HomeMy WebLinkAboutBID - 7676 E LINCOLN & S LEMAY AVE IMPROVEMENTS (3)Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 1 of 6 ADDENDUM NO. 3 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7676: E Lincoln Ave & S Lemay Ave Improvements OPENING DATE: 3:00 PM (Our Clock) August 19, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: 1. Revisions to the Bid Schedule A. Increase in item 202 “Removal of Pavement Markings” from 0 SF to 2089 SF. This item is reflected correctly in plan set on page 4 and is now corrected in Exhibit 1 – Revised Bid Schedule. B. AutoCad (CAD) files are available upon request from Tracy Dyer, Project Engineer. Please send an email request to tdyer@fcgov.com for an electronic copy of these files. 2. Exhibit 1 – Revised Bid Schedule Please note that the Revised Bid Schedule has also been uploaded as a separate Microsoft Excel file. Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 2 of 6 EXHIBIT 1 – REVISED BID SCHEDULE 1 201 Clearing and Grubbing 1 LS $ - 2 202 Removal of Tree 54 EA $ - 3 202 Removal of Median Tree 39 EA $ - 4 202 Removal of Tree Stump 5 EA $ - 5 202 Removal of Median Shrubs and Topsoil (stockpile, redistribute) 1,790 CY $ - 6 202 Removal of Concrete Irrigation Structures 1 LS $ - 7 202 Removal of Pipe 121 LF $ - 8 202 Removal of Traffic Barricade 2 EA $ - 9 202 Removal of Bollard 4 EA $ - 10 202 Removal of Pavement Markings 2,089 SF $ - 11 202 Removal of Sidewalk 72 SY $ - 12 202 Removal of Concrete Pan 160 LF $ - 13 202 Removal of Curb and Gutter 3,177 LF $ - 14 202 Removal of Concrete Curb Ramp 16 SY $ - 15 202 Removal of Median Cover/Splash Guard 1,063 SY $ - 16 202 Removal of Concrete Pavement 553 SY $ - 17 202 Removal of Asphalt Mat 5,664 SY $ - 18 203 Unclassified Excavation (CIP) 5,225 CY $ - 19 203 Embankment (CIP) 1,118 CY $ - 20 203 Haul and Dispose 2,800 CY $ - 21 203 Borrow (Class 5 or 6 ABC) (CIP) 1,381 CY $ - 22 203 Muck Excavation - (CIP) 1,307 CY $ - 23 203 Potholing 1 LS $ - 24 208 Erosion Control (SWMP, BMPs, Permits) 1 LS $ - 25 210 Reset Traffic Sign 21 EA $ - 26 210 Reset Riprap 6 CY $ - 27 210 Reset Fire Hydrant 1 EA $ - QUANTITY UNIT UNIT COST TOTAL COST BID NO. CONTRACT ITEM NO. CONTRACT ITEM Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 3 of 6 28 210 Reset Water Blow Off 1 EA $ - 29 210 Reset Bus Stop Bench & Sign 1 EA $ - 30 210 Reset Mailbox 1 EA $ - 31 210 Adjust Manhole 5 EA $ - 32 210 Adjust Valve Box 2 EA $ - 33 304 Aggregate Base Course (Class 5 or 6) 5,917 TON $ - 34 306 Reconditioning (8 Inch) 10,414 SY $ - 35 403 Hot Mix Asphalt (Grading S) (75) (PG 64-22) 2,408 TON $ - 36 403 Hot Mix Asphalt (Grading S) (100) (PG 64-28) 1,269 TON $ - 37 403 Hot Mix Asphalt Patch (Gradins S) (74) (PG 64-22) 73 TON $ - 38 412 Concrete Pavement (8 Inch Driveway) 425 SY $ - 39 412 Concrete Pavement (11 Inch) 1,014 SY $ - 40 412 Enhanced Concrete Crosswalk 49 SY $ - 41 412 Median Nose 17 SY $ - 42 506 Riprap (Type L) 10 CY $ - 43 603 8 Inch PVC Sewer Pipe (CIP) 70 EA $ - 44 603 15 Inch RCP (CIP) 58 LF $ - 45 603 15 Inch HDPE Pipe (CIP) 168 LF $ - 46 603 15 Inch Concrete End Section 1 EA $ - 47 603 15 Inch HDPE End Section 1 EA $ - 48 603 18 Inch Reinforced Concrete Pipe (CIP) 32 LF $ - 49 603 24 Inch Reinforced Concrete Pipe (CIP) 264 LF $ - 50 603 24 Inch Reinforced Concrete End Section 1 EA $ - 51 604 Inlet Type R (5 Foot) 1 EA $ - 52 604 Inlet Type R (10 Foot) 2 EA $ - 53 604 Manhole Slab Base (4 Foot) 2 EA $ - 54 604 48 Inch Flat Top Storm Sewer