HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9150777//5"6-� �7
WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN —
THE CITY OF FORT COLLINS
AND
Connell Resources, Inc.
DATED: 1115116
Work Order Number:
Purchase Order Number:
Project Title: Pineridge Trail Work
Original BidlRFP Project Number & Name:
Commencement Date: February1, 2015
Completion Date: May 1, 2015
Maximum Fee: (time and reimbursable direct costs):$41,172
Project Description: Build and surface 1400' linear feet of new trail Grade and surface 2000' feet of
existing trail All surfacing material used will be virgin class 5 aucrecale set at 9'
wide and 6' deep.
Scope of Services: See attached.
Professional agrees to perform the services
Identlned above and on the attached fors In
accordance with the terms and conditions
contained herein and In the Professional Services
Agreement between the partles. In the event of a
conflict between or ambiguity In the terms of the
Professional Services Agreement and this work
order (Including the attached fors) the
Professional Services Agreement shall control.
The attached forms consisting of (
pages are hereby accepted and Incorporstec
herein, by this reference, and Notice to Proceed I:
hereby give
Profes nal —
Date
City of Fort Collins
By: Todd Juhasz
Project Manager
''
Date: 7�
By:
Gerry Paul
Director of Purchasing and Risk Management
(over$60,000.00)
v. P
/7�� d\
� \i� \� ƒ
� V\
� . ~ ®.� }
� �:5� « w� � . m Jy ,
� \. 2.
%�\�� � � ��:v:»»�
� � ��� ^^ , � \\
� , }�� � � \� /.\. 2
�<\
&y\<y
Connell Resources. Inc.
7785 Highland Meadows Pkwy, #100
Fort Collins, CO 80528
Phone: (970) 223-3151
Fax: (970)223.3191
tsdmabsr: QUOTATION Date: 1/14/2015
Submitted To: Oty Uf Fort Collin -Neutral Resources BICTde Rneidge Trag
Addrveon Port Collins, 00 Bid Number:
Pfojactuaadon:
Canted: Todd Jurm Projea Clty,stace:
Phone: 976416-1206 Fax: 97D416-2211 Errgineer7Archlmct
Item# Item Description 1!sUmatedQuontity Veit Unit Price Total Price
OR300 Mobilization 1.00 IS $4,280.00 $4,280.00
23-30D Floe Gmde For Trail Surfadro 2,000.00 LF $1.75 $3,500A0
23-300 GMade For New Trail 1,400.00.0 $2.65 $3,710.00
23-500 ead dil Trail Wiles And Clean Up Grading 3,400.00 LF $0.83 $2,822.00
3 110 9 R wide Gravel Swfadnis 6• (Class 5 Agg Fuse) 3,400.00 Sy $7.90 $25,860.00
Virgin Base Is Quoted, RaWded Asphalt Or Reryded
Crorecte Base Would Be Cheaper For Ibis Work
Total Bid Prioe: $41,172.00
notes:
• Pddng Is based open preliminary Informadon from city of fort OnSus mound area, as praAm by Todd Juhaz
• The following are excluded Dan N6 proposal: C ruivoctlm layout and erglneering; Drainage Willi certification; Warrantee pedod in excess of
one year; Street droning for work performed by toes; Pemtlts: IndWin9 but not BmBed m, city, building, development mmtrudion, mnshuc0on
dewaiedng, westewatar disdrerge, storm water dlxharga (NMIN), air quality, M.; Fe®, Indudrg but not Word m, ford elopemen ,
inspeedon unity oerenextion, meters, are.; Dewa[etlng; MaintrrVince of erosion control devices for others quality control orameptame testing;
prattle dog mmoral, relo:alon, or exMmNaBon; landscaping, seadng, or raegetabon.
• pmment Dnlmge Rss Nan 1.5%dedgned or obtainable fat W 11 not be guaranteed.
• Frmt m oval or wlyder pro OM Is rat lPdW If requested, R wa M bNedelther on a time and matedal bass or a lump auo amount Nat is
remedy agreed Open.
• Envimnmantai site assessment/ n ltgabon of hazardous m=Wrdnab matekis h excluded. Treabnemtor testing for mntamin grmdwater
Is SyedflWlyadlded.
• Add 1%to Include performance and payment bond.
CONDITIONS AND AGREEMENTS
CwnOktlenNulc
SPo^m•,o awhh eu mm,mu w w•O�ue..eaanc aN, of wm.
414m15 3:07:09 M Pass 1 di