HomeMy WebLinkAboutWORK ORDER - RFP - 7414 TECHNICAL CONSULTATION & PROGRAM MGMT FOR SUPPORT & INTEGRATION OF SMART GRID SOLUTION & RELATED SERVICES (7)t:mc�x`� RM, �r *s ;—aT..F � Y,? T� �+sv yy�j•.—+j.- av—•_re,..�.tE'_"'_"im_" sJ'- ..� -- ea 5Y t �G• �, i Technical Consultation and Program Management for support and integration of smart grid solution and related services WORK ORDER #14: This Work Oder is as provided in Professional Services Agreement resulting from City of Fort Collins RFP #7414 initially commencing September 1, 2012 with four (4) optional one year extensions, currently extended through August 31, 2015 by and between the City of Fort Collins, a Municipal Corporation hereinafter referred to as the "City' and Excergy Corporation, hereinafter referred to as "Professional". This Work Order for Professional Services is agreed to by these parties. Statement of Work A. Provide level of effort project managetent and project engineering to ensure quality, cost, and schedule performance of the AMFC project through June 2015. Continue to support and finish completion of Customer Web Portal and Demand Response Systems, including development, integration, and test. Provide customer engagement consulting to integrate new systems with existing City staff and systems. Specifically: a. Continued management of the centralized Program Management Office (PMO) as deemed necessary. b. Continue to execute a compatible Project Management Approach and Methodology with Fort Collins C. Assist in management of Project Organization d. Manage Project Execution Plan and Schedule e. Maintain Quality Assurance/Control and guide other vendors and contractors in the same f. Engage and manage issue resolution g. Support monthly DOE issue management h. Support monthly DOE risk management i. Manage Project Status Plan j. Support/guidance in presentations to City Council and other concerned parties. k. Assure that all system components integrate successfully including with existing legacy systems. I. Continue to manage overall technical implementation and the introduction of new Web Portal and Demand Response systems. m. Troubleshoot and resolve technical, functional, performance, and integration issues B. Provide DR Phase 2 implementation support. Support meetings, questions, issues that come up, and analysis of Comverge contract and positions as needed. C. Revisit business process workflows and diagrams to update with Utilities changes and lessons learned in AMI operations. Create additional workflows for web portal and demand response phases consistent with'operational transition document. D. Provide web portal marketing support through June 2015, including surveys, tracking, and optimization to maximize web portal and smart grid solution adoption. E. Support planning and strategy around MV Web replacement. Develop plans and support meetings around developing strategy, options, and impactsfbenef is of different approaches. F. Assist in infrastructure IT knowledge transfer, including compiling IT processes, updating system architecture diagrams, and organizing various technical documentation. Prepare and contribute to technical transition meetings. II. Schedule The period of performance for work order #14 is from January I, 2015 to July 1, 2015 III. Staff The key personnel who will execute Work Order #14 are identified in Table 1. Table 1 Work Order #14 Excergy Staffi r Program Management 1Project Director Jim Ketchledge olution Architecture and Project Engineering Solution Architect Adam Tonkin Continued Implementation (DR, WP, DMS) Principal Consultant MarkHatfield Utility & Consumer Communications ommunications Specialist Lynn Adams est Engineering rincipal Consultant Djifa Amefia a-.... & Y.�� T .x��f:. r xs^ r}. ,.,'R-x}', IV. Compensation Costs are based on estimated hours required for tasks listed in Statement of Work and hourly rates as referenced below. The estimated labor compensation based on estimated hours toperform above tasks on time and material basis is shown in Table 2. Note that for work order p14 Excergy is using Year 2013 rates, rather than the pi6viously negotiated Year 2015 rates. Table 2 Work Order Btd Tmck Vrim ]&Hmata onttnued lmpiementa[ion /Principal $198 36 $7;128 nsultant Solution Architecture / Solution $198 388 $76,824 rchitect Communications Specialist $219 40 $8,760 ommunirations Specialist Project Management/Project Director $219 308 $67.452 est Engineering/ System Engineer $198 120 $23.760 Estimated Travel and Expenses da $15 000, Total 892 $198,924 Reimbursable Direct Costs Reimbursable dived costs take the form of travel related costs. Total travel costs for the period of performance are estimated at $15,000. Maximum Compensation The maximum compensation for both labor time and reimbursable direct costs as a "not to exceed" is summarized in Table 3 January 1, 2015 3 $183,924 $15,000 1 $198,924 x 11 ^. �� f,.' t �" •':xY:t � c x v"x r, `vim {�yr=� : C Y'i .4. 21 w, ti -� This work Order is agreed to by: u THE MY OF FORT GOWNS, COLORADO By - Dennis Sumner, Project Manager Date: 20, 4 By. S ve C" at�anach: UP Operations Manager Date: By: Kevin Gertig, Utilities Executive Director (greatei than $1,000,000) Date: By: Director of Purchasing & Risk Management (greater than $60,000) Date: 4