Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9150715WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Connell Resources, Inc. DATED: 1/16/2015 Work Order Number: q /5'?7/ ' Purchase Order Number. Project Title: Arapaho Bend Concrete Drive Approach —RCP Culvert Original Bid/RFP Project Number & Name: Commencement Date: 1/26/15 Completion Date: 3/3)/16 Maximum Fee: (time and reimbursable direct costs): $18,418.00 Project Description: Replace old culvert with new 36" RCP Culvert along Strauss Cabin Road at the drive into the future parking lot east of Mariah Lane. Scope of Services: See attached Quote. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and'in the Professional Services Agreement between the parties. In the event of a conflict between' or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of 2 (two) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional Date: ►11 co �� . City of Fort ColliiRns, By: a C l� t o U \ti a✓1 �O `� r Prqj6cf Manager Date: ) 20 J By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: Connell Resources, Inc, 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970)223-3191 Estimator: Roland Tremble QUOTATION Date: 1/16/2015 Submitted To: City Of Fort Collins - Natural Resources Bid Title Arapahoe Bend Concrete Drive Approach Address: Fort Collins, CO Bid Number: Project Location: Arapahoe Bend Natural Area Contact: Ryan Kogut Project City, State: Fort Collins, CO Phone: 970-416-2206 Fax: 970-416-2211 Engineer/Architect: Item # Item Description - Estimated Quantity Unit Unit Price Total Price 00-100 Mobilization 1,00 EACH $3,000.00 $3,000.00 00-175 Pothole Existing Utilities 4.00 HR $186.00 $744.00 00-180 Surveying If Required 1.00 LS $834.00 $834.00 02-149 36' RCP Storm Drain 56.00 LF $145.00 $8,120.00 02-150 36" RCP FES 2,00 EACH $1,650.00 $3,300.00 22-230 Remove Existing Structure 1.00 EACH $1,880.00 $1,880.00 29-114 Erosion Log (9" Diameter) 20.00 LF $27.00 $540.00 Total Bid Price $18,418.00 Notes: • Pricing is based upon plans entitled "arapahoe bend natural area improvements concrete driveway entrance" dated 12/19/14, Sheet 1 of 1 and Geotechnical Engineering report was not provided • The following are excluded from this proposal: Engineering; Drainage facility certification; Warrantee period in excess of one year; Street cleaning for work performed by others; Permits: including but not limited to, city building, development construction, construction dewaterng, wastewater discharge, storm water discharge (NPDES), air quality, etc.; Fees, including but not limited to, for developement, inspection, utility connection, meters, etc.; Dewatering; Erosion control devices for others; quality control or acceptance testing; prairie dog removal, relocation, or extermination; landscaping, seeding, or revegetation. • Pavement Drainage less than 1.5% designed or obtainable fall will not be guaranteed. • Material prices for pipeline Items are guaranteed for a period of 30 days from the date shown on the top of this quote. After 30 days the material prices may change the unit prices quoted. • Please provide a minimum of 4 weeks advanced notification of work requests to allow for scheduling the work. No work will be completed without a signed Contract Agreement. • Frost removal or winter protection is not included. If requested, it will be billed either on a time and material basis or a lump sum amount that is mutually agreed apon. • Environmental site assesment / mitigation of hazardous or contaminated materials is excluded. Treatment or testing for contaminated groudwater is specifically excluded. • Estimate assumes that all fill material required would be available onsite. Estimate includes county flight of way permit CONDITIONS AND AGREEMENTS • �,5 LW ITIIDRAW AL OF QUOTATION: This quotation may be withdrawn or modified by Connell Resources, lite. ("Connell") if not accepted by the named sponsor (the "Sponsor) within thirty (30) days from date of issue. 2YERFORNIA NCE: Delivery of materials and performance of services herein quoted are subject to delays occasioned by circumstances beyond Connell's control. Completion date is subjml to weather conditions, mechanical failures, labor difficulties, 6rel or material shortages, Fire, govemment authority or regulation, acts of Gad, enginee ; changes, contractors not included in this Agmemen or any muse beyond Connell's control. 3,SPONSOR'S RESPONSIBI LITIES: This quotation does net includeany charges for lapping fees unless noted. Sponsor to famish all easements and adnt alewnrkingrightofways. Sponsor wil I pay al I costs of design otgincamig mid inspections and quality control testing. 4.5011, MECHANICS AND UNDERGROUND CONDITIONS: During excavation, ifmaterial isencountered that a I -1/, yard backhoe cannot remove for utility installation or a DR tractor cannot rip for grading work, a price adjustment may be necessary. If blasting (or other approved method) becomes necessary, this work will be done as an additional cast on a time and material basis or a negotiated lump sum basis. Also, if unstable subgrade conditions arc encountered, these conditions shall be the criteria for change order negotiations between Sponsor and Connell. S.DESIGNAND ENGINEERING SERVICES Sponsor acknowledges that Connell is tat providing professional design or engineering services. Sponsor is solely responsible for performing, or retaining qualified professionals to perfamn, all sera services, at their cost. Connell shall not be liable for any damages resulting from design or cnShrBering services performed by sponsor, spotsor's agents or third parties. 6.EXTRA WORK: Upon written notice from Connell to the sponsor,sponsor's agent or employee that extra work not specifically included in the gaotmion is necessary to complete the work described, the parties shall negotiate a written, signed agreement for the extra work within three (3) working days of the dale of such notice. If such written agreement is not reached within three (3) working days and Cornell has not otherwise received from the sponsor any written authorization for the extra work, then Correll may in its sole absolntc discretion proceed with extra work if Connell considers it necessary. Ascompemsation for the extra work, the sponsor shall pay Connell on a time -and material basis for all costs related to such work unless the panics agree in writing on another method of compensation. 7.QUANTITY DETERMINATION AND BILLINGS: For any unit price quotation, the gUatuilies shall be verified by in -field mmsitimment alter construction, and cite total price to be paid by sponsor will be calculated by multiplying the verified quantities times the unit prices for such quantities. This quotation shall be Considered a unit price quotation unless It Is Specifically designated as a lu np-stun quotation. S.PAN'AIENT TERMS: The smamar agrees to pay Connell the full quoted prim with any adjusu gals, pxovided for wife work herein specified. Invoices or progress payments will be due on 1/16/2015 9:06:18 AM Page 1 of 2