Loading...
HomeMy WebLinkAboutBID - 8005 METER BOX INSTALLATIONINVITATION TO BID 8005 METER BOX INSTALLATION BID OPENING: 3:00 P.M. (our clock), SEPTEMBER 29, 2014 The City of Fort Collins is requesting bids from firms for furnishing all labor, equipment, and materials necessary to perform all work as one contract, all in accordance with the plans, specifications, and other documents for the installation of standard meter boxes or meter pits to be added to existing water service lines at various locations throughout the City. Sealed bids will be received and publicly opened at the office of the Director of Purchasing and Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522, at the time and date noted on the bid proposal and/or contract documents. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. Bids must be received at the Purchasing Office prior to 3:00 p.m. (our clock), September 29, 2014. The City encourages all disadvantaged business enterprises to submit bid in response to all invitations and will not be discriminated against on the grounds of race, color, national origin. A prebid conference and job walk with representatives of prospective Bidders will be held at 10:00 am, on September 18, 2014 in Rainbow Room at the Water Meter Division Shop, 700 Wood Street, Bldg D., Fort Collins. Questions regarding bid submittal or process should be directed to Pat Johnson, CPPB, Senior Buyer at (970) 221-6816 or pjohnson@fcgov.com. A copy of the Bid may be obtained as follows: 1. Download the Bid from the Rocky Mountain E-Purchasing System at www.rockymountainbidsystem.com Special Instructions All bids must be properly signed by an authorized representative of the company with the legal capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set for closing. Once bids have been accepted by the City and closing has occurred, failure to enter into contract or honor the purchase order will be cause for removal of supplier's name from the City of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of forty-five (45) days after bid openings. Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained in the City's specifications initially provided to the bidder. Any proposed modification must be accepted in writing by the City prior to award of the bid. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly identified by the bid number and bid name contained in the bid proposal. No proposal will be accepted from, or any purchase order awarded, to any person, firm or corporation in default on any obligation to the City. Bids must be furnished exclusive of any federal excise tax, wherever applicable. Bidders must be properly licensed and secure necessary permits wherever applicable. Bidders not responding to this bid will be removed from our automated vendor listing for the subject commodities. The City may elect where applicable, to award bids on an individual item/group basis or on a total bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities. Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision- making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight charges must be included in prices submitted on proposal. Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not entered as separate pricing on the proposal form. Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions. Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is not a collusive or sham bid. Bid results are posted online at www.rockymountainbidsystem.com by the end of day on the opening date. Gerry S. Paul Director of Purchasing and Risk Management CITY OF FORT COLLINS BID PROPOSAL BID 8005 Meter Box Installation WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR METER BOX INSTALLATION PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS: The Contractor must provide for furnishing all labor, equipment, and materials necessary to perform all work as one contract, all in accordance with the plans, specifications, and other documents for the installation of standard meter boxes or meter pits to be added to existing water service lines at various locations throughout the City. SCOPE OF WORK 1. MATERIALS: The City of Fort Collins will furnish all meters, meter setters, idlers, connection couplings, meter box, cast iron recessed lid with worm lock, rubber of plastic inner lid, and all type “K” copper pipe as necessary to complete the installation at no cost to the Service Provider. All other material shall be furnished by the Service Provider in accordance with the City of Fort Collins current Standard Construction Specifications. 2. INSTALLATION: The Service Provider shall install all piping, fittings, meter box complete, meter setter and meter. Where contractor encounters galvanized service pipe, the contractor shall leave a 6 inch sample of the service line for customer’s inspection. The 6 inch sample shall also be submitted to the Engineer tagged with the address, contractor’s name, and date. All work shall comply with drawings 16-B, 11, 15 (Service Line for Duplex), 16-A, and 15 (Standard Exterior Setting). The Service Provider will be responsible for removing all landscaping, asphalt, concrete, etc., to facilitate the installation. The contractor will be responsible for backfilling the excavated area, compaction of all excavated holes and trenches, and restoration of all disturbed landscaping to original, or better, condition. Compaction will be warranted by the contractor through the contract specified warranty period. Any settling or trench failure will be corrected immediately. Damage to any surface supported by a failed trench will be repaired at the Service Provider’s expense. If concrete removal is necessary to complete the meter box installation, the Service Provider will subsequently repair the affected area with an approved temporary cold patch sufficient to support light vehicular and foot traffic until permanent repairs are made. The City will assume responsibility for making permanent repairs to these areas at a later date. It is the Water Utilities’ preference that excavation and backfill for meter box installations be performed by hand. However, the use of machinery is acceptable provided that any area affected by machinery is restored to original, or better, condition. It is the Service Provider’s responsibility to locate and protect existing utilities. If a utility is damaged, the Service Provider shall contact the Utility company immediately for repair. The Service Provider shall pay all costs for such repair. Since meter box installations continue through the winter months, the Service Provider will, at times, be required to work in somewhat less than favorable soil conditions. Should the schedule dictate working in areas of ground frost, the Service Provider must be capable of removing frozen soil and will be required to remove up to 10 inches of such soil to facilitate the meter box installation at no extra charge. No frozen soil will be used for backfill. All excavated frozen soil will be stockpiled at a designated City facility or properly disposed of by Service Provider. Any sod replacement postponed through the winter will be replaced by the contractor, at his expense, according to the Water Utilities’ schedule, no later than May 1st of the following season. If, after the meter is installed, the meter continues to run with all water turned off, the contractor will assist the Water Utilities customer in discovering a leak. (Limited to a visual inspection only – fixtures, access valves, hose bibs, etc.) The contractor will report his findings to the Project Manager or Inspector, and the customer, and will not be responsible for repairing any leaks that are not a direct result of work performed by Service Provider. The Service Provider may repair a leak with authorization from the customer or the Project Manager with costs to be borne by the customer. A service line entering a meter box must be within a depth of 54 to 66 inches to meet the correct installation requirements. The Service Provider will loop the service line up or down to meet the required installation elevations at no extra charge. In any installation, the contractor will be responsible to a depth of 72 (seventy-two) inches of excavation before any extra money is paid for the “deep hole”. If the installation requires that an electronic location be made on the service line, the Water Utility will provide such location, and the Service Provider will be responsible for excavation to the required depth plus 24 (twenty-four) inches either side of the location mark. 3. INSPECTIONS: Inspections will be performed by the City of Fort Collins Water Utilities Department, Meter shop. Inspection of the meter box is required before the excavated area is backfilled. The Water Utilities Department will perform the final inspection approximately 1 (one) week after installation. 4. WARRANTY: The Service Provider shall be responsible for a period of two (2) years following the final acceptance of each item of work performed under this contract for the satisfactory repair or replacement of all work or material which becomes defective, during this period, as a direct or indirect result of faulty workmanship. SPECIAL CONDITIONS FOR METER BOX INSTALLATIONS 1. PAYMENT: The Service Provider will submit a work order/invoice with duplicate copy for each installation completed. 2. WORK SCHEDULES: No work shall be done between 6:00 p.m. and 7:00 a.m., nor on Sunday or Legal Holidays without permission of the Owner/occupant, except emergency work. No service shall be interrupted before 8:00 a.m. or after 5:00 p.m. without prior permission of Owner/occupant. ALL work will be scheduled through the City of Fort Collins Water Utilities, Meter Shop. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested from the award of this contract. Service Provider shall respond to initial Owner request for a new work order within 24 hours. Service Provider will give Owner/occupant a minimum of 24 hours notice prior to beginning any work. Service Provider shall complete individual meter box installations within 5 days from commencement of work at that particular location. Service Provider shall provide emergency or urgently requested services within 2 (two) hours of request. The Service Provider shall attempt to contact the Owner or resident at the property immediately prior to commencing work, to explain the nature and schedule of the work to be performed. 