HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9146989 (2)EXHIBIT'A' WORK ORDER FORM. