Mat SY 1,201 $ - 202-00495 Removal of Portions of Present Structure L S 1 $ - 202-01000 Removal of Fence LF 74 $ - 203-01100 Proof Rolling HOUR 4 $ - 206-00000 Structure Excavation CY 633 $ - 206-00100 Structure Backfill (Class 1) CY 219 $ - 208-00002 Erosion Log (12 Inch) LF 100 $ - 208-00035 Aggregate Bag LF 250 $ - 208-00045 Concrete Washout Structure EACH 1 $ - 208-00050 Storm Drain Inlet Protection EACH 3 $ - 208-00052 Storm Drain Inlet Protection (Type 2) LF 4 $ - 208-00070 Vehicle Tracking Pad EACH 2 $ - 208-00116 Sweeping (Sediment Removal) L S 1 $ - 208-00216 Erosion Control Supervisor L S 1 $ - 210-00810 Reset Ground Sign EACH 1 $ - 210-01011 Reset Gate EACH 1 $ - 210-04010 Adjust Manhole EACH 3 $ - 212-00100 Tree Retention and Protection L S 1 $ - 216-00037 Soil Retention Blanket (Coconut) SY 25 $ - 304-06007 Aggregate Base Course (Class 6) CY 198 $ - 301-09030 1 1/2" Clean Wash Rock CY 267 $ - 403-34851 Hot Mix Asphalt (Grading SX) (100) (PG 64-28) TON 392 $ - 420-00114 Geotextile (Drainage) (Class 3) SY 28 $ - 506-00212 Riprap (12 Inch) CY 14 $ - 509-00001 Structural Steel (Galvanized) LB 2,759 $ - 515-00120 Waterproofing (Membrane) SY 81 $ - 601-01000 Concrete Class B CY 1 $ - 601-03000 Concrete Class D CY 317 $ - 602-00020 Reinforcing Steel (Epoxy Coated) LB 61,526 $ - 603-50017 16 Inch Plastic Pipe (Special) LF 56 $ - 604-19005 Inlet Special (5 Foot) (Type 13 Combo) EACH 1 $ - 604-50205 Manhole Ring and Cover EACH 2 $ - 607-11580 Fence (Temporary) (Chain Link) LF 615 $ - 607-53005 Fence Chain Link (Special) LF 78 $ - 608-00000 Concrete Sidewalk SY 113 $ - 608-00012 Curb Ramp (Special) SY 41 $ - 609-21020 Curb and Gutter Type 2 (Section II-B) LF 212 $ - WOOD STREET BRIDGE REPLACEMENT BID SCHEDULE ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST COST 609-21900 Curb and Gutter Type 2 (Special) LF 14 $ - 616-30499 Trash Guard Special EACH 1 $ - 620-00020 Sanitary Facility EACH 1 $ - 626-00000 Mobilization L S 1 $ - 630-10000 Traffic Control L S 1 $ - $ - 700-70010 F/A Minor Contract Revisions F A 1 $ 70,000.00 $ 70,000.00 700-90170 F/A Water Lines F A 1 $ 90,000.00 $ 90,000.00 $ 160,000.00 IN WORDS: SUB TOTAL TOTAL BASE BID FORCE ACCOUNT 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: CONTRACTOR BY: Printed Date Title License Number (If Applicable) (Seal - if Bid is by corporation) Attest: Address Telephone Email SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and , as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of $ for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 8038 Arthur Ditch Wood Street Bridge Replacement. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this day of , 20__, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name: Address: By: By: Title: Title: ATTEST: By: (SEAL) (SEAL) SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: $ 16. Bank Reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General Contractor? If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? And to whom? 20. Are any lawsuits pending against you or your firm at this time? IF yes, DETAIL 21. What are the limits of your public liability? DETAIL What company? 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ________________ this ______ day of __________________, 20__. Company: By: Printed: Title: State of County of being duly sworn deposes and says that he is of (Name) (Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _______ day of____________, 20__. (Seal) Notary Public My commission expires: . SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM SUBCONTRACTOR SECTION 00500 AGREEMENT FORMS 00510 Notice of Award 00520 Agreement 00530 Notice to Proceed SECTION 00510 NOTICE OF AWARD DATE: [Date] TO: [Contractor] PROJECT: 8038 Arthur Ditch Wood Street Bridge Replacement OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated [Contractor's Bid Date] for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 8038 Arthur Ditch Wood Street Bridge Replacement. The Price of your Agreement is ($ ). Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by [Date]. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of the Agreement with the Contract Documents attached. City of Fort Collins OWNER By: Gerry S. Paul Director of Purchasing & Risk Management SECTION 00520 AGREEMENT THIS AGREEMENT is dated as of the [Day] day of [Month] in the year of 20[Year] and shall be effective on the date this AGREEMENT is signed by the City. The City of Fort Collins (hereinafter called OWNER) and [Contractor] (hereinafter called CONTRACTOR) OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Project for which the Work under the Contract Documents may be the whole or only a part is defined as the construction of the 8038 Arthur Ditch Wood Street Bridge Replacement and is generally described in Section 01010. ARTICLE 2. ENGINEER The Project has been designed by Michael Baker, Jr., Inc, who is hereinafter called ENGINEER and who will assume all duties and responsibilities and will have the rights and authority assigned to ENGINEER in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. ARTICLE 3. CONTRACT TIMES 3.1 The Work shall be Substantially Complete within Ninety(90) calendar days after the date when the Contract Times commence to run as provided in the General Conditions and completed and ready for Final Payment and Acceptance in accordance with the General Conditions within One Hundred Four (104) calendar days after the date when the Contract Times commence to run. 3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3.1. above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal preceding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as Liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: One thousand eight hundred Dollars ($1800) for each calendar day or fraction thereof that expires after the Ninety (90) calendar day period for Substantial Completion of the Work until the Work is Substantially Complete. 2) Final Acceptance: After Substantial Completion, One Thousand Eight Hundred Dollars ($1800) for each calendar day or fraction thereof that expires after the Fourteen (14) calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. ARTICLE 4. CONTRACT PRICE 4.1 OWNER shall pay CONTRACTOR for performance of the Work in accordance with the Contract Documents in current funds as follows: Dollars ($ ), in accordance with Section 00300, attached and incorporated herein by this reference. ARTICLE 5. PAYMENT PROCEDURES CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions. 5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment as recommended by ENGINEER, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. 5.1.1. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as ENGINEER shall determine, or OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If , in the sole discretion of Owner, on recommendation of Engineer, Owner determines that the character and progress of the Work have been satisfactory to OWNER and ENGINEER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00520 Page 3 for payment. 5.1.2. Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as ENGINEER shall determine or OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. 5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following representations: 6.1. CONTRACTOR has familiarized himself with the nature and extent of the Contract Documents, Work, site, locality, and with all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. 6.2. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions and drawings of physical conditions which are identified in the Supplementary Conditions as provided in paragraph 4.2 of the General Conditions. 6.3. CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests, reports, and studies (in addition to or to supplement those referred to in paragraph 6.2 above) which pertain to the subsurface or physical condition at or contiguous to the site or otherwise may affect the cost, progress, performance or furnishing of the Work as CONTRACTOR considers necessary for the performance or furnishing of the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provisions of paragraph 4.2 of the General Conditions; and no additional examinations, investigations, explorations, tests, reports, studies or similar information or data are or will be required by CONTRACTOR for such purposes. 6.4. CONTRACTOR has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilities at or contiguous to the site and assumes responsibility for the accurate location of said Underground Facilities. No additional examinations, investigations, explorations, tests, reports, studies or similar information or data in respect of said Underground Facilities are or will be required by CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the Contract Times and in accordance with the other terms and conditions of the Contract Documents, including specifically the provision of paragraph 4.3. of the General Conditions. 6.5. CONTRACTOR has correlated the results of all such observations, examinations, investigations, tests, reports and data with the terms and conditions of the Contract Documents. 6.6. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR. ARTICLE 7. CONTRACT DOCUMENTS 7.1 The Contract Documents which comprise the entire Agreement between OWNER and CONTRACTOR concerning the Work consist of the General Conditions, Supplementary Conditions, those items included in the definition of “Contract Documents” in Article 1.10 of the General Conditions, and such other items as are referenced in this Article 7, all of which are incorporated herein by this reference. 7.2 Forms for use by CONTRACTOR in performing the Work and related actions in carrying out the terms of this Agreement are deemed Contract Documents and incorporated herein by this reference, and include, but are not limited to, the following: 7.2.1 Certificate of Substantial Completion 7.2.2 Certificate of Final Acceptance 7.2.3 Lien Waiver Releases 7.2.4 Consent of Surety 7.2.5 Application for Exemption Certificate 7.2.6 Application for Payment 7.3 Drawings, consisting of a cover sheet and sheets numbered as follows: Sheet No. Index of Sheet 1 TITLE SHEET 2 STANDARDS PLANS LIST 3-4 TYPICAL SECTIONS 5-6 GENERAL NOTES 7-8 SUMMARY OF APPROXIMATE QUANTITIES 9 GEOMETRIC LAYOUT 10 TABULATION OF REMOVALS, RESETS AND ADJUSTMENTS 11 REMOVALS, RESETS AND ADJUSTMENTS PLAN 12 TABULATION OF ROADWAY QUANTITIES 13 ROADWAY PLAN 14-16 ROADWAY PROFILES 17-19 GUTTER FLOWLINE PROFILES 20 ROADWAY DETAILS 21 TABULATION OF EROSION CONTROL QUANTITIES 22 EROSION CONTROL PLAN 23-33 STRUCTURES 34 DRAINAGETABULATION OF QUANTITIES 35-36 DRAINAGE DETAILS 37 DRAINAGE STORM SEWER PLAN AND PROFILE 38-39 GRADING PLAN 40 GRADING POINTS TABLE 41 TABULATION OF TRAFFIC CONTROL QUANITITES 42 TRAFFIC CONTROL PLAN 43 PEDESTRAIN TRAFFIC CONTROL PLAN The Contract Drawings shall be stamped "Final for Construction" and dated. Any revisions made shall be clearly identified and dated. 7.4. Addenda Numbers to , inclusive. 7.5. The Contract Documents also include all written amendments and other documents amending, modifying, or supplementing the Contract Documents pursuant to paragraphs 3.5 and 3.6 of the General Conditions. 7.6. There are no Contract Documents other than those listed or incorporated by reference in this Article 7. The Contract Documents may only be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of the General Conditions. ARTICLE 8. MISCELLANEOUS 8.1. Terms used in this Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but not without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge that assignor from any duty or responsibility under the Contract Document. 8.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect to all covenants, Agreement and obligations contained in the Contract Document. OWNER: CITY OF FORT COLLINS CONTRACTOR: [CONTRACTOR] By: By: DARIN ATTEBERRY, CITY MANAGER By: GERRY S. PAUL PRINTED DIRECTOR OF PURCHASING AND RISK MANAGEMENT Title: Title: Date: Date: Attest: (CORPORATE SEAL) City Clerk Address for giving notices: P. O. Box 580 Fort Collins, CO 80522 Attest: Approved as to Form Address for giving notices: Assistant City Attorney License No.: SECTION 00530 NOTICE TO PROCEED Description of Work: 8038 Arthur Ditch Wood Street Bridge Replacement To: [Contractor] This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Agreement. Dated this day of , 20 . The dates for Substantial Completion and Final Acceptance shall be , 20_ and , 20__, respectively. City of Fort Collins OWNER By: Title: ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 20__. CONTRACTOR: [Contractor] By: Title: SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (firm) (address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the [Day] day of [Month], 20[Year], a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins Project, 8038 Arthur Ditch Wood Street Bridge Replacement. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of _____ ____, 20__. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (firm) (address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated the [Day] day of [Month], 20[Year], a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins Project, 8038 Arthur Ditch Wood Street Bridge Replacement. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this day of , 20__. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By:_____________________________________ _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance in accordance with the following requirements: 1. The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Contractor 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Contractor shall maintain during the life of this Agreement for all of the Contractor's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Contractor shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: 8038 Arthur Ditch Wood Street Bridge Replacement PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado INCLUDE: OWNER: City of Fort Collins CONTRACTOR: [Contractor] CONTRACT DATE: [Date] The Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. ENGINEER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 20__ TO: [Contractor] Gentlemen: You are hereby notified that on the day of , 20__, the City of Fort Collins, Colorado, has accepted the Work completed by [Contractor] for the City of Fort Collins project, 8038 Arthur Ditch Wood Street Bridge Replacement. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated [Contract Date]. In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date:____________ _, 20__. Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: Title: SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: [Contractor] (CONTRACTOR) PROJECT: 8038 Arthur Ditch Wood Street Bridge Replacement 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 20__. CONTRACTOR: [CONTRACTOR] By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of 20__, by . Witness my hand and official seal. Notary Public My Commission Expires: SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: [Contractor] PROJECT: 8038 Arthur Ditch Wood Street Bridge Replacement CONTRACT DATE: [Date] In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for . (Surety) on bond of hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , 20____ . (Surety Company) By: ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor’s Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor’s name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. SECTION 00700 GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications) and other provisions of the Contract Documents as indicated below. SC-5.4.8 Limits of Liability A. Add the following language at the end of paragraph 5.4.8. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000/$100,000/$500,000 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. 5.4.6 The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). 5.4.9 This policy will include completed operations coverage/product liability coverage with limits of $1,000,000 combined single limits (CSL). SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Contract Change Order 00960 Application for Payment SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: 8038 Arthur Ditch Wood Street Bridge Replacement CONTRACTOR: [Contractor] PROJECT NUMBER: [Project #] DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGNINAL CONTRACT % ADJUSTED CONTRACT COST $ .00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Contractor Engineer Project File Architect Purchasing Section 00960 APPLICATION FOR PAYMENT PAGE 1 OF 4 OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: ENGINEER: CONTRACTOR: PERIOD ENDING: PROJECT NUMBER: CHANGE ORDERS Application is made for Payment as shown below in connection with Contract NUMBER DATE AMOUNT The present status of the account for this Contract is as follows: 1 2 Original Contract Amount: 3 Net Change by Change Order: Current contract Amount: $0.00 Total Completed and Stored to Date: Less Previous Applications: Amount Due this Application - Before Retainage: $0.00 Less Retainage: Net Change by Change Order $0.00 AMOUNT DUE THIS APPLICATION: $0.00 CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract. The above Amount Due This Application is requested by the CONTRACTOR. Date: By: Payment of the above Amount Due This Application is recommended by the ENGINEER. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Payment of the above Amount Due This Application is approved by the OWNER. Date: By: CONTRACT AMOUNTS APPLICATION FOR PAYMENT PAGE 2 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 CHANGE ORDERS APPLICATION FOR PAYMENT PAGE 3 OF 4 Work Completed Work Completed Work Completed Stored Bid This Month Previous Periods To Date Materials Total Item This Earned Percent Number Description Quantity Units Unit Price Amount Qty. Amount Qty. Amount Qty. Amount Period To Date Billed $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS CHANGE ORDERS $0.00 $0.00 $0.00 $0.00 $0.00 PROJECT TOTALS $0.00 $0.00 $0.00 $0.00 $0.00 STORED MATERIALS SUMMARY PAGE 4 OF 4 On Hand Received Installed On Hand Item Invoice Previous This This This Number Number Description Application Period Period Application $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS $0.00 $0.00 $0.00 $0.00 PROJECT AND STANDARD SPECIAL PROVISIONS Arthur Ditch at Sycamore Street & Wood Street CBC Replacement Bid No. 8038 Prepared for: 281 North College Avenue Fort Collins, CO 80522-0580 (970) 221-6605 Prepared by: Michael Baker, Jr., Inc. 165 S. Union Boulevard, Suite 200 Lakewood, CO 80228 November, 2014 Arthur Ditch CBC Replacement November 2014 Special Provisions CITY OF FORT COLLINS ARTHUR DITCH CBC REPLACEMENT The Colorado Department of Transportation’s 2011 Standard Specifications for Road and Bridge Construction controls construction of this project. The following special provisions supplement or modify the Standard Specifications and take precedence over the Standard Specifications and plans. PROJECT SPECIAL PROVISIONS Item Page Project Special Provisions ...................................................................................................................................... i Standard Specal Provisions ................................................................................................................................... ii Notice To Bidders ...................................................................................................................................................1 Commencement and Completion of Work .............................................................................................................2 Revision of Section 101 Definition of Terms ........................................................................................................3 Revision of Section 102 Project Plans and Other Data ..........................................................................................4 Revision of Section 105 Dispute Resolution ..........................................................................................................5 Revision of Section 105 Claims for Contract Adjustment .....................................................................................6 Revision of Section 106 Conformity to the Contract of Hot Mix Ashpalt .............................................................7 Revision of Section 107 Insurance .........................................................................................................................8 Revision of Section 107 Performance of Safety Critical Work ..............................................................................9 Revision of Section 107 Interruption of Irrigation Water Flow ...........................................................................11 Revision of Section 107 Protection of Existing Vegetation .................................................................................12 Revision of Section 108 Specialty Items ..............................................................................................................13 Revision of Section 108 Prosecution and Progress ..............................................................................................14 Revision of Section 201 Clearing and Grubbing ..................................................................................................20 Revision of Section 202 Removal of Structures and Obstructions Removal of Asphalt Mat ..............................21 Revision of Section 202 Removal of Structures and Obstructions Removal of Portions of Present Structure ....22 Revision of Section 202 Removal of Structures and Obstructions Removal of Fence ........................................24 Revision of Section 208 Erosion Conrol ..............................................................................................................25 Revision of Section 210 Reset Structures .............................................................................................................26 Revision of Section 212 Tree Retention and Protection .......................................................................................27 Revision of Section 216 Soil Retention Covering ................................................................................................32 Revision of Section 304 Aggregate Base Course .................................................................................................33 Revision of Section 304 1 ½” Clean Wash Rock .................................................................................................34 Revision of Section 403 Hot Mix Asphalt ............................................................................................................35 Revision of Section 506 Riprap (12 IInch) ...........................................................................................................38 Revision of Section 603 16 Inch Plastic Pipe (Special) .......................................................................................39 Revision of Section 604 Manhole Ring and Cover ..............................................................................................40 Revision of Section 607 Fence (Temporary) (Chain Link) ..................................................................................41 Revision of Section 607 Fence Chain Link (Special) ...........................................................................................42 Revision of Section 608 Sidewalks and Bikeways ...............................................................................................43 Revision of Section 608 Curb Ramp (Special) .....................................................................................................44 Revision of Section 609 Curb and Gutter Type 2 (Special) .................................................................................47 Revision of Section 616 Trash Guard (Special) ...................................................................................................48 Revision of Section 630 Construction Zone Traffic Control ................................................................................49 Force Account Items .............................................................................................................................................50 i Arthur Ditch CBC Replacement November 2014 Special Provisions CITY OF FORT COLLINS ARTHUR DITCH REPLACEMENT STANDARD SPECAL PROVISIONS Date No. of Pages Revision of Section 103 – Colorado Resident Bid Preference (Feb. 3, 2011) 2 Revision of Section 105 – Disputes and Claims for Contract (Nov. 6, 2014) 31 Adjustments Revision of Section 105 – Hot Mix Asphalt Pavement Smoothness (May 8, 2014) 7 Revision of Section 105 – Portland Cement Concrete Pavement (May 8, 2014) 2 Smoothness Revision of Section 105 – Violation of Working Time Limitation (February 3, 2011) 2 Revision of Sections 105 and 106 – Conformity to the Contract of (February 3, 2011) 7 Hot Mix Asphalt (Less than 5000 Tons) Revision of Section 106 – Certificates of Compliance and (Feb. 3, 2011) 1 Certified Test Reports Revision of Section 106 – Material Sources (Oct. 31, 2013) 1 Revision of Section 106 – Supplier List (Jan. 30, 2014) 1 Revision of Section 107 – Responsibility for Damage (Feb. 3, 2011) 1 Claims, Insurance Types and Coverage Limits Revision of Section 107 – Warning Lights for Work Vehicles and (Jan. 30, 2014) 1 Equipment Revision of Sections 107 and 208 – Water Quality Control, Under (May 2, 2013) 3 One Acre of Disturbance Revision of Section 108 – Liquidated Damages (May 2, 2013) 1 Revision of Section 