HomeMy WebLinkAboutRESPONSE - BID - 8005 METER BOX INSTALLATIONEXHIBIT A BID ACKNOWLEDGEMENT Contractor hereby acknowledges receipt of the City of Fort Collins Utilities' Request for Bids for the Meter Box Installation and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the Bid. Additionally, the Contractor hereby makes the following representations to Utilities: a. All of the statements and representations made in this proposal are true to the best of the Contractor's knowledge and belief. b. The Contractor has obtained all necessary authorizations and approvals that will enable the Contractor to commit to the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 45 days from the date hereof. d. I further agree that the method of award is acceptable to my company. e. I acknowledge receipt of _ addenda. Contractor Firm Name: 4151 Physical Address: laoo /%nnls &6,e >rv(( 6&..5, Go rGSZel Remit to Address: Phone: 9'70- wz-36/9 ng /,U;/ nr-?P7-1f-1r Authorized Agent of Firm Name: /�'%a Tersan Signature of Authorized Agent: 7�z Primary Contact for Project+ L�isrn Title: !'i<s iu Email Address: /4.SIeXc Q /1W 6�-7 Phone: 92G 46Z-V/1 Cell Phone: 97O- Zi7-99� PLEASE NOTE. BID SUBMITTALS MUST INCLUDE THE BID SCHEDULE AND EXHIBITS A, B AND C TO BE CONSIDERED. FAILURE TO PROVIDE ANY OF THESE REQUIRED DOCUMENTS MAY RESULT IN YOUR BID BEING CONSIDERED NON -RESPONSIVE AND THEREFORE REJECTED FROM CONSIDERATION. EXHIBIT B STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: 2. Permanent main office address: 1`a Arris p'i-c r fo G/1,„Jy LO �OSZy 3. When organized: 4. If a corporation, where incorporated: ^lcvwdc 5. How many years have you been engaged in the contracting business under your present firm or trade name? 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) I ZGS, 5160 er', p /a NOve q General character of Work performed by your company: CA6IL/p / e4ee hp, .0 (Nwri./' /[SCWGr Mwii/ Cgwf�w.�bri M��K'e/ /SL�c/ SG�vi'LC CinS�w fq� Have you ever failed to complete any Work awarded to you? If so, where and why? 9. Have you ever defaulted on a contract? If so, where and why?, 10. Are you debarred by any government agency? If yes list agency name. No 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Z010* Tm„ Wdl/M1on , 3'd s� J.'./ ,�., I 23S000 ZOtI CSU Zack ro. n,C (✓�/%�ti� � A�� L« E ,>Slti:s � Zosscrr 12. List your major equipment available for this contract. T^. 4,7 J...y. NWO /5,,k4.. 74 cve..,+6r 13. Experience in construction Work similar in importance to this project: ZOOS Gi� evr >:,t< G�ni ln..rYc. Herr ARE7rMt CG w�/o i� l5a elms re4r&i`e,414 14. Background and experience of the principal members of your organization, including officers: r-,* Le,--ca / V yam+`- exY P�' -. in Ah/1 `. C ^-SI i.. //ebl N"Oe /i 15. Credit available: $ /00, boo 16. Bank Reference: 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? 18. Are you licensed as a General Contractor?_ If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? /"o If yes, what percent of total contract? And to whom? 20. Are any lawsuits pending against you or your firm at this time? & IF yes, DETAIL 21. What are the limits of your public liability? DETAIL What company? 22. What are your company's bonding limitations? 11 0000 boO 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ) z - C?o this Zq day of 5<+a>l iee , 20-LZI Company: !yam Fn�e�i,>es rrc By: / Sru sa. 7z Printed: Title: State of C. /O/..la County of tl�Lw'.e being duly sworn deposes and says that he is re $ 0 V.'7L of 11 sI- te19'1�1„scs . I-e (Name) (Organization) and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20_ (Seal) Notary Public My commission EXHIBIT C SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over [Percentage]% of the contract. ITEM SUBCONTRACTOR IV14 ti/� 8005 METER BOX INSTALLATION BID SCHEDULE We hereby enter our bid for the City of Fort Collins' requirements for METER BOX INSTALLATION, per the bid invitation and any referenced specifications. The following prices shall include but are not limited to all labor, materials, rentals, fuel, safety, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc. needed for the work. Vendor Name: 14Sr EeEa��r-:es Inc Excavation for meter box installation up to 4'W x 51 x 6'D. (Includes removing existing meter box in same 1' hole, back fill, compaction and site restoration, may $ 3t include removing existing meter box in same excavation; does not include plumbing or setting a meter box to grade.) Oversized excavation for two meter box installations up to 4'W x 71 x 6'D. (Includes back fill, compaction 2. and site restoration, may include removing existing $ 1,5CX7 meter box in same excavation; does not include plumbing or setting a meter box to grade.) 