Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9150777//5"6-� �7 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN — THE CITY OF FORT COLLINS AND Connell Resources, Inc. DATED: 1115116 Work Order Number: Purchase Order Number: Project Title: Pineridge Trail Work Original BidlRFP Project Number & Name: Commencement Date: February1, 2015 Completion Date: May 1, 2015 Maximum Fee: (time and reimbursable direct costs):$41,172 Project Description: Build and surface 1400' linear feet of new trail Grade and surface 2000' feet of existing trail All surfacing material used will be virgin class 5 aucrecale set at 9' wide and 6' deep. Scope of Services: See attached. Professional agrees to perform the services Identlned above and on the attached fors In accordance with the terms and conditions contained herein and In the Professional Services Agreement between the partles. In the event of a conflict between or ambiguity In the terms of the Professional Services Agreement and this work order (Including the attached fors) the Professional Services Agreement shall control. The attached forms consisting of ( pages are hereby accepted and Incorporstec herein, by this reference, and Notice to Proceed I: hereby give Profes nal — Date City of Fort Collins By: Todd Juhasz Project Manager '' Date: 7� By: Gerry Paul Director of Purchasing and Risk Management (over$60,000.00) v. P /7�� d\ � \i� \� ƒ � V\ � . ~ ®.� } � �:5� « w� � . m Jy , � \. 2. %�\�� � � ��:v:»»� � � ��� ^^ , � \\ � , }�� � � \� /.\. 2 �<\ &y\<y Connell Resources. Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970)223.3191 tsdmabsr: QUOTATION Date: 1/14/2015 Submitted To: Oty Uf Fort Collin -Neutral Resources BICTde Rneidge Trag Addrveon Port Collins, 00 Bid Number: Pfojactuaadon: Canted: Todd Jurm Projea Clty,stace: Phone: 976416-1206 Fax: 97D416-2211 Errgineer7Archlmct Item# Item Description 1!sUmatedQuontity Veit Unit Price Total Price OR300 Mobilization 1.00 IS $4,280.00 $4,280.00 23-30D Floe Gmde For Trail Surfadro 2,000.00 LF $1.75 $3,500A0 23-300 GMade For New Trail 1,400.00.0 $2.65 $3,710.00 23-500 ead dil Trail Wiles And Clean Up Grading 3,400.00 LF $0.83 $2,822.00 3 110 9 R wide Gravel Swfadnis 6• (Class 5 Agg Fuse) 3,400.00 Sy $7.90 $25,860.00 Virgin Base Is Quoted, RaWded Asphalt Or Reryded Crorecte Base Would Be Cheaper For Ibis Work Total Bid Prioe: $41,172.00 notes: • Pddng Is based open preliminary Informadon from city of fort OnSus mound area, as praAm by Todd Juhaz • The following are excluded Dan N6 proposal: C ruivoctlm layout and erglneering; Drainage Willi certification; Warrantee pedod in excess of one year; Street droning for work performed by toes; Pemtlts: IndWin9 but not BmBed m, city, building, development mmtrudion, mnshuc0on dewaiedng, westewatar disdrerge, storm water dlxharga (NMIN), air quality, M.; Fe®, Indudrg but not Word m, ford elopemen , inspeedon unity oerenextion, meters, are.; Dewa[etlng; MaintrrVince of erosion control devices for others quality control orameptame testing; prattle dog mmoral, relo:alon, or exMmNaBon; landscaping, seadng, or raegetabon. • pmment Dnlmge Rss Nan 1.5%dedgned or obtainable fat W 11 not be guaranteed. • Frmt m oval or wlyder pro OM Is rat lPdW If requested, R wa M bNedelther on a time and matedal bass or a lump auo amount Nat is remedy agreed Open. • Envimnmantai site assessment/ n ltgabon of hazardous m=Wrdnab matekis h excluded. Treabnemtor testing for mntamin grmdwater Is SyedflWlyadlded. • Add 1%to Include performance and payment bond. CONDITIONS AND AGREEMENTS CwnOktlenNulc SPo^m•,o awhh eu mm,mu w w•O�ue..eaanc aN, of wm. 414m15 3:07:09 M Pass 1 di