108 – Notice to Proceed (July 31, 2014) 1 Revision of Section 108 – Project Schedule (July 31, 2014) 6 Revision of Section 108 – Subletting of Contract (Jan. 31, 2013) 1 Revision of Section 108 – Payment Schedule (Single Construction Year) (October 31, 2013) 1 Revision of Section 109 – Asphalt Cement Cost Adjustment (April 5, 2013) 2 (Asphalt Cement Included in the Work) Revision of Section 109 - Compensation for Compensable Delays (May 5, 2011) 1 Revision of Section 109 – Fuel Cost Adjustment (Feb. 3, 2011) 2 Revision of Section 109 – Measurement of Quantities (Feb. 3, 2011) 1 Revision of Section 109 – Measurement of Water (Jan. 6, 2012) 1 Revision of Section 109 – Prompt Payment (Jan. 31, 2013) 1 Revision of Section 203 – Imported Material for Embankment (Feb. 3, 2011) 2 Revision of Sections 203, 206, 304 and 613 – Compaction (July 19, 2012) 2 Revision of Section 206 – Imported Material for Structure Backfill (July 19, 2012) 2 Revision of Section 206 – Structure Backfill (Flow-Fill) (April 26, 2012) 2 Revision of Section 206 – Structure Backfill at Bridge Abutments (Jan. 30, 2014) 1 Revision of Sections 206 and 601 – Backfilling Structures that Support (July 29, 2011) 1 Lateral Earth Pressures Revision of Section 208 – Aggregate Bag (Jan. 31, 2013) 1 Revision of Section 208 – Erosion Log (Jan. 31, 2013) 1 Revision of Section 216 – Soil Retention Covering (Jan. 30, 2014) 6 Revision of Section 250 – Environmental, Health and Safety (July 19, 2012) 1 Management Revision of Section 401 – Compaction of Hot Mix Asphalt (April 26, 2012) 1 ii Arthur Ditch CBC Replacement November 2014 Special Provisions Revision of Section 401 – Compaction Pavement Test Section (CTS) (July 19, 2012) 1 Revision of Section 401 – Composition of Mixtures – Voids Acceptance (Feb. 3, 2011) 1 Revision of Section 401 – Plant Mix Pavements (February 3, 2011) 1 Revision of Section 401 – Temperature Segregation (Feb. 3, 2011) 1 Revision of Section 401 – Tolerances for Hot Mix Asphalt (January 6, 2012) 1 (Voids Acceptance) Revision of Sections 412 – Portland Cement Concrete Pavement (February 3, 2011) 1 Finishing Revision of Sections 412, 601, and 711 - Liquid Membrane-Forming (May 5, 2011) 1 Compounds for Curing Concrete Revision of Sections 507, 601 and 606 – Macro Fiber-Reinforced (May 2, 2013) 1 Concrete Revision of Section 601 – Concrete Batching (Feb. 3, 2011) 1 Revision of Section 601 – Concrete Finishing (Feb. 3, 2011) 1 Revision of Section 601 – Concrete Form and Falsework Removal (July 28, 2011) 2 Revision of Section 601 – Concrete Slump Acceptance (July 29, 2011) 1 Revision of Section 601 – Depositing Concrete Under Water (May 2, 2013) 1 Revision of Section 601 – Fiber-Reinforced Concrete (May 2, 2013) 1 Revision of Section 601 – QC Testing Requirements for Structural (May 8, 2014) 1 Concrete Revision of Section 624 – Culvert and Sewer Pipe (Feb. 3, 2011) 1 Revision of Section 630 – Construction Zone Traffic Control (Feb. 17, 2012) 1 Revision of Section 630 – Retroreflective Sign Sheeting (May 8, 2014) 1 Revision of Section 630 – Signs and Barricades (Jan. 31, 2013) 1 Revision of Sections 702 – Hot Poured Joint and Crack Sealant (Sept. 29, 2011) 1 Revision of Section 703 - Aggregate for Bases (Without RAP) (Oct. 31, 2013) 1 Revision of Section 703 – Aggregate for Hot Mix Asphalt (Nov. 1, 2012) 2 Revision of Section 703 –Concrete Aggregate (July 28, 2011) 1 Revision of Section 712 – Geotextiles (Nov. 1, 2012) 2 Revision of Section 712– Water for Mixing or Curing Concrete (Feb. 3, 2011) 1 Affirmative Action Requirements – Equal Employment Opportunity (Feb. 3, 2011) 10 iii Arthur Ditch CBC Replacement November 2014 Special Provisions NOTICE TO BIDDERS It is recommended that bidders on this project review the work site and plan details with an authorized City representative. Prospective bidders shall contact one of the following listed authorized City representatives at least 12 hours in advance of the time they wish to review the project. Project Manager: Mark Laken Phone: (970) 222-3546 Engineering Department Fax: (970) 221-6378 City of Fort Collins email: mlaken@fcgov.com 281 North College Avenue Fort Collins, CO 80522-0580 Senior Buyer: John Stephen Phone: (970) 221-6777 Purchasing Department Fax: (970) 221-6707 City of Fort Collins email: jstephen@fcgov.com The above referenced individuals are the only representatives of the City with authority to provide any information, clarification or interpretation regarding the plans, specifications, and any other contract documents or requirements. Where reference is made in the plans and specifications to Owner, Department, Chief Engineer, Resident Engineer, Project Engineer, Engineer, and Inspection and Testing Agency it is understood to mean the City of Fort Collins, Colorado, representative. 1 Arthur Ditch CBC Replacement November 2014 Special Provisions COMMENCEMENT AND COMPLETION OF WORK The Contractor shall commence work under the Contract by the City in the “Notice to Proceed”. The Contractor shall have 90 calendar days from the “Notice to Proceed” for substantial completion of all tasks. The Contractor shall have 14 calendar days from substantial completion for final completion, including all punch list items and demobilization. Liquidated damages are $1,800 per day for work not completed by the date set for substantial completion and work that may impede the flow of water (April 15th) in Arthur Ditch. Liquidated damages are $1,800 per day for final completion. Section 108 of the Standard Specifications is hereby revised for this project as follows: Subsection 108.03 shall include the following: Salient features to be shown on the Contractor's Bar Chart Progress Schedule are: • Mobilization • Detour • Removals • Roadway Earthwork • Structure Construction • Curb, Gutter and Sidewalk • Hot Mix Asphalt Pavement • Seeding and Landscaping 2 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 101 DEFINITION OF TERMS Technical Specifications related to construction materials and methods for the Work embraced under this Contract shall consist of the “Colorado Department of Transportation, Standard Specifications for Road and Bridge Construction” dated 2011, along with the Larimer County Urban Area Street Standards and the City of Fort Collins Utility Standards. If there is a conflict apparent between the two, the more stringent specification shall be used. Certain terms utilized in the Specifications referred to in the paragraph above shall be interpreted to have different meanings within the scope of the Contract. A summary of redefinitions follows: a. 101.28 Department. City of Fort Collins Engineering Department, Colorado b. 101.29 Engineer. The Construction Engineer for the City of Fort Collins, Colorado, or designated representative. c. 101.39 Laboratory. City of Fort Collins, Colorado, or their designated representative. d. 101.51 Project Engineer. The Project Manager, City of Fort Collins, Colorado or designated representative. e. 101.76 State. City of Fort Collins, Colorado (where applicable) 3 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 102 PROJECT PLANS AND OTHER DATA Section 102 of the Standard Specifications is hereby revised for this project as follows: Subsection 102.05 shall include the following: Contract documents and supporting information will be available for review until the date set for opening of bids at the following locations: 1. Online at the City of Fort Collins Webpage: www.fcgov.com/eprocurement 2. City of Fort Collins Purchasing Department, 215 N Mason Street, 2nd Floor, Fort Collins, Colorado, 80524 After the proposal have been opened, the low responsible bidder may obtain from the City, at no cost: 2 sets of 11 x 17 plans and special provisions; and if available for the project, one set of full-size cross sections, one set of full-size major structure plan sheets, and one set of compute output data. If the low bidder has not picked up the plans and other available data by 4:30 pm on the second Friday after bid opening, they will be sent to the Project Engineer in charge of the project. Additional sets of plans and other available data may be purchased on a cash sale basis from the City at current reproduction prices. Subcontractors and suppliers may obtain plans and other data from the successful bidder or they may purchase copies on cash sale basis from the City at current reproduction prices. 4 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 105 DISPUTE RESOLUTION Section 105 of the Standard Specifications is hereby revised for this project as follows: Subsection 105.22 shall be revised as follows: The Colorado Department of Transportation will not participate in the resolution process for any claims filed by the Contractor. 5 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 105 CLAIMS FOR CONTRACT ADJUSTMENT Section 105 of the Standard Specifications is hereby revised for this project as follows: Subsection 105.22 shall be revised as follows: The Colorado Department of Transportation will not participate in the resolution process for any claims filed by the Contractor. 6 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 106 CONFORMITY TO THE CONTRACT OF HOT MIX ASHPALT Section 106 of the Standard Special Provisions is hereby revised for this project as follows: Subsection 106.05 shall include the following: For this project, Contractor process control testing of hot mix asphalt is voluntary. 7 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 107 INSURANCE Section 107.18 is hereby revised to read: For this project all insurance certificates shall name the City of Fort Collins as an additionally insured party. 8 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 107 PERFORMANCE OF SAFETY CRITICAL WORK Section 107 of the Standard Specifications is hereby revised as follows: Add subsection 107.061 immediately following subsection 107.06 as follows: 107.061 Performance of Safety Critical Work. The following work elements are considered safety critical work for this project: (1) Removal of the Arthur Ditch concrete box culverts at Wood and Sycamore Streets. (2) Temporary works: falsework, shoring that exceeds 5 feet in height, cofferdams, and temporary bridges (3) Work requiring the use of cranes or other heavy lifting equipment to set structures. Also when construction materials are being lifted that may fall onto active traffic lanes. (4) Excavation and embankment adjacent to the roadway, especially if it requires shoring. (5) Work operations such as pile driving and jack hammering which may create vibration and cause debris to fall into traffic. The Contractor shall submit, for record purposes only, an initial detailed construction plan that addresses safe construction of each of the safety critical elements. When the specifications already require an erection plan, a structure removal plan, or a removal of portion of structure plan, it shall be included as a part of this plan. The detailed construction plan shall be submitted two weeks prior to the safety critical element conference described below. The construction plan shall be stamped “Approved for Construction” and signed by the Contractor. The construction plan will not be approved by the Engineer. The Construction Plan shall include the following: (1) Safety Critical Element for which the plan is being prepared and submitted. (2) Contractor or subcontractor responsible for the plan preparation and the work. (3) Schedule, procedures, equipment, and sequence of operations, that comply with the working hour limitations (4) Temporary works required: falsework, bracing, shoring, etc. (5) Additional actions that will be taken to ensure that the work will be performed safely. (6) Names and qualifications of workers who will be in responsible charge of the work: A. Years of experience performing similar work B. Training taken in performing similar work C. Certifications earned in performing similar work (7) Names and qualifications of workers operating cranes or other lifting equipment A. Years of experience performing similar work B. Training taken in performing similar work C. Certifications earned in performing similar work (8) The construction plan shall address how the Contractor will handle contingencies such as: A. Unplanned events (storms, traffic accidents, etc.) B. Structural elements that don’t fit or line up C. Work that cannot be completed in time for the roadway to be reopened to traffic D. Replacement of workers who don’t perform the work safely E. Equipment failure 9 Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 107 PERFORMANCE OF SAFETY CRITICAL WORK F. Other potential difficulties inherent in the type of work being performed (9) Name and qualifications of Contractor’s person designated to determine and notify the Engineer in writing when it is safe to open a route to traffic after it has been closed