3' Plumb and set a meter box to grade. (Does not $ 3CJ0 include excavation or backfill.) 4. Demo meter box. (Remove substandard meter box $ 1 $00 and reconnect services at original grade.) " 5 Deep hole. (Extra digging for excavations greater Cost per foot $ O Zit than 72" deep.) 6. Open cut trench. (Up to 3"W x 5'D) Cost per lineal foot $ SS 7. Bore. Able to accommodate up to a 2-inch service. Cost per lineal foot $ 7S 8. Cut and remove concrete. fCooit per square $ 1Z p0 9. Cut and remove asphalt. Cost per square foot $ IZ 00 10. Add a curb stop. $ Z? 11. Materials furnished by contractor. Cost Plus 15*9m 12. Removal of frozen soil. (Deeper than 10") $ ' 0O Excavate for a meter pit for a 1 '/2" or 2" meter. (Includes back fill, compaction and site restoration, 13. does not include plumbing or setting a meter pit to $ I s00 grade. May include removing existing meter pit in same excavation.) 14 Plumb and set a meter pit to grade for a 1 '/2" or 2" $ 750 meter. (Does not include excavation or backfill.) Demo meter pit for a 1 '/2" or 2" service. (Remove 15. substandard meter pit and reconnect services at $ Z dOp original grade) 16. Remove meter box lid housing leaving old meter box. $ I zoo (Includes backfill, compaction and site restoration.) , TOTAL BASE BID $ II clLq WORK SITE EXAMPLES: PRICING OF THESE EXAMPLES WILL BE USED AS THE BASIS FOR BID AWARD UNIT PRICES Amount Typical Meter Box Installations TO BE USED: (1) The meter box is in a lawn area near the curb where a new sidewalk will be installed. The meter box needs to be removed from its current location and a house. The 4 + 1 + 3 3, f 0C) new one installed 10 feet closer to the $ service line is 66" deep. (2) The meter box and the plumbing in the box are in poor condition. The meter box needs to be replaced and re -plumbed with new materials to current 1 + 3 + 5 >f� standards in the same spot in the lawn. The service $ line is 78" deep. (3) The meter box is by the curb stop and currently serves both sides of a duplex and the customer is separating the duplex service. Need to install a tee at the existing curb stop, two new curb stops, and one 2 + 10 +10 + 3 Z, 75O meter box with a 5 ft pigtail for the customer to $ connect the second service to. The service lines are 66" deep. (4) The meter box needs to be relocated. A new meter box can be installed without removing the old one by 1 + 16 + 3 Z N po plumbing a new box beside the old one. $ Disconnecting the pipes outside the old box, removing the top cover and backfilling the old pit. The service line is 66" deep. (5) The meter box will be installed in a lawn area next to the curb box. The service line is 66" deep. 1+3 ZGO Average of typical installation x .90 = (1+2+3+4+5dividedby5x.90) "TYPICAL INSTALLATIONS" WILL BE THE CASE 90% gGr� $ OF THE TIME. Non -Typical Meter Box Replacement UNIT PRICES TO BE USED: (6) The curb box and meter box are in the center of a 16' wide concrete driveway. The meter box needs to be moved to the lawn area next to the driveway. Need to remove the current meter box, loop the service from the curb stop to the lawn area at the 8 + 4 + 6 + 1 + edge of the driveway, install a new meter box and 3 $ 4 ,ZG S loop back to tie the service back in at the center of the driveway. Approximately 24 sq ft of concrete driveway will be removed. The service is 66" deep. (7) The meter pit and the plumbing for a 2-inch meter are in poor condition. The pit and plumbing in the pit need to be replaced with new materials to current 13+ 14 + 15 standards in the same spot in the lawn. The service $ is 66" deep. Average of non -typical installation x .10 = (6 + 7) divided by 2 x .10) ygO.90 "NON -TYPICAL INSTALLATIONS" WILL BE THE CASE $ 10% OF THE TIME. Total Bid = (Sum of Typical + Non -Typical Average) PLEASE NOTE: THIS IS THE TOTAL BASE BID AMOUNT, TO BE USED FOR AWARD PURPOSES.