HomeMy WebLinkAboutRESPONSE - BID - 8005 METER BOX INSTALLATIONEXHIBIT A
BID ACKNOWLEDGEMENT
Contractor hereby acknowledges receipt of the City of Fort Collins Utilities' Request for
Bids for the Meter Box Installation and acknowledges that it has read and agrees to be
fully bound by all of the terms, conditions and other provisions set forth in the Bid.
Additionally, the Contractor hereby makes the following representations to Utilities:
a. All of the statements and representations made in this proposal are true to the
best of the Contractor's knowledge and belief.
b. The Contractor has obtained all necessary authorizations and approvals that will
enable the Contractor to commit to the terms provided in this proposal.
c. This proposal is a firm and binding offer, for a period of 45 days from the date
hereof.
d. I further agree that the method of award is acceptable to my company.
e. I acknowledge receipt of _ addenda.
Contractor Firm Name: 4151
Physical Address: laoo /%nnls &6,e >rv(( 6&..5, Go rGSZel
Remit to Address:
Phone: 9'70- wz-36/9 ng /,U;/ nr-?P7-1f-1r
Authorized Agent of Firm Name: /�'%a Tersan
Signature of Authorized Agent: 7�z
Primary Contact for Project+ L�isrn
Title: !'i<s iu Email Address: /4.SIeXc Q /1W 6�-7
Phone: 92G 46Z-V/1 Cell Phone: 97O- Zi7-99�
PLEASE NOTE. BID SUBMITTALS MUST INCLUDE THE BID SCHEDULE AND
EXHIBITS A, B AND C TO BE CONSIDERED. FAILURE TO PROVIDE
ANY OF THESE REQUIRED DOCUMENTS MAY RESULT IN YOUR
BID BEING CONSIDERED NON -RESPONSIVE AND THEREFORE
REJECTED FROM CONSIDERATION.
EXHIBIT B
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and comprehensive. This
statement must be notarized. If necessary, questions may be answered on separate attached
sheets. The Bidder may submit any additional information he desires.
1. Name of Bidder:
2. Permanent main office address: 1`a Arris p'i-c r fo G/1,„Jy LO �OSZy
3. When organized:
4. If a corporation, where incorporated: ^lcvwdc
5. How many years have you been engaged in the contracting business under your present
firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each contract and the
appropriate anticipated dates of completion.)
I ZGS, 5160 er', p /a NOve q
General character of Work performed by your company:
CA6IL/p / e4ee hp, .0 (Nwri./' /[SCWGr Mwii/ Cgwf�w.�bri
M��K'e/ /SL�c/ SG�vi'LC CinS�w fq�
Have you ever failed to complete any Work awarded to you?
If so, where and why?
9. Have you ever defaulted on a contract?
If so, where and why?,
10. Are you debarred by any government agency?
If yes list agency name.
No
11. List the more important projects recently completed by your company, stating the
approximate cost of each, and the month and year completed, location and type of
construction.
Z010* Tm„ Wdl/M1on , 3'd s� J.'./ ,�., I 23S000
ZOtI
CSU
Zack
ro. n,C
(✓�/%�ti� �
A�� L« E
,>Slti:s
�
Zosscrr
12. List your major equipment available for this contract.
T^. 4,7 J...y.
NWO /5,,k4.. 74 cve..,+6r
13. Experience in construction Work similar in importance to this project:
ZOOS Gi� evr >:,t< G�ni ln..rYc. Herr ARE7rMt CG w�/o i�
l5a elms re4r&i`e,414
14. Background and experience of the principal members of your organization, including
officers:
r-,* Le,--ca / V yam+`- exY P�' -. in Ah/1 `. C ^-SI i.. //ebl N"Oe /i
15. Credit available: $ /00, boo
16. Bank Reference:
17. Will you, upon request, fill out a detailed financial statement and furnish any other
information that may be required by the OWNER?
18. Are you licensed as a General Contractor?_
If yes, in what city, county and state?
What class, license and numbers?
19. Do you anticipate subcontracting Work under this Contract? /"o
If yes, what percent of total contract?
And to whom?
20. Are any lawsuits pending against you or your firm at this time? &
IF yes, DETAIL
21. What are the limits of your public liability? DETAIL
What company?
22. What are your company's bonding limitations? 11 0000 boO
23. The undersigned hereby authorizes and requests any person, firm or corporation to
furnish any information requested by the OWNER in verification of the recital comprising
this Statement of Bidder's Qualifications.
Dated at ) z - C?o
this Zq day of 5<+a>l iee , 20-LZI
Company: !yam Fn�e�i,>es rrc
By: / Sru sa. 7z Printed:
Title:
State of C. /O/..la
County of
tl�Lw'.e being duly sworn deposes and says that he
is re $ 0 V.'7L of 11 sI- te19'1�1„scs . I-e
(Name) (Organization)
and that the answers to the foregoing questions and all statements therein contained are true
and correct.
Subscribed and sworn to before me this day of , 20_
(Seal)
Notary Public
My commission
EXHIBIT C
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors performing over
[Percentage]% of the contract.
ITEM SUBCONTRACTOR
IV14 ti/�
8005 METER BOX INSTALLATION
BID SCHEDULE
We hereby enter our bid for the City of Fort Collins' requirements for METER BOX
INSTALLATION, per the bid invitation and any referenced specifications.
