Loading...
HomeMy WebLinkAboutBID - 8035 ARTHUR DITCH BRIDGE REPLACEMENT - CANYON STREETADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8035: Arthur Ditch Bridge Replacement Canyon Avenue OPENING DATE: 3:00 PM (Our Clock) December 8, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions and Answers. Exhibit 2 – Revised Bid Schedule Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Exhibit 1 1. Milling Limits definition / explanation a. The milling activity required of this project will be paid as plan quantity. The approach to this scope has been to preserve enough existing material in place to pave on existing material to meet the new elevations of the precast box and roadway curb and gutter. The volumes have been calculated based on existing surface and proposed surface elevations, resulting in a net volume of asphalt material to be removed through the milling process. 2. Nuisance flows a. Nuisance flows from storm events could occur as upstream storm water collection points will not prohibit entry of water into the Arthur Ditch. As storm events are unpredictable in their frequency and volume, the occurrence of such an event(s) and their run-off are incidental to the work. 3. Cast-in-place precast lid a. A precast lid for the transitions pieces associated with the two end connections would be considered, however the transition pieces are anticipated to transition both horizontally and vertically, thus requiring the top or lid component to be provided with exact shop drawing specifications, possibly after the completion of the as-built wall segments. 4. Existing Parking lot conditions / staging area a. All conditions will be assessed prior to mobilization. If damage does incur and repair is needed, the awarded contractor will make repairs at the contract price. The estimate quantity has been increased through addendum 1 to include an additional 85 tons of material based on a 150’x30’ area, quantifying a reasonable worst case scenario. 1 Clearing and Grubbing LS 1 $ - $ - 2 Removal of Portions of Structures (RCB) LF 312 $ - $ - 3 Removal of Inlet EACH 2 $ - $ - 4 Removal of Pipe LF 21 $ - $ - 5 Removal of Curb and Gutter LF 637 $ - $ - 6 Removal of Concrete (4"-8") SY 237 $ - $ - 7 Removal of Asphalt Mat (6"-9") SY 1068 $ - $ - 8 Removal of Asphalt Mat (Planing) (less than 3") SY 506 $ - $ - 9 Removal of Asphalt Mat (Planing) (3"-7.5") SY 600 $ - $ - 10 Removal of Wall LF 92 $ - $ - 11 Removal of Bollard EACH 2 $ - $ - 12 Removal of Posts (Including Attached Chain) EACH 12 $ - $ - 13 Potholing HOUR 16 $ - $ - 14 Embankment CY 14 $ - $ - 15 Muck Excavation CY 10 $ - $ - 16 Structure Excavation CY 841 $ - $ - 17 Structural Backfill (Class 1) CY 336 $ - $ - 18 Filter Material (Class A) CY 148 $ - $ - 19 Topsoil CY 20 $ - $ - 20 Silt Fence LF 193 $ - $ - 21 Erosion Control Supervisor HR 40 $ - $ - 22 Aggregate Bags LF 86 $ - $ - 23 Stabilized Construction Entrance EACH 1 $ - $ - 24 Concrete Washout Structure EACH 1 $ - $ - 25 Storm Drain Inlet Protection (Type II) EACH 7 $ - $ - 26 Remove & Stockpile Modular Wall LF 34 $ - $ - 27 Adjust Manhole EACH 2 $ - $ - 28 Dewatering LS 1 $ - $ - 29 Sod SF 1560 $ - $ - 30 Landscape Boarder (Timber Treated) (8' long) EACH 8 $ - $ - 31 Aggregate Base Course (Class 6) TON 103 $ - $ - 32 Aggregate Base Course (Special) (3"-4" Cobble) CY 8 $ - $ - 33 Hot Mix Asphalt (Grading S) (75) (PG 64-22) TON 216 $ - $ - 34 Hot Mix Asphalt (Grading SX) (75) (PG 64-22) TON 253 $ - $ - 35 Hot Mix Asphalt (Temporary) TON 29 $ - $ - 36 Waterproofing Membrane SY 195 $ - $ - 37 Concrete Class D (RCB) CY 44 $ - $ - 38 Concrete Wall (Mulberry St) LF 48 $ - $ - 39 Reinforcing Steel (Epoxy) LB 12837 $ - $ - 40 15 Inch Reinforced Concrete Pipe (CIP) (CLASS III) LF 119 $ - $ - 41 9'x2.5' Concrete Box Culvert (4-sided) (Precast) LF 582 $ - $ - 42 Single Curb Inlet EACH 2 $ - $ - 43 Manhole Ring & Cover (30-Inch) EACH 2 $ - $ - 44 Manhole Ring & Cover (36-Inch) EACH 1 $ - $ - 45 Fence (Plastic) LF 475 $ - $ - 46 Fence (Temporary) LF 668 $ - $ - 47 Concrete Driveways (6-Inch) SY 38 $ - $ - 48 Concrete Sidewalk (4-Inch) SY 162 $ - $ - 49 Curb and Gutter (Infall) LF 460 $ - $ - 50 Curb and Gutter (Outfall) LF 151 $ - $ - 51 Temporary Curb (8" Vertical Barrier) (DT-701) LF 87 $ - $ - 52 Sanitary Facility EACH 1 $ - $ - 53 Mobilization LS 1 $ - $ - 54 Concrete Barrier (Temporary)(includes resets) LF 132 $ - $ - 55 Barricade (Type 3 M-A)(Temporary) EACH 8 $ - $ - 56 Construction Traffic Sign (Panel Size A) EACH 9 $ - $ - 57 Construction Traffic Sign (Panel Size B) EACH 4 $ - $ - 58 Traffic Control Management DAY 20 $ - $ - 59 Traffic Control Inspection DAY 45 $ - $ - 60 Flagging HR 80 $ - $ - 61 F/A Landscaping FA 1 $ - $ - $ - IN WORDS: TOTAL BASE BID ARTHUR DITCH BRIDGE REPLACEMENT- CANYON AVENUE BID SCHEDULE ITEM NO. ITEM DESCRIPTION UNIT QUANTITY UNIT COST COST