for safety critical work. (10) Erection plan or structure removal plan when submitted as required elsewhere by the specifications. Plan requirements that overlap with above requirements may be submitted only once. A safety critical element conference shall be held two weeks prior to beginning construction on each safety critical element. The Engineer, the Contractor, the safety critical element subcontractors, and the Contractor’s Engineer shall attend the conference. Required pre-erection conferences or bridge removal conferences may be included as a part of this conference. After the safety critical element conference, and prior to beginning work on the safety critical element, the Contractor shall submit a final construction plan to the Engineer for record purposes only. The Contractor’s Engineer shall sign and seal temporary works, such as falsework, shoring etc., related to construction plans for the safety critical elements, (1) Removal of Bridge and (2) Temporary Works. The final construction plan shall be stamped “Approved for Construction” and signed by the Contractor. The Contractor shall perform safety critical work only when the Engineer is on the project site. The Contractor’s Engineer shall be on site to inspect and provide written approval of safety critical work for which he provided signed and sealed construction details. Unless otherwise directed or approved, the Contractor’s Engineer need not be on site during the actual performance of safety critical work, but shall be present to conduct inspection for written approval of the safety critical work. When ordered by the Engineer, the Contractor shall immediately stop safety critical work that is being performed in an unsafe manner or will result in an unsafe situation for the traveling public. Prior to stopping work, the Contractor shall make the situation safe for work stoppage. The Contractor shall submit an acceptable plan to correct the unsafe process before the Engineer will authorize resumption of the work. When ordered by the Engineer, the Contractor shall remove workers from the project that are performing the safety critical work in a manner that creates an unsafe situation for the public in accordance with subsection 108.05. Should an unplanned event occur or the safety critical operation deviate from the submitted plan, the Contractor shall immediately cease operations on the safety critical element, except for performing any work necessary to ensure worksite safety, and provide proper protection of the work and the traveling public. If the Contractor intends to modify the submitted plan, he shall submit a revised plan to the Engineer prior to resuming operations. All costs associated with the preparation and implementation of each safety critical element construction plan will not be measured and paid for separately, but shall be included in the work. Nothing in the section shall be construed to relieve the Contractor from ultimate liability for unsafe or negligent acts or to be a waiver of the Colorado Governmental Immunity Act on behalf of the Department. 10 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 107 INTERRUPTION OF IRRIGATION WATER FLOW Section 107 Standard Specifications is hereby revised for this project as follows: Subsection 107.14 shall include the following: The Contractor’s attention is called to the fact that the Arthur Ditch is within the project limits on which work is required. It is the Contractor’s responsibility to provide continuous flow or make arrangements for flow interruptions as necessary if construction scheduling requires work on these facilities during times of high groundwater flow. Irrigation facilities adjacent to the project normally flow from April to October each year. Therefore, construction activities that affect these facilities should be coordinated accordingly. All work that may impede the flow of water in Arthur Ditch shall be completed by April 15th 2015. Work necessary to comply with these requirements, including temporary ditches or culverts, and/or detour culverts, if necessary, will not be paid for separately, but shall be included in the prices bid for the various bid items that occur on the project. 11 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 107 PROTECTION OF EXISTING VEGETATION Section 107 of the Standard Specifications is hereby revised for this project as follows: Subsection 107.12 shall include the following: A. The Contractor shall save all existing vegetation in this area, except for those trees and shrubs which must be removed to accommodate construction of the project. B. The Contractor shall perform all the work in such a manner that the least environmental damage will result. All questionable areas or items shall be brought to the attention of the Engineer for approval prior to removal or any damaging activity. Trees and/or shrubs that are damaged during construction but could have been saved shall be replaced at the expense of the Contractor. C. The following measures shall be taken to protect existing trees adjacent to the project: 1. Fencing material shall encircle any trees whose outer drip line edge is within 20 feet of any construction activities. The fencing material shall be bright, contrasting color, durable, and a minimum of 4 feet in height. Posts used shall be comparable to metal T-post or heavier weight, and placed to a depth of no less than 2 feet below ground level. Fencing material shall be placed at the drip line or 15 feet from tree trunk, whichever is greater, and maintained in an upright position throughout the duration of construction activities. 2. No material shall be placed or piled within the drip line of existing trees. No heavy objects such as wood pallets, metal railings, etc., shall lean against or come into contact with tree trunks. 3. When root cutting is unavoidable, a clean sharp cut shall be made to avoid shredding or smashing. Exposed roots shall be covered immediately to prevent desiccation. Where roots will be cut in a straight line, such as behind a curb or along a sidewalk, a saw such as a concrete saw with a sharp blade that penetrates 1 foot shall be used on top of the ground prior to excavating so that the roots are not torn or smashed during excavation. 4. Sidewalk and pavement should be contoured sufficiently to avoid cutting surface tree roots. Whenever possible, tree roots should be bridged or floated over with walks. 5. With the approval of the City of Fort Collins representative, if foot traffic or equipment is unavoidable within the drip line, the area within the drip line shall be mulched with wood chips to a depth of six inches prior to construction activity. Six inch mulch depth shall be maintained for the duration of the project, and shall be removed upon completion of the project. D. Measurement and Payment: All work necessary as defined in the specifications to protect the existing trees shall not be paid for separately, but shall be included in the cost of the work. 12 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 108 SPECIALTY ITEMS Section 108 of the Standard Specifications is hereby revised for this project as follows: Subsection 108.01 shall include the following: The following items are designated as "Specialty Items" for this project: Specialty Items (1) 16 Inch Plastic Pipe(Special) (2) Inlet Type 13 Combination (Special) (3) Fence Chain Link (Special) (4) Curb Ramp (Special) (5) Curb and Gutter Type 2 (Special) (6) Trash Guard (Special) 13 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 108 PROSECUTION AND PROGRESS Section 108 of the Standard Specifications is hereby revised as follows: Subsection 108.03 shall include the following: Project Meetings A. Pre-Construction Conference: A Pre-Construction Conference will be held after Notice of Award and before the Notice to Proceed, the date, time and location will be determined after Notice of Award. The conference shall be attended by: 1. Contractor and Contractor’s Superintendent a. Contractor shall designate/introduce Superintendent b. At this time the Superintendent will be expected to show that he has sufficient knowledge of the specifications and plans to orchestrate and coordinate the construction activities for this job. 2. Contractor’s Subcontractors (including the Traffic Control Supervisor and Surveyor) a. Contractor shall designate/introduce Major Subcontractor’s supervisors assigned to the project 3. Engineer 4. Owner 5. Utility Companies a. Utilities will be asked to designate their coordination person, provide utility plans, and their anticipated schedule 6. Others as requested by the Contractor, Owner, or Engineer. Unless previously submitted to the Owner, the Contractor shall bring to the conference a tentative schedule of the construction project, include in the schedule shop drawings and other submittals. Any submittals requiring long lead times and therefore must be expedited shall be submitted at the pre-construction conference, or as soon thereafter as possible. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. The agenda will include: 14 Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 108 PROSECUTION AND PROGRESS 1. Contractor’s tentative Schedule a. The Contractor shall submit a detailed project schedule showing milestones and the critical path for the Arthur Ditch Replacements at Wood and Sycamore Street. This schedule shall be agreed to by both the Owner and Contractor. It shall be made in writing and signed by both parties. 2. Permit applications and submittals, including Dewatering Permit, Erosion and Sediment Control Plan, and Traffic Control Plan 3. Transmittal, review and distribution of Contractor’s submittals 4. Processing applications for payment 5. Maintaining record documents 6. Field decision and change orders 7. Use of premises, office and storage areas, staging area, security, housekeeping, and Owner’s needs 8. Proposed daily construction hours for the Engineer’s approval 9. Designation of access roads and parking 10. Contractor’s assignment of safety and first aid B. Construction Progress Meetings for the Arthur Ditch Replacements at Wood and Sycamore Street: Progress meetings will be conducted weekly or at some other frequency, if approved by the Engineer. These meetings shall be attended by the Owner, the Engineer, the Contractor’s representative and any others invited by these people. The Engineer will conduct the meeting and the Engineer will arrange for keeping the minutes and distributing the minutes to all persons in attendance. The agenda of these project meetings will include construction progress, the status of submittal reviews, and the status of information requests, critical work sequencing, review of strategies for connections into existing facilities, status of field orders and change orders, and any general business. The Contractor will prepare a “two week look ahead” schedule to facilitate coordination of work items. The schedule shall be monitored closely during construction and may be updated by written agreement of the parties as changes occur in the project progress. If the milestones are not met, the Owner may utilize the remedies provided in the General Conditions as well as any other remedy provided by the Contract Documents or provided by law or equity. The Owner may also assess liquidated damages as outlined in Article 3, Section 3.2 of the Agreement. 15 Arthur Ditch CBC Replacement November 2014 Special Provisions -3- REVISION OF SECTION 108 PROSECUTION AND PROGRESS The Engineer or Engineer’s Field Representative and Contractor shall agree to weekly quantities at the progress meetings. The weekly quantity sheets shall be signed by both parties. These quantity sheets, when signed, shall be final and shall be the basis for the monthly progress estimates. This process ensures accurate monthly project pay estimates. C. The Engineer may hold coordination conferences, to be attended by all parties involved, when the Contractor’s operations affect, or are affected by, the work of others. 1. Contractor shall participate in such conferences accompanied by Subcontractors as required by the Engineer. Construction Schedules A. The Contractor shall prepare a detailed schedule of all construction operations and procurement after review of tentative schedule by parties attending the pre-construction conference. This schedule will show how the Contractor intends to meet the milestones set forth. 1. No work is to begin at the site until Owner’s acceptance of the Construction Progress Schedule and Report of delivery of equipment and materials. 2. The project is to have 90 calendar days for substantial completion of all items. 3. Any work thereafter substantial completion to be assessed $1,800 per calendar day. 4. The project is to have 14 calendar days for final completion of all punch list and demobilization off site. 5. Any work thereafter final completion to be assessed $1,800 per calendar day. 6. All work which impacts the ditch’s ability to convey water must be complete by April 15, 2015. B. Format and Submissions 1. Prepare construction and procure schedules in a graphic format suitable for displaying scheduled and actual progress. 2. Submit two copies of each schedule to Owner for review. a) Owner will return one copy to contractor with revisions suggested or necessary for coordination of the Work with the needs of Owner or others. b) The Contractor will be required to submit a weekly progress schedule showing work to be completed, labor, equipment, work hours and methods of construction for the upcoming week. This schedule will be required every Thursday in a daily calendar format. 3. The schedule must show how the street, underground utilities, concrete, and paving work will be coordinated. 16 Arthur Ditch CBC Replacement November 2014 Special Provisions -4- REVISION OF SECTION 108 PROSECUTION AND PROGRESS C. Content 1. Construction Progress Schedule a) Show the complete work sequence of construction by activity and location. b) Show changes to traffic control c) Show project milestones 2. Equipment, Materials and Submittals Schedule a) Show delivery status of critical and major items of equipment and materials b) Include a critical path schedule for Shop Drawings, tests, and other submittal requirements for equipment and materials. D. Owner’s Responsibility 1. Owner’s review is only for the purpose of checking conformity with the Contract Documents and assisting the Contractor in coordinating the Work with the needs of the Project. 2. It is not to be construed as relieving contractor from any responsibility to determine the means, methods, techniques, sequences and procedures of construction. Modifications to Time of Completion in the Approved Schedule The date of beginning and the time for completion of the work are essential conditions of the Contract Documents and the work embraced shall be commenced on a date specified in the Notice to Proceed. The Contractor will proceed with the work at such rate of progress to ensure full completion within the contract time. It is expressly understood and agreed, by and between the Contractor and the Owner that the contract time for the completion of the work described herein is a reasonable time, taking into consideration the climatic and other factors prevailing in the locality of the work. Every effort shall be made by the Contractor to complete the project within the "Contract Time" shown in the proposal. The "Contract Time" anticipates "Normal" weather and climate conditions in and around the vicinity of the Project site during the times of year that the construction will be carried out. Extensions of time based upon weather conditions shall be granted only if the Contractor demonstrates clearly that such conditions were "unusually severe," would not have been reasonably anticipated, and that such conditions adversely affected the Contractor’s work and thus required additional time to complete the work. The following specifies the procedure for the determination of time extensions for unusually severe weather. The listing below defines the anticipated number of calendar days lost to adverse weather for each month and is based upon National Oceanic and Atmospheric Administration (NOAA) or similar data for the geographic location of the project. 17 Arthur Ditch CBC Replacement November 2014 Special Provisions -5- REVISION OF SECTION 108 PROSECUTION AND PROGRESS Monthly Anticipated Calendar Days Lost to Adverse Weather Conditions JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC (4) (4) (4) (4) (6) (3) (4) (2) (3) (3) (2) (5) The above schedule of anticipated adverse weather will constitute the base line for monthly (or portion thereof) weather time evaluations. Upon acknowledgment of the Notice to Proceed and continuing throughout the contract on a monthly basis, actual adverse weather days and the impact of adverse weather days that delay the work will be recorded on a day-to-day basis. It is assumed that the work will be carried out Mondays through Fridays (holidays accepted) unless an approved construction schedule or written authorization from the Owner indicates otherwise. The number of days of delayed work due to adverse weather or the impact thereof will then be compared to the monthly adverse weather schedule above. An actual adverse weather day must prevent work for 50 percent or more of the Contractor’s workday, delay work critical to the timely completion of the project, and be documented by the Contractor. The City Representative observing the construction shall determine on a daily basis whether or not work can proceed or if work is delayed due to adverse weather or the effects thereof. The Contractor shall notify the Engineer in writing of any disagreement as to whether or not work can proceed on a given date, within 2 calendar days of that date. The Owner will use the above written notification in determining the number of working days for which work was delayed during each month. At the end of each month, if the number of working days for which work was delayed due to adverse weather exceeds that shown in the above schedule, a Change Order will be executed which increases the Contract Time. The number of work days delayed due to adverse weather or the impact thereof will then be converted to Calendar Days based on the contract completion day and date. This conversion assumes a 5-day work week, Mondays through Fridays, holidays excepted; should the Contractor have authorization to work weekends and/or holidays, and then the method of conversion of workdays to calendar days would take this into consideration. The contract time period will then be increased by the number of calendar days calculated above and a new contract completion day and date will be set. The Contractor’s schedule must reflect the above-anticipated adverse weather delays on all weather-dependent activities. While extensions of time shall be granted for "unusually severe" weather or climate conditions, the Owner shall make no monetary compensation for any costs to the Contractor arising out of such delays. The Contractor shall comply with the portions of the Contract Documents relating to his project schedule and amendments thereto which result from the "unusually severe" weather condition. Breakdowns in equipment or lack of performance by the Contractor will not be considered justification for an extension of time. Liquidated damages will be assessed as delineated elsewhere. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due to the following, and the Contractor has promptly given written notice of such delay to the Owner or Engineer. -6- 18 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 108 PROSECUTION AND PROGRESS 1. To any preference, priority, or allocation order duly issued by the Owner. 2. To unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including but not restricted to, acts of God, or of the public enemy, acts of the Owner, acts of another Contractor in the performance of a contract with the Owner, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather as provided above. 3. To any delays of Subcontractors occasioned by any of the causes specified in paragraphs 1 and 2, above. Subsection 108.05 shall include the following: The contractor shall schedule all work between 7:00 A.M. and 6:00 P.M. Monday through Friday. Disruption of traffic with flagged roadway closures on streets adjacent to Wood or Sycamore Street shall not take place before 8:30 A.M. or between 3:30 P.M. and 6:00 P.M. Night and weekend work will be allowed only with the prior written authorization of the Engineer, and after the contractor submits and receives approval for a noise variance from the City’s Environmental Enforcement Division. Written requests to be submitted minimum of (5) working days prior to the request date. The Contractor may make emergency repairs to provide protection of the work and traveling public at any time. All on-roadway work or work that indirectly or directly interferes with the flow of traffic shall be in accordance with an approved Traffic Control Plan. Unless waived by the Engineer, failure to meet these milestones will require assessment of liquidated damages for each milestone listed above and in accordance with Subsection 108.08. Meetings will be required to review progress and to plan upcoming activities. Representatives from the Contractor and all active subcontractors shall attend the meetings. Such meetings will be required on a weekly basis at a time to be determined by the City of Fort Collins and the Contractor. Additional meetings will be held when required by the City of Fort Collins or the Contractor. The Contractor shall submit at the weekly progress meeting a written statement of planned work activities and anticipated inspection, testing, and surveying requirements of the upcoming week. A 24 hour notice shall be provided to the City of Fort Collins by the Contractor if the Contractor elects to change the planned work activities. 19 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 201 CLEARING AND GRUBBING Section 201 of the Standard Specifications is hereby revised for this project as follows: In Subsection 201.02 delete the second paragraph and replace with the following: The Contractor will establish construction limits in accordance with City requirements. Clearing and grubbing shall be within the limits of the project, as directed by the Engineer. In Subsection 201.02 delete the sixth paragraph and replace with the following: No material or debris shall be disposed of within the project limits. Removal of waste materials and unsuitable or excess topsoil shall be legally disposed of. The Contractor shall make all arrangements to obtain written permission from property owners for disposal locations outside the limits of the project. Copies of this written agreement shall be furnished to the Engineer before the disposal area is used. Subsection 201.02 shall include the following: Buried perishable objects shall be removed to a depth of 3 feet below the existing ground or subgrade, whichever is lower. 20 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVAL OF ASPHALT MAT Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work includes removal and disposal of existing asphalt mat within the project limits as shown on the plans or at locations directed by the City Engineer. In subsection 202.02 delete the seventh paragraph and replace with the following: The existing asphalt mat shall be removed in a manner that minimizes contamination of the removed mat with underlying material. The removed mat shall become the property of the Contractor and shall be legally disposed of offsite. Subsection 202.02 shall include the following: All required traffic control devices and signs shall be in place, with detours in operation, prior to the beginning of removal operations each day. Night work is not permitted. During removal of the existing asphalt mat, the Contractor shall survey the existing pavement thickness and condition with the City Engineer to determine the required depth of removal and confirm the proposed full depth pavement section. No tracked vehicles shall be permitted on streets unless approved by the City Engineer. The Contractor shall at all times take proper precautions and be responsible for the protection of existing street surfaces not designated for removal. Any damage, even superficial, to the existing asphalt surface to remain shall be repaired at the expense of the Contractor, including but not limited to gouges, scrapes, outrigger marks, and backhoe bucket marks, etc. A slurry seal type covering will be considered the minimum repair. Patching may be required, at the discretion of the City Engineer. Subsection 202.11 shall include the following: Removal of asphalt mat will be measured in square yards of pavement removed, regardless of depth. The cutting of asphalt mat to a neat line where removal of asphalt mat will abut new pavement will not be paid for separately but shall be included in the work. The contractor shall perform necessary investigations required to determine the thickness of existing asphalt pavements designated for removal. These investigations will not be paid for separately, but shall be included in the work. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Asphalt Mat Square Yard 21 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVAL OF PORTIONS OF PRESENT STRUCTURE Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work consists of removing a portion of the existing concrete box culvert at Wood Street and Sycamore Street that conveys the Arthur Ditch, as detailed in the plans. The work shall include the complete removal of all structural elements up to the proposed connection to the remaining box culvert, including but not limited to the headwall, wing walls and the manhole located on top of the box culvert. In subsection 202.02 delete the seventh paragraph and replace with the following: All materials removed from the existing structure shall become the property of the Contractor and shall be legally disposed of offsite at the Contractor’s expense. Subsection 202.02 shall include the following: The removal of the existing box culvert shall be performed in a safe manner and in coordination with all affected agencies, including the Arthur Ditch Company, City departments, and other affected agencies. All required traffic control devices and signs shall be in place, with detours in operation, prior to the beginning of removal operations each day. All work shall conform to the requirements of the MUTCD. The Contractor shall take all steps to avoid contaminating state waters, in accordance with subsection 107.25. All obstructions or work that may impeded the flow of the ditch must be completed by April 15th, 2015 Subsection 202.03 shall include the following: Salvageable material shall be handled in locations designated by the City Engineer. 22 Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVAL OF PORTIONS OF PRESENT STRUCTURE Subsection 202.02 the fourth paragraph shall include the following: Explosives shall not be used for removal work without the written approval of the City Engineer. Portions of the existing structure, facilities, and surrounding roadways to remain shall not be damaged by the removal operations. Damage that does occur shall be repaired by, and at the expense of, the Contractor. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Portions of Present Structure Lump Sum Payment for Removal of Portions of Present Structure will be full compensation for all labor and materials required to complete the work, including, preparation and implementation of the Concrete Box Culvert Removal Plan, inspection, equipment, debris handling and disposal, salvaging, handling and storage of salvable materials, handling and disposal of all hazardous materials and disposal of non-salvable materials. In accordance with Section 108.04 (f) of these specifications, lighting required for nighttime operations will not be measured and paid for separately, but shall be included in the work. 23 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 202 REMOVAL OF STRUCTURES AND OBSTRUCTIONS REMOVAL OF FENCE Section 202 of the Standard Specifications is hereby revised for this project as follows: Subsection 202.01 shall include the following: This work shall include the removal of fence at the west end of the concrete box culvert as shown on the Removal and Roadway Plans. The chain link fence shall be removed, along with all posts, hardware and concrete. The gate shall be removed and protected during construction for reuse with proposed alignment. Care shall be taken when removing the fence to avoid damaging the remaining fencing and posts. Subsection 202.11 shall include the following: Removal of Fence will be measured in linear feet, completed and accepted. Subsection 202.12 shall include the following: Payment will be made under: Pay Item Pay Unit Removal of Fence Linear Foot 24 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 208 EROSION CONROL Section 208 of the Standard Specifications is hereby revised for this project as follows: In subsection 208.11 delete the fourth paragraph and replace with the following: Storm Drain Inlet Protection will be measured by the actual number installed and accepted. In subsection 208.11 delete the seventh paragraph and replace with the following: Erosion Control Supervisor work will be measured and paid for in accordance with Subsection 208.12. The Contractor shall record the tasks that were assigned to the Erosion Control Supervisor. The records shall be submitted to the City Engineer, weekly, after completion of the work for approval and acceptance. In subsection 208.11 delete the eighth paragraph (beginning with “Excavation required…”) and replace with the following: Removal and disposal of sediment will not be measured and paid for separately, but shall be included in the work. Subsection 208.11 shall include the following: Sweeping (Sediment Removal) will be measured and paid for in accordance with Subsection 208.12 In subsection 208.12 delete the 12th paragraph and replace with the following: Payment for Sweeping (Sediment Removal) will be full compensation for the removal of sediment from the roadway throughout the duration of the project using a pickup broom or equipment capable of collecting sediment, authorized by the City Engineer. Operator will not be measured and paid for separately, but shall be included in the work. Subsection 208.12 shall include the following: Payment will be made under: Pay Item Pay Unit Storm Drain Inlet Protection (Aggregate Bag) Each Sweeping (Sediment Removal) Lump Sum Aggregate Bag Linear Foot Sweeping (Sediment Removal) Lump Sum Erosion Control Supervisor Lump Sum 25 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 210 RESET STRUCTURES Section 210 of the Standard Specifications is hereby revised for this project as follows: Subsection 210.10 shall include the following: Excavate the pavement around manholes to clear the object by at least 2 feet from the outside edge of the device and 8-inches deep. This area shall be filled with asphalt lifts and compacted to at least 95 percent density as determined by ASTM D 2041-78, D 2726-83, and D 2950-82. Notification, inspection and acceptance shall apply to this method and shall occur prior to the application of the final lift around these appurtenances. At no time shall manholes and valve boxes be covered up or buried. Manholes are to be maintained fully accessible at all times for emergency and maintenance operations. In subsection 210.04 delete the first paragraph and replace with the following: The Contractor shall supply and install all related materials necessary to remove the gate at the Arthur Ditch maintenance access area from its existing location and install the gate in the new location as shown on the Roadway Plan, including all mounting hardware, footings, and posts. In subsection 210.12 delete the third paragraph and replace with the following: Concrete footings for ground signs, if required, will not be measured or paid for separately but shall be included in the work. In subsection 210.12 delete the eighth paragraph and replace with the following: Resetting of structures, fences, and related materials shall include all work necessary to remove the items from their existing location to the new location, and shall include all mounting hardware, footings, and all other work necessary to complete the reset item, including new fence posts. Subsection 210.13 shall include the following: Payment will be made under: Pay Item Pay Unit Reset Gate Each Reset Ground Sign Each Adjust Manhole Each 26 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 212 TREE RETENTION AND PROTECTION Section 212 of the Standard Specifications is hereby revised for this project as follows: Subsection 212.01 shall include the following: Tree Retention and protection includes general protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction. The following definitions apply: 1) Caliper: Diameter of a trunk measured by a diameter tape or the average of the smallest and largest diameters at 6 inches above the ground for trees up to, and including, 4-inch size; and 12 inches above the ground for trees larger than 4-inch size. 2) Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction, and indicated on Drawings. 3) Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction, and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated. 4) Vegetation: Trees, shrubs, groundcovers, grass, and other plants. Subsection 212.02 shall include the following: (d) Protection-Zone Fencing: Fencing fixed in position and meeting the following requirements. Previously used materials may be used when approved by City Engineer. Protection-Zone fencing will be considered incidental to the “Tree Retention and Protection” line item and will not be paid for separately. 1. Plastic Protection-Zone Fencing: Plastic construction fencing constructed of high-density extruded and stretched polyethylene fabric with 2-inch maximum opening in pattern and weighing a minimum of 0.4 lb./ft.; remaining flexible from minus 60 to plus 200 deg F; inert to most chemicals and acids; minimum tensile yield strength of 2000 psi and ultimate tensile strength of 2680 psi; secured with plastic bands or galvanized-steel or stainless-steel wire ties; and supported by tubular or T-shape galvanized-steel posts spaced not more than 8 feet apart. a. Height: 5 feet b. Color: High-visibility orange, nonfading. Add Subsection 212.061 immediately following Subsection 212.06 212.061 Tree Retention and Protection A. SUBMITTALS 1) Samples for Verification: For each type of the following: a. Protection-Zone Fencing: Assembled Samples of manufacturer's standard size made from full-size components. 2) Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities. a. Use sufficiently detailed photographs or videotape. 27 Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 212 TREE RETENTION AND PROTECTION b. Include plans and notations to indicate specific wounds and damage conditions of each tree or other plants designated to remain. B. QUALITY ASSURANCE 1) Preinstallation Conference: Conduct conference at Project site. a. Review methods and procedures related to temporary tree and plant protection including, but not limited to, the following: 1. Construction schedule. Verify availability of materials, personnel, and equipment needed to make progress and avoid delays. 2. Enforcing requirements for protection zones. 3. Field quality control. C. PROJECT CONDITIONS 1) The following practices are prohibited within protection zones: a. Storage of construction materials, debris, or excavated material. b. Parking vehicles or equipment. c. Foot traffic. d. Erection of sheds or structures. e. Impoundment of water. f. Excavation or other digging unless otherwise indicated. g. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated. 2) Do not direct vehicle or equipment exhaust toward protection zones. 3) Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch. D. PREPARATION Locate and clearly identify trees, shrubs, and other vegetation to remain or to be relocated. Tie a 1-inch blue- vinyl tape around each tree trunk at 54 inches above the ground. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations. Within the drip line of any protected existing tree, there shall be no cut or fill over a four-inch depth unless a qualified arborist or forester has evaluated and approved the disturbance. Prior and during construction, barriers shall be erected around all protected existing trees with such barriers to be of orange fencing a minimum of (5) feet in height, secured with metal T-Posts, no closer than six (6) feet from the trunk or at the drip line, whichever is greater. There shall be no storage or movement of equipment, material, debris or fill within the fenced tree protection zone. Modification of protective fence locations to accommodate construction shall be approved by the City Forester prior to moving or erecting a protective fence. Where the drip line of trees touches or overlap, place fence around groups of trees. 28 Arthur Ditch CBC Replacement November 2014 Special Provisions -3- REVISION OF SECTION 212 TREE RETENTION AND PROTECTION During construction there shall be no cleaning of equipment or materials or the storage and disposal of waste material such as paints, oils, solvents, asphalt, concrete, motor oil or any other material harmful to the life of a tree within the drip line of any protected tree or group of trees. No damaging attachments, wires, signs or permits may be fastened to any protected tree. The installation of utilities, irrigation lines or any underground fixture requiring excavation deeper than six (6) inches shall be accomplished by boring under the root system of protected existing trees at a minimum depth of twenty-four (24) inches. The auger distance is established from the face of the tree (outer bark) and is scaled from the tree diameter at breast height as described in the tree protection chart of the Fort Collins Land use Code Section 3.2.1. Construction shall be performed in a manner to not damage any existing tree. Clearance pruning of any tree on site shall only be by a Fort Collins Licensed Arborist under the direction of the City Forester. Equipment access/drives shall be positioned to minimize travel over the root system of any existing tree. Equipment drive locations over the root system of any significant tree shall be approved by the City Forester with requirements to protect the compaction of exposed soil. Prior to construction the contractor shall meet the City Forester on site to verify protected existing trees and the application of tree protection specifications. The Contractor shall wrap protected trees with concrete blankets or equivalent treatment whenever directed by the owner’s representative. E. TREE- AND PLANT-PROTECTION ZONES Protection-Zone Fencing: Install protection-zone fencing along edges of protection zones before materials or equipment are brought on the site and construction operations begin in a manner that will prevent people from easily entering protected. Construct fencing so as not to obstruct safe passage or visibility at vehicle intersections where fencing is located adjacent to pedestrian walkways or in close proximity to street intersections, drives, or other vehicular circulation. Maintain protection zones free of weeds and trash. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Architect. Maintain protection-zone fencing and signage in good condition as acceptable to Architect and remove when construction operations are complete and equipment has been removed from the site. 1) Do not remove protection-zone fencing, even temporarily, to allow deliveries or equipment access through the protection zone. F. EXCAVATION General: Excavate at edge of protection zones and for trenches indicated within protection zones according to requirements in Section 200 Earth Work. 29 Arthur Ditch CBC Replacement November 2014 Special Provisions -3- REVISION OF SECTION 212 TREE RETENTION AND PROTECTION Trenching near Trees: Where utility trenches are required within protection zones, hand excavate under or around tree roots or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning. Redirect roots in backfill areas where possible. If encountering large, main lateral roots, expose roots beyond excavation limits as required to bend and redirect them without breaking. If encountered immediately adjacent to location of new construction and redirection is not practical, cut roots approximately 3 inches back from new construction and as required for root pruning. Do not allow exposed roots to dry out before placing permanent backfill. Provide temporary earth cover or pack with peat moss and wrap with burlap. Water and maintain in a moist condition. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil. G. ROOT PRUNING Prune roots that are affected by temporary and permanent construction. Pruning roots 2” in diameter or greater must be reviewed by City Forester prior to pruning. Prune roots as shown on Drawings and as follows: 1) Cut roots manually by digging a trench and cutting exposed roots with sharp pruning instruments; do not break, tear, chop, or slant the cuts. Do not use a backhoe or other equipment that rips, tears, or pulls roots. 2) Temporarily support and protect roots from damage until they are permanently redirected and covered with soil. 3) Cover exposed roots with burlap and water regularly. 4) Backfill as soon as possible according to requirements in Section 200 Earth Work. Root Pruning at Edge of Protection Zone: Prune roots 12 inches outside of the protection zone, by cleanly cutting all roots impacted to the depth of the required excavation. H. CROWN PRUNING Prune all existing trees retained on City property by cleaning and thinning the canopy. Prune branches that are affected by temporary and permanent construction. Prune branches as shown on the Drawings and as follows: 1) Pruning Standards: Prune trees according to the City of Fort Collins Tree Management Standards I. REGRADING Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone. J. REPAIR AND REPLACEMENT General: Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Architect/Owner’s Rep. 1) Submit details of proposed root cutting and tree and shrub repairs. 30 Arthur Ditch CBC Replacement November 2014 Special Provisions -4- REVISION OF SECTION 212 TREE RETENTION AND PROTECTION 2) Treat damaged trunks, limbs, and roots according to an ISA certified arborist's written instructions. 3) Perform repairs within 24 hours. 4) Replace vegetation that cannot be repaired and restored to full-growth status, as determined by Landscape Architect/Owner’s Rep. Protected trees that are damaged during construction will be appraised by a qualified arborist, and the amount of damage appraised will be billed to the Contractor. Trees: Remove and replace trees indicated to remain that are more than 25 percent dead or in an unhealthy condition before the end of the corrections period or are damaged during construction operations that Landscape Architect/Owner’s Rep determines are incapable of restoring to normal growth pattern. 1) Provide new trees of same size and species as those being replaced for each tree that measures 6 inches or smaller in caliper size. K. DISPOSAL OF SURPLUS AND WASTE MATERIALS Disposal: Remove excess excavated material, displaced trees, trash and debris, and legally dispose of them off Owner's property. Subsection 212.07 shall include the following: Tree retention and protection will not be measured, but will be paid for on a lump sum basis. The lump sum price bid will be full compensation for all work required to complete the item, including installation and maintenance of protection-zone fencing. Subsection 212.08 shall include the following: Payment will be made under: Pay Item Pay Unit Tree Retention and Protection Lump Sum 31 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 216 SOIL RETENTION COVERING Section 216 of the Standard Specifications is hereby revised for this project as follows: Subsection 216.03 (b) shall include the following: Delete the second sentence and replace with the following: The Contractor shall coordinate with the City Engineer 48 hours prior to placement of Soil Retention Blanket (Coconut) and allow the City access to the area to properly prepare, fertilize and seed. 32 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 304 AGGREGATE BASE COURSE Section 304 of the Standard Specifications is hereby revised for this project as follows: Subsection 304.02 shall include the following: Materials for Aggregate Base Course (Class 6) shall be in conformance with subsection 703.03. Aggregate Base Course (Class 6) must meet the gradation requirements and have a resistance value (R-value) of at least 72 when tested by the HVEEM Stabilometer method. (a) Approval of Sources. Only aggregate from City Engineer approved sources shall be used. Approval of sources will, at a minimum, consist of supplying documented gradation, Atterberg limits, and R-value testing on an annual basis. 33 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 304 1 ½” CLEAN WASH ROCK Section 304 of the Standard Specifications is hereby revised for this project as follows: Subsection 304.02 shall include the following: In accordance with Section 703, 100% shall pass the 50mm (2”) sieve size and 0-5% shall pass the 37.5mm (1 ½”) sieve size. In Subsection 304.07 delete first sentence and replace with the following: 1 ½” clean wash rock will be measured by the cubic yard compacted in place. In Subsection 304.08 delete the pay item and replace with the following: Pay Item Pay Unit 1 ½” Clean Wash Rock Cubic Yard 34 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 403 HOT MIX ASPHALT Section 403 of the Standard Specifications is hereby revised for this project as follows: Subsection 403.02 shall include the following: The design mix for hot mix asphalt shall conform to the following: Table 403-1 Property Test Method Value For Grading SX(100 ) Air Voids, percent at: N (design) CPL 5115 3.5 – 4.5 Lab Compaction (Revolutions): N (design) CPL 5115 100 Stability, minimum CPL 5106 30 Aggregate Retained on the 4.75 mm (No. 4) Sieve for S, SX and SG, and on the 2.36mm (No. 8) Sieve for ST and SF with at least 2 Mechanically Induced fractured faces, % minimum* CP 45 60 Accelerated Moisture Susceptibility Tensile Strength Ratio (Lottman), minimum CPL 5109 Method B 80 Minimum Dry Split Tensile Strength, kPa (psi) CPL 5109 Method B 205 (30) Grade of Asphalt Cement, Top Layer PG 64-28 Grade of Asphalt Cement, Layers below Top PG 64-28 Voids in the Mineral Aggregate (VMA) % minimum CP 48 See Table 403-2 Voids Filled with Asphalt (VFA), % AI MS-2 65-75 Dust to Asphalt Ratio Fine Gradation Coarse Gradation CP 50 0.6 – 1.2 0.8 – 1.6 Note: AI MS-2 = Asphalt Institute Manual Series 2 Note: Mixes with gradations having less than 40% passing the 4.75 mm (No. 4) sieve shall be approached with caution because of constructability problems. Note: Gradations for mixes with a nominal maximum aggregate size of one-inch or larger are considered a coarse gradation if they pass below the maximum density line at the #4 screen. Gradations for mixes with a nominal maximum aggregate size of 3/4” to 3/8” are considered a coarse gradation if they pass below the maximum density line at the #8 screen. Gradations for mixes with a nominal maximum aggregate size of #4 or smaller are considered a coarse gradation if they pass below the maximum density line at the #16 screen. *Fractured face requirements for SF may be waived by RME depending on project conditions. Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 403 HOT MIX ASPHALT All mix designs shall be run with a gyratory compaction angle of 1.25 degrees and properties must satisfy Table 403-1. Form 43 will establish construction targets for Asphalt Cement and all mix properties at Air Voids up to 1.0 percent below the mix design optimum. Table 403-2 Minimum Voids in the Mineral Aggregate (VMA) Nominal Maximum Size*, mm (inches) ***Design Air Voids ** 3.5% 4.0% 4.5% 5.0% 37.5 (1½) 11.6 11.7 11.8 N/A 25.0 (1) 12.6 12.7 12.8 19.0 (¾) 13.6 13.7 13.8 12.5 (½) 14.6 14.7 14.8 9.5 (⅜) 15.6 15.7 15.8 4.75 (No. 4) 16.6 16.7 16.8 16.9 * The Nominal Maximum Size is defined as one sieve larger than the first sieve to retain more than 10%. ** Interpolate specified VMA values for design air voids between those listed. *** Extrapolate specified VMA values for production air voids beyond those listed. The Contractor shall prepare a quality control plan outlining the steps taken to minimize segregation of HMA. This plan shall be submitted to the City Engineer and approved prior to beginning the paving operations. When the City Engineer determines that segregation is unacceptable, the paving shall stop and the cause of segregation shall be corrected before paving operations will be allowed to resume. The hot mix asphalt shall not contain any reclaimed asphalt pavement. Hot mix asphalt for patching shall conform to the gradation requirements for Hot Mix Asphalt (Grading SX 100). 36 Arthur Ditch CBC Replacement November 2014 Special Provisions -3- REVISION OF SECTION 403 HOT MIX ASPHALT Delete Subsection 403.05 and replace with the following: 403.05 The accepted quantities of hot mix asphalt will be paid for in accordance with subsection 401.22, at the contract unit price per ton for the bituminous mixture. Payment will be made under: Pay Item Pay Unit Hot Mix Asphalt (Grading SX)(100)(PG 64-28) Ton Aggregate, additives and all other work necessary to complete each hot mix asphalt item will not be paid for separately, but shall be included in the unit price bid. When the pay item includes the PG binder grade, the asphalt cement will not be measured and paid for separately, but shall be included in the work. When the pay item does not include the PG binder grade, asphalt cement will be measured and paid for in accordance with Section 411. Asphalt cement used in Hot Mix Asphalt (Patching) will not be measured and paid for separately, but shall be included in the work. Excavation, preparation, and tack coat of areas to be patched will not be measured and paid for separately, but shall be included in the work. 37 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 506 RIPRAP (12 IINCH) Section 506 of the Standard Specifications is hereby revised for this project as follows: In Subsection 506.05 delete the last sentence and replace with the following: Structure excavation for riprap will not be measured and paid for separately but shall be included in the cost of work. 38 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 603 16 INCH PLASTIC PIPE (SPECIAL) Section 603 of the Standard Specifications is hereby revised for this project as follows: Subsection 603.12 shall include the following: Required pipe shall be C905 PVC DR 18 Pressure Rated 235 PSI In Subsection 603.09 delete third sentence and replace with the following: The trench shall then be backfilled with structure backfill (flow-fill) material in accordance with Subsection 206.02. Subsection 603.12 shall include the following: Payment will be made under: Pay Item Pay Unit 16 Inch Plastic Pipe (Special) Lump Sum In Subsection 603.12 