The following prices shall include but are not limited to all labor, materials, rentals, fuel, safety,
transportation, shoring, removal, dewatering, overhead, profit, insurance, etc. needed for the
work.
Vendor Name: 14Sr EeEa��r-:es Inc
Excavation for meter box installation up to 4'W x 51 x
6'D. (Includes removing existing meter box in same
1'
hole, back fill, compaction and site restoration, may
$ 3t
include removing existing meter box in same
excavation; does not include plumbing or setting a
meter box to grade.)
Oversized excavation for two meter box installations
up to 4'W x 71 x 6'D. (Includes back fill, compaction
2.
and site restoration, may include removing existing
$ 1,5CX7
meter box in same excavation; does not include
plumbing or setting a meter box to grade.)
3'
Plumb and set a meter box to grade. (Does not
$ 3CJ0
include excavation or backfill.)
4.
Demo meter box. (Remove substandard meter box
$ 1 $00
and reconnect services at original grade.)
"
5
Deep hole. (Extra digging for excavations greater
Cost per foot
$ O
Zit
than 72" deep.)
6.
Open cut trench. (Up to 3"W x 5'D)
Cost per lineal
foot
$ SS
7.
Bore. Able to accommodate up to a 2-inch service.
Cost per lineal
foot
$ 7S
8.
Cut and remove concrete.
fCooit per square
$ 1Z p0
9.
Cut and remove asphalt.
Cost per square
foot
$ IZ 00
10.
Add a curb stop.
$ Z?
11.
Materials furnished by contractor.
Cost Plus
15*9m
12.
Removal of frozen soil. (Deeper than 10")
$ ' 0O
Excavate for a meter pit for a 1 '/2" or 2" meter.
(Includes back fill, compaction and site restoration,
13.
does not include plumbing or setting a meter pit to
$ I s00
grade. May include removing existing meter pit in
same excavation.)
14
Plumb and set a meter pit to grade for a 1 '/2" or 2"
$ 750
meter. (Does not include excavation or backfill.)
Demo meter pit for a 1 '/2" or 2" service. (Remove
15.
substandard meter pit and reconnect services at
$ Z dOp
original grade)
16.
Remove meter box lid housing leaving old meter box.
$ I zoo
(Includes backfill, compaction and site restoration.)
,
TOTAL BASE BID
$ II clLq
WORK SITE EXAMPLES: PRICING OF THESE EXAMPLES WILL BE USED AS THE
BASIS FOR BID AWARD
UNIT PRICES
Amount
Typical Meter Box Installations
TO BE USED:
(1)
The meter box is in a lawn area near the curb where
a new sidewalk will be installed. The meter box
needs to be removed from its current location and a
house. The
4 + 1 + 3
3, f 0C)
new one installed 10 feet closer to the
$
service line is 66" deep.
(2)
The meter box and the plumbing in the box are in
poor condition. The meter box needs to be replaced
and re -plumbed with new materials to current
1 + 3 + 5
>f�
standards in the same spot in the lawn. The service
$
line is 78" deep.
(3)
The meter box is by the curb stop and currently
serves both sides of a duplex and the customer is
separating the duplex service. Need to install a tee at
the existing curb stop, two new curb stops, and one
2 + 10 +10 + 3
Z, 75O
meter box with a 5 ft pigtail for the customer to
$
connect the second service to. The service lines are
66" deep.
(4)
The meter box needs to be relocated. A new meter
box can be installed without removing the old one by
1 + 16 + 3
Z N po
plumbing a new box beside the old one.
$
Disconnecting the pipes outside the old box,
removing the top cover and backfilling the old pit.
The service line is 66" deep.
(5)
The meter box will be installed in a lawn area next to
the curb box. The service line is 66" deep.
1+3
ZGO
Average of typical installation x .90 =
(1+2+3+4+5dividedby5x.90)
"TYPICAL INSTALLATIONS" WILL BE THE CASE 90%
gGr�
$
OF THE TIME.
Non -Typical Meter Box Replacement
UNIT PRICES
TO BE USED:
(6)
The curb box and meter box are in the center of a
16' wide concrete driveway. The meter box needs to
be moved to the lawn area next to the driveway.
Need to remove the current meter box, loop the
service from the curb stop to the lawn area at the
8 + 4 + 6 + 1 +
edge of the driveway, install a new meter box and
3
$ 4 ,ZG S
loop back to tie the service back in at the center of
the driveway. Approximately 24 sq ft of concrete
driveway will be removed. The service is 66" deep.
(7)
The meter pit and the plumbing for a 2-inch meter
are in poor condition. The pit and plumbing in the pit
need to be replaced with new materials to current
13+ 14 + 15
standards in the same spot in the lawn. The service
$
is 66" deep.
Average of non -typical installation x .10 =
(6 + 7) divided by 2 x .10)
ygO.90
"NON -TYPICAL INSTALLATIONS" WILL BE THE CASE
$
10% OF THE TIME.
Total Bid =
(Sum of Typical + Non -Typical Average)
PLEASE NOTE: THIS IS THE TOTAL BASE BID
AMOUNT, TO BE USED FOR AWARD PURPOSES.