Manhole 2 EA $ - 55 608 Temporary Asphalt Sidewalk (3" Depth) 299 TON $ - Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 4 of 6 56 608 Concrete Sidewalk (6 Inch) 1,473 SY $ - 57 608 Concrete Curb Ramp w/ Truncated Dome (8 Inch) 143 SY $ - 58 609 Curb and Gutter Type 2 (Section I-B) 2,757 LF $ - 59 609 Curb and Gutter Type 2 (Section II-B) 2,239 LF $ - 60 610 Exposed Aggregate Median Splash Guard (4 Inch) 1,781 SF $ - 61 610 Exposed Aggregate Median Cover 1,590 SF $ - 62 619 8 Inch PVC Water Main (C-900) 50 LF $ - 63 619 8 Inch x 6 Inch Reducer 1 EA $ - 64 619 8 Inch x 24 Inch Tapping Saddle 1 EA $ - 65 619 8 Inch Gate Valve 1 EA $ - 66 619 Fire Hydrant Assembly 1 EA $ - 67 626 Mobilization 1 LS $ - 68 630 Type III Barricade 3 EA $ - 69 630 Construction Zone Traffic Control 1 LS $ - 70 207 Median Topsoil 1,790 CY $ - 71 207 Tree Lawn Topsoil 319 CY $ - 72 207 Lincoln Ave Parkway Topsoil 250 CY $ - 73 212 Dryland Seed 47,475 SF $ - 74 213 Landscape Boulders - 'A' Boulder 31 EA $ - 75 213 Landscape Boulders - 'B' Boulder 28 EA $ - 76 213 Landscape Boulders - 'C' Boulder 16 EA $ - 77 213 Landscape Weed Barrier Fabric (ALL Inorganic beds) 739 SY $ - 78 213 Steel Edger 1,560 LF $ - 79 213 Wood (Organic) Mulch 9,420 SF $ - 80 213 Inorganic Mulch 6,650 SF $ - 81 214 Ornamental Street Tree 2" 32 EA $ - 82 214 Deciduous Street Tree 2" 3 EA $ - 83 214 Shrubs 5 Gal 418 EA $ - 84 214 Perennials 1 Gal 536 EA $ - Landscaping Items Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 5 of 6 85 214 Ornamental Grasses 1 Gal 337 EA $ - 86 214 Landscape Maintenance (2 Year) (Medians Only) 1 LS $ - 87 623 Irrigation System-Medians 15,653 SF $ - 88 623 Sprinkler Irrigation, West ROW, served from Private Property 7,308 SF $ - 89 623 Drip Irrigation, West ROW, served from Private Property 1,400 SF $ - 90 623 Bubbler Irrigation Zones to New Trees, West ROW, north of Magnolia 2 EA $ - 91 623 Bubbler Irrigation Zones to New Trees, West ROW, south of Magnolia 6 EA $ - 92 623 Irrigation Concrol System- Medians and southwest tree bubbler zones 1 EA $ - 93 623 Back Flow Concrete Pad and Enclosure- Median 1 EA $ - 94 212 Turf Sod - West Parkway 7,330 SF $ - 95 213 Landscape Boulders - 'A' Boulder 10 EA $ - 96 213 Landscape Boulders - 'B' Boulder 7 EA $ - 97 213 Landscape Weed Barrier Fabric (ALL Inorganic beds) 138 SY $ - 98 213 Steel Edger 420 LF $ - 99 213 Wood (Organic) Mulch 1,500 SF $ - 100 213 Inorganic Mulch 1,250 SF $ - 101 214 Ornamental Street Tree 2" 11 EA $ - 102 214 Deciduous Street Tree 2" 10 EA $ - 103 214 Shrubs 5 Gal 60 EA $ - 104 214 Ornamental Grasses 1 Gal 70 EA $ - 105 210 Reset Cathode Protection Unit 3 EA $ - 106 210 Reset Street Light 7 EA $ - 107 210 Reset Water Meter 1 EA $ - 108 614 Magnolia Intersection Traffic Signal 1 LS $ - 109 614 Signing 7 EA $ - 110 619 Blow-off Fire Hydrant Assembly 1 EA $ - 111 - Bus Shelter 1 EA $ - 112 625 Construction Surveying 1 LS $ - 113 627 4 Inch Double Yellow Lane Line 340 LF $ - Work To Be Performed By Others Landscaping Items - Phase 2 Addendum 3 – 7676 E Lincoln Ave & S Lemay Ave Improvements Page 6 of 6 114 627 4 Inch Yellow with 4 Inch Dashed Yellow Line 2,900 LF $ - 115 627 4 Inch Dashed White Lane Line (10' long with 30' gap) 1,227 LF $ - 116 627 8 Inch Solid White Channelizing Line 4,388 LF $ - 117 627 4 Inch Solid White Line 1,521 LF $ - 118 627 4 Inch Dotted White Line 1,314 LF $ - 119 627 Crosswalk Bars 64 EA $ - 120 627 Pavement Marking 410 SF $ - TOTAL BASE BID $ - IN WORDS