delete the third paragraph and replace with the following: Structure excavation and structure backfill (flow-fill) will not be measure and paid for separately but shall be included in the cost of work. 39 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 604 MANHOLE RING AND COVER Section 604 of the Standard Specifications is hereby revised for this project as follows: Subsection 604.06 shall include the following: The manhole and inlet attached to the proposed concrete box culvert as shown in the plans shall be measured and paid for as a lump sum under the pay item Manhole Ring and Cover. Measurement shall include all materials, including but not limited to inlet, manhole cover (3 noted on plan), grade rings, brick courses and anchor bolts and labor required to complete the installation. Subsection 604.07 shall include the following: Pay Item Pay Unit Manhole Ring and Cover Lump Sum 40 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 607 FENCE (TEMPORARY) (CHAIN LINK) Section 607 is hereby revised for this project as follows: Subsection 607.01 shall include the following: This work consists of installation and removal of temporary fence in locations shown on the plans. Subsection 607.02 shall include the following: All materials for temporary fencing shall be approved by the City Engineer prior to installation. Subsection 607.03 shall include the following: The Contractor shall install temporary gates during construction where necessary to gain access to the work zone and to allow Local Entity maintenance to ditch. Temporary gates shall remain closed during non-working hours. Subsection 607.04 shall include the following: Fence (Temporary) (Chain Link) will be measured by the linear foot. Gates will not be measured separately but will be measured and paid in the linear footage of the fence. Posts, ties, bracing and other material will not be measured and paid for separately but shall be included in the work. Subsection 607.05 shall include the following: Payment will be made under: Pay Item Pay Unit Fence (Temporary) (Chain Link) Linear Foot Payment for Fence (Temporary) (Chain Link) will be paid at the contract unit price per linear foot installed and accepted. The price shall be full compensation for furnishing, erecting, and maintaining all materials required. Removal of temporary fencing, including restoration of the site, is considered an incidental cost and no separate payment will be made. Temporary fence shall remain property of the Contractor. 41 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 607 FENCE CHAIN LINK (SPECIAL) Section 607 is hereby revised for this project as follows: Subsection 607.01 shall include the following: This work consists of the construction of permanent chain link fence in locations shown on the plans. Subsection 607.02 shall include the following: All materials for chain link fence shall closely match those used to construct the existing chain link fence and shall be approved by the City Engineer prior to installation. In Subsection 607.04 delete the first paragraph and replace with the following: Fence Chain Link (Special) will be measured by the linear foot. Measurement will be along the base of the fence from outside to outside of end posts for each continuous run of fence. In Subsection 607.04 delete the third paragraph and replace with the following: End posts, corner posts and line brace posts required for chain link fence will not be measured and paid for separately but shall be included in the cost of work. Subsection 607.05 shall include the following: Payment will be made under: Pay Item Pay Unit Fence Chain Link (Special) Linear Foot Subsection 607.05 shall be revised as follows: Delete the last paragraph and replace with the following: Fence Chain Link (Special) will be paid at the contract unit price per linear foot installed and accepted. The price shall be full compensation for all materials, labor, equipment, tools, and incidentals necessary to install and complete the item. 42 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 608 SIDEWALKS AND BIKEWAYS Subsection 608.03 shall include the following: 2. Markings. Concrete used in curb-gutter, sidewalk, and curb cuts shall have the name of the Concrete Contractor and the year of construction impressed therein, using letters not less than 1 inch high and 3/8 inch deep. Impressions shall be made in concrete at the beginning and end of each pour. Impressions delineating the location of water and sewer, (S for sanitary sewer, C for clean out, + for water, with the top of the + pointing to the water stop box), shall be located on the curb face at all service crossings. 3. Defective Areas. If, after stripping of forms, any concrete is found to be not formed as shown on the drawings, or is out of alignment or level, or shows a defective surface, it shall be considered as not conforming with these Standards. The defective area shall be removed and replaced by the Contractor at his expense. Subsection 608.05 shall include the following: Liquid Membrane Curing Compound and expansion joint materiel are considered incidental costs and no separate payment will be made. 43 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 608 CURB RAMP (SPECIAL) Section 608 of the Standard Specifications is hereby revised for this project as follows: Subsection 608.01 shall include the following: This work includes the installation of detectable warnings on concrete curb ramps at the locations shown on the plans and in accordance with the plans. Subsection 608.02 shall include the following: Detectable warnings on curb ramps shall be truncated domes of the dimensions shown on the plans. Domes shall be prefabricated by the manufacturer as a pattern on cast steel pavers. Pavers shall meet all Americans with Disabilities Act (ADA) requirements for truncated domes, and when installed, shall be capable of producing the pattern of domes as shown on the plans. Pavers shall meet the requirements of ASTM C 902 or ASTM C 936. Alternate materials may be used, if pre-approved by the City Engineer. The Contractor shall submit a sample of the product, the name of the selected supplier, and documentation that the product meets all contrast requirements and will be fully compatible with the curb ramp surface to the City Engineer for approval prior to start of work. Known vendors of alternate products include but are not limited to the following: Vendor Name Product Phone Numbers TMA Construction Supply CAST in TACT Warning Panels 303-295-6050 East Jordan Iron Works, Inc. Truncated Dome Plates 800-626-4653 Neenah Foundry Detectable Warning Plate 800-558-5075 The domes and the underlying surface shall have a minimum of 70% contrast with the light reflectivity of the adjoining surface. The contrast shall be verified using the following equation: Where B1 = Light Reflectance Value (LRV) of the lighter area B2= LRV of the darker area Absolute black and white will not be permitted. The contrast shall be achieved by adding pigment during the fabrication of the paver. Prior to start of work, the Contractor shall submit appropriate documentation from the manufacturer verifying that the contrast has been met, along with a sample paver, to the City Engineer for approval. 100 1 1 2 × − = B Contrast B B 44 Arthur Ditch CBC Replacement November 2014 Special Provisions -2- REVISION OF SECTION 608 CURB RAMP (SPECIAL) Subsection 608.03 shall include the following: (h) Alternate products. Alternate materials shall be installed in accordance with manufacturer’s recommendations. The concrete surface to which alternate materials are to be applied shall be prepared in accordance with manufacturer’s recommendations. Material requirements, color and application shall be in accordance with manufacturer’s recommendations and as approved by the City Engineer. Subsection 608.05 shall include the following: Attached curb and gutter, truncated dome detectable warnings and concrete pedestrian curb shown on the Roadway Details will not be measured separately but will be measured and paid in the square yardage of the curb 45 Arthur Ditch CBC Replacement November 2014 Special Provisions -3- REVSION OF SECTION 608 CURB RAMP (SPECIAL) ramps. Sand, pavers, alternate materials, and all other work and materials necessary for fabrication, transport, and installation of detectable warnings will not be measured and paid for separately, but shall be included in the work. Subsection 608.06 shall include the following: Payment will be made under: Pay Item Pay Unit Curb Ramp (Special) Square Yard Liquid Membrane Curing Compound and expansion joint materiel are considered incidental costs and no separate payment will be made. Payment for Curb Ramp (Special) shall be full compensation for all work and materials required to complete the items, including the attached curb and gutter, detectable warning panels and concrete pedestrian curb. 46 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 609 CURB AND GUTTER TYPE 2 (SPECIAL) Section 609 is hereby revised for this project as follows: Subsection 609.07 shall include the following: Payment will be made under: Pay Item Pay Unit Curb and Gutter Type 2 (Special) Linear Foot Liquid Membrane Curing Compound and expansion joint materiel are considered incidental costs and no separate payment will be made. 47 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 616 TRASH GUARD (SPECIAL) Section 616 of the Standard Specifications is hereby revised for this project as follows: In Subsection 616.03 delete second sentence and replace with the following: Trash guard shall be galvanized and fabricated in accordance with Section 509. Subsection 616.08 shall be modified in the following: Pay Item Pay Unit Trash Guard (Special) Each 48 Arthur Ditch CBC Replacement November 2014 Special Provisions REVISION OF SECTION 630 CONSTRUCTION ZONE TRAFFIC CONTROL Section 630 of the Standard Specifications is hereby revised for this project as follows: Subsection 630.15 shall include the following: Construction traffic control will not be measured separately but will be paid for on a lump sum basis. This lump sum basis shall include Traffic Control Management, Traffic Control Inspection, flagging, all anticipated traffic control devices that are shown on the plans and any other devices that may be requested by the City Engineer to ensure safety on the project for the full duration of the project. In Subsection 630.16 delete the first two paragraphs and replace with the following: Payment for Traffic Control shall be full compensation for Traffic Control Management, Traffic Control Inspection, and furnishing, erecting, cleaning, maintaining, resetting, repairing, moving, removing, and disposing of the traffic control devices. All construction traffic control devices that are not permanently incorporated into the project will remain the property of the Contractor. Traffic Control will be paid for as follows: 50 percent upon first utilization, and additional 40 percent when 75 percent of the original contract amount has been earned, and the final 10 percent when the project has been completed in accordance with subsection 105.20, exclusive of any maintenance periods. The percent of original contract amount earned will be determined by comparing the amount earned for bid items, other than traffic control, with the original contract amount minus the amounts bid for traffic control and mobilization. Subsection 603.16 shall include the following: Payment will be made under: Pay Item Pay Unit 630-10000 Traffic Control Lump Sum 49 Arthur Ditch CBC Replacement November 2014 Special Provisions FORCE ACCOUNT ITEMS DESCRIPTION This special provision contains the City’s estimate for force account items included in the Contract. All force account itmes will beaded to the total bid to determine the amount of the performance and payment bonds. Force Account work shall be performed as directed by the City Engineer. BASIS OF PAYMENT Scope of work is to be completed as a Completion Date Contract. Payment will be made in accordance with Subsection 109.04. Payment will constitute full compensation for all work necessary to complete the item. Force account work valued at $5,000 or less, that must be performed by a licensed journeyman in order to comply with federal, state, or local codes, may be paid for after receipt of the itemized statement endorsed by the Contractor. Force Account Item Quantity Amount Minor Contract Revisions FA 1 LS Waterline FA 1 LS 50 43 1 43 43 2 43 43 3 43 43 4 43 43 5 43 43 6 43 43 7 43 8 43 43 9 43 43 10 43 43 11 43 43 12 43 43 13 43 43 14 43 43 15 43 43 16 43 43 17 43 43 18 43 43 19 43 43 20 43 43 21 43 43 22 43 43 23 43 43 24 43 43 25 43 43 26 43 43 27 43 43 28 43 43 29 43 43 30 43 43 31 43 43 32 43 43 33 43 43 34 43 43 35 43 43 36 43 43 37 43 43 38 43 43 39 43 43 40 43 43 41 43 43 42 43 43 43 43 35