3. PROTECTION OF WORK: The Service Provider shall, at his own expense: a. Provide and maintain proper protection to all finished work, any unfinished work, and to all material and equipment, including but not limited to that furnished to him by the City from the time it is delivered to him during the entire progress of the work, and be responsible for and make good any injury to same and shall protect exterior surfaces against any defacement which would detract from their good appearance. b. Clean up the job site at the end of each day and upon completion of the work, make good all damage, leaving the site in a clean and orderly condition, restoring the site to original or better condition. Haul away all debris or excess material remaining as an end product at job completion. 4. NON-ASSIGNABILITY: Within seven (7) days after award, the Service Provider shall submit to the City of Fort Collins Water Utilities Department a list of all subcontractors proposed for the work. The City reserves the right to deny the use of any subcontractor that it deems to be incapable of properly performing the work. No changes of the subcontractor list will be allowed without written consent of the City of Fort Collins Water Utilities Department. If the Service Provider should sublet any part of this contract, the Service Provider shall be as fully responsible to the City for acts and omissions of a subcontractor, and of persons either directly or indirectly employed by his subcontractor, as he is for the acts and omissions of persons directly employed by him. 5. ADDITIONAL REQUIREMENT: The Service Provider shall have a person at each job site while work is being performed who is able to speak English. Prior to commencing work, the Service Provider shall obtain a license from the City of Fort Collins Engineering Department to work in the Public Right of Way. The Service Provider shall submit a copy of this license to the Engineer. 6. SAFETY: The Service Provider shall be responsible for maintaining safe conditions in the various work areas at all times. Barricades and warning devices shall be installed where required or if requested by the Engineer. 7. CHARACTER OF WORKERS: The Service Provider shall employ only competent, skillful workers to do the work. Whenever any worker shall appear to be incompetent or to act in a disorderly or improper manner, such persons shall be removed from the work upon request of the City of Fort Collins Water Utilities Department. Workers shall be courteous and responsible when dealing with Homeowners. 8. MINIMUM COMPLETION: The Service Provider must be able to complete as many as three (3) meter box installations per day, or; a minimum of fifteen (15) meter box installations per week, as may be determined by scheduling generated through the project manager. 9. WRITTEN ESTIMATES: This agreement also allows for the installation of water meter pits designed for 1 ½ inch and 2 inch meters. (See specs detail #9) The contract in its entirety will apply to these installations except that the Service Provider shall submit written estimates for each pit installation on a case by case basis. 10. CUSTOMER SERVICE: Services outlined in this agreement are provided to City customers through the City of Fort Collins Water Utility and the Utility has certain expectations as to the successful fulfillment of this contract: a. The Service Provider will maintain a high standard of quality in his workmanship as determined by specifications, regulations, requirements and procedures incorporated in these documents. b. Any interaction between the Service Provider and City of Fort Collins Water Utility customer, concerning a meter installation, will be handled in a positive and respectful manner. c. Process and outcome will meet the valid expectations of both the Homeowner and the Water Utility. 11. UTILITIES a. Service Provider is responsible for furnishing all power necessary for construction and shall make arrangements with Owner as to the amount of water required and time water is needed. b. Service Provider is responsible for furnishing and maintaining sanitary facilities at job site. 8005 METER BOX INSTALLATION BID SCHEDULE We hereby enter our bid for the City of Fort Collins’ requirements for METER BOX INSTALLATION, per the bid invitation and any referenced specifications. The following prices shall include but are not limited to all labor, materials, rentals, fuel, safety, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc. needed for the work. Vendor Name: 1. Excavation for meter box installation up to 4’W x 5’L x 6’D. (Includes removing existing meter box in same hole, back fill, compaction and site restoration, may include removing existing meter box in same excavation; does not include plumbing or setting a meter box to grade.) $ 2. Oversized excavation for two meter box installations up to 4’W x 7’L x 6’D. (Includes back fill, compaction and site restoration, may include removing existing meter box in same excavation; does not include plumbing or setting a meter box to grade.) $ 3. Plumb and set a meter box to grade. (Does not include excavation or backfill.) $ 4. Demo meter box. (Remove substandard meter box and reconnect services at original grade.) $ 5. Deep hole. (Extra digging for excavations greater than 72” deep.) Cost per foot $ 6. Open cut trench. (Up to 3”W x 5’D) Cost per lineal foot $ 7. Bore. Able to accommodate up to a 2-inch service. Cost per lineal foot $ 8. Cut and remove concrete. Cost per square foot $ 9. Cut and remove asphalt. Cost per square foot $ 10. Add a curb stop. $ 11. Materials furnished by contractor. Cost Plus 12. Removal of frozen soil. (Deeper than 10”) $ 13. Excavate for a meter pit for a 1 ½” or 2” meter. (Includes back fill, compaction and site restoration; does not include plumbing or setting a meter pit to grade. May include removing existing meter pit in same excavation.) $ 14. Plumb and set a meter pit to grade for a 1 ½” or 2” meter. (Does not include excavation or backfill.) $ 15. Demo meter pit for a 1 ½” or 2” service. (Remove substandard meter pit and reconnect services at original grade) $ 16. Remove meter box lid housing leaving old meter box. (Includes backfill, compaction and site restoration.) $ TOTAL BASE BID $ WORK SITE EXAMPLES: PRICING OF THESE EXAMPLES WILL BE USED AS THE BASIS FOR BID AWARD Typical Meter Box Installations UNIT PRICES TO BE USED: Amount (1) The meter box is in a lawn area near the curb where a new sidewalk will be installed. The meter box needs to be removed from its current location and a new one installed 10 feet closer to the house. The service line is 66” deep. 4 + 1 + 3 $ (2) The meter box and the plumbing in the box are in poor condition. The meter box needs to be replaced and re-plumbed with new materials to current standards in the same spot in the lawn. The service line is 78” deep. 1 + 3 + 5 $ (3) The meter box is by the curb stop and currently serves both sides of a duplex and the customer is separating the duplex service. Need to install a tee at the existing curb stop, two new curb stops, and one meter box with a 5 ft pigtail for the customer to connect the second service to. The service lines are 66” deep. 2 + 10 +10 + 3 $ (4) The meter box needs to be relocated. A new meter box can be installed without removing the old one by plumbing a new box beside the old one. 1 + 16 + 3 $ Disconnecting the pipes outside the old box, removing the top cover and backfilling the old pit. The service line is 66” deep. (5) The meter box will be installed in a lawn area next to the curb box. The service line is 66” deep. 1+3 $ Average of typical installation x .90 = (1 + 2 + 3 + 4 + 5 divided by 5 x .90) “TYPICAL INSTALLATIONS” WILL BE THE CASE 90% OF THE TIME. $ Non-Typical Meter Box Replacement UNIT PRICES TO BE USED: (6) The curb box and meter box are in the center of a 16’ wide concrete driveway. The meter box needs to be moved to the lawn area next to the driveway. Need to remove the current meter box, loop the service from the curb stop to the lawn area at the edge of the driveway, install a new meter box and loop back to tie the service back in at the center of the driveway. Approximately 24 sq ft of concrete driveway will be removed. The service is 66” deep. 8 + 4 + 6 + 1 + 3 $ (7) The meter pit and the plumbing for a 2-inch meter are in poor condition. The pit and plumbing in the pit need to be replaced with new materials to current standards in the same spot in the lawn. The service is 66” deep. 13+ 14 + 15 $ Average of non-typical installation x .10 = (6 + 7) divided by 2 x .10) “NON-TYPICAL INSTALLATIONS” WILL BE THE CASE 10% OF THE TIME. $ Total Bid = (Sum of Typical + Non-Typical Average) PLEASE NOTE: THIS IS THE TOTAL BASE BID AMOUNT, TO BE USED FOR AWARD PURPOSES. $ EXHIBIT A BID ACKNOWLEDGEMENT Contractor hereby acknowledges receipt of the City of Fort Collins Utilities’ Request for Bids for the Meter Box Installation and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the Bid. Additionally, the Contractor hereby makes the following representations to Utilities: a. All of the statements and representations made in this proposal are true to the best of the Contractor’s knowledge and belief. b. The Contractor has obtained all necessary authorizations and approvals that will enable the Contractor to commit to the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 45 days from the date hereof. d. I further agree that the method of award is acceptable to my company. e. I acknowledge receipt of addenda. Contractor Firm Name: Physical Address: Remit to Address: Phone: Authorized Agent of Firm Name: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: PLEASE NOTE: BID SUBMITTALS MUST INCLUDE THE BID SCHEDULE AND EXHIBITS A, B AND C TO BE CONSIDERED. FAILURE TO PROVIDE ANY OF THESE REQUIRED DOCUMENTS MAY RESULT IN YOUR BID BEING CONSIDERED NON-RESPONSIVE AND THEREFORE REJECTED FROM CONSIDERATION. EXHIBIT B STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: 3. When organized: 4. If a corporation, where incorporated: 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: 8. Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why? 10. Are you debarred by any government agency? If yes list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. 12. List your major equipment available for this contract. 13. Experience in construction Work similar in importance to this project: 14. Background and experience of the principal members of your organization, including officers: 15. Credit available: $ 16. Bank Reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General Contractor? If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? If yes, what percent of total contract? And to whom? 20. Are any lawsuits pending against you or your firm at this time? IF yes, DETAIL 21. What are the limits of your public liability? DETAIL What company? 22. What are your company's bonding limitations? 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ________________ this ______ day of __________________, 20__. Company: By: Printed: Title: State of County of being duly sworn deposes and says that he is of (Name) (Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this _______ day of____________, 20__. (Seal) Notary Public My commission expires: . EXHIBIT C SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over [Percentage]% of the contract. ITEM SUBCONTRACTOR SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for services for . The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, a sample of which is attached hereto as Exhibit "C", consisting of ( ) page( ) and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. No work order shall exceed $ . The only services authorized under this agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating the Agreement, make changes within the general scope of the particular services assigned and the Service Provider agrees to perform such changed services. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period {Option 1} This Agreement shall commence upon the date of execution shown on the signature page of this Agreement and shall continue in full force and effect for one (1) year, unless sooner terminated as herein provided. In addition, at the option of the city, the Agreement may be extended for an additional period of one (1) year at the rates provided with written notice to the Service Provider mailed no later than thirty (30) days prior to contract end. 5. Contract Period. {Option 2] This Agreement shall commence , 200 and shall continue in full force and effect until , 200 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed ( ) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 6. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. 7. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following address: Service Provider: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the termination date, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 8. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. 9. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit "B", consisting of two (2) page[s], and incorporated herein by this reference. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. 10. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the work order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 11. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 12. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 13. Subcontractors. Service Provider may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Service Provider. 14. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 15. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 16. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 17. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default thereof. 18. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non- defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 19. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representative, successors and assigns of said parties. 20. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit "A", consisting of ( ) page[s], attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder, shall deliver to the City's Director of Purchasing and Risk Management, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 21. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 22. Law/Severability. This Agreement shall be governed in all respect by the laws of the State of Colorado. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction such holding shall not invalidate or render unenforceable any other provision of this Agreement. 23. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1. Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1. Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 24. Red Flags Rules. Service Provider must implement reasonable policies and procedures to detect, prevent and mitigate the risk of identity theft in compliance with the Identity Theft Red Flags Rules found at 16 Code of Federal Regulations part 681. Further, Service Provider must take appropriate steps to mitigate identity theft if it occurs with one or more of the City’s covered accounts and must as expeditiously as possible notify the City in writing of significant breeches of security or Red Flags to the Utilities or the Privacy Committee. 25. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit B - Confidentiality consisting of one (1) page, attached hereto and incorporated herein by this reference. CITY OF FORT COLLINS, COLORADO a municipal corporation By: __________________________________ Gerry Paul Director of Purchasing and Risk Management Date:_________________________________ ATTEST: ____________________________ City Clerk APPROVED AS TO FORM: ____________________________ Assistant City Attorney By:____________________________________ _______________________________________ Print Name Title____________________________________ Corporate President or Vice President Date: _______________________________ EXHIBIT A INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. EXHIBIT B CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Service Provider shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. EXHIBIT C FORT COLLINS UTILITIES WORK ORDER WORK ORDER NO. DATE: CONTRACTOR: TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order & Notice of Award 00530-1 00670 Application for Exemption Certificate 00670-1 – 00670-2 CONDITIONS OF THE CONTRACT 00700 General Conditions 00700-1 - 00700-34 Exhibit GC-A GC-A1 - GC-A2 00800 Supplementary Conditions 00800-1 - 00800-2 00900 Addenda, Modifications and Payment 0900-1 00950 Work Order Change Order Form 00950-1 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00670 Application for Exemption Certificate SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO: WORK ORDER NUMBER: WORK ORDER TITLE: PURCHASE ORDER: ORIGINAL BID/RFP PROJECT NUMBER & NAME: ENGINEER: OWNER’S REPRESENTATIVE: NOTICE OF AWARD DATE: OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated , for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated , you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is ($ ). Pursuant to the AGREEMENT and the Contract Documents, insurance is required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is , and after Substantial Completion, the date for Final Completion is . 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: ($ ) for each calendar day or fraction thereof that expires after until the work is Substantially Complete. 2) Final Acceptance: After Substantial Completion ($ ) for each calendar day or fraction thereof that expires after the 60 calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 5. EXECUTION. Three (3) copies of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Three (3) sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is, by . A. You must deliver to OWNER three (3) fully-executed counterparts of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. Each Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the insurance, as specified in the Agreement, this Work Order, the General Conditions (Article 5.1) and the Supplementary Conditions. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated , between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: By: Name: Title: Date: OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. ACCEPTANCE: Date: _____ Special Projects Manager ACCEPTANCE: Date: Chief Engineer ACCEPTANCE: Date: Engineering & Field Services Manager ACCEPTANCE: Date: Utilities Executive Director (if greater than $1,000,000) OWNER: CITY OF FORT COLLINS ACCEPTANCE: ___________________________________________ Date: __________ Gerry S. Paul Director of Purchasing and Risk Management (if greater than $60,000) BID SCHEDULE 5/98 AGREEMENT 00800 Page 1 SECTION 00670 APPLICATION FOR EXEMPTION CERTIFICATE Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contractors will receive a Contractor’s Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor’s name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. SECTION 00700 GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins Modifications, Rev. 9/94) and other provisions of the Contract Documents as indicated below. SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion. .... Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified conditions corrected. SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order--A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8. Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10. Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of this Article 2 or of the General and Supplementary Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: SC-5 INSURANCE SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 5.4.8.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B - $100,000 / $100,000 / $500,000. For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the Owner. For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). For Paragraph 5.02.B.3: This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the General Conditions: 6.14.3. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR's duty and responsibility for compliance thereto: 6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado has been issued by its office and there shall also be procured from the Colorado Secretary of State of photostatic or certified copy of the designated of place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions: 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions: 12.3. .... Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions: 14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in proportion to the cumulative actual Cost of the Work as a percentage of the Allowable Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall be advanced to the Contractor for mobilization in the first progress payment. SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order SECTION 00950 CHANGE ORDER FORM CHANGE ORDER NO. CONTRACTOR: WORK ORDER TITLE & NO. : ORIGINAL PROJECT TITLE & NO: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COSTS $ ________________ TOTAL APPROVED CHANGE ORDER(S) $ ________________ TOTAL PENDING CHANGE ORDER(S) $ ________________ TOTAL THIS CHANGE ORDER $ ________________ TOTAL % OF ORIGINAL CONTRACT, THIS CO: _______________ % TOTAL % OF ORIGINAL CONTRACT, ALL CO’S: _______________ % ADJUSTED CONTRACT COST $ ________________ (Assuming all change orders approved) ACCEPTED BY: _____________________________________ DATE: ____________ Contractor's Representative ACCEPTED BY: _____________________________________ DATE: ____________ Project Manager REVIEWED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ Title: APPROVED BY: _____________________________________ DATE: ____________ (Director of Purchasing if > $60,000) cc: City Clerk Architect/Engineer Finance Purchasing Project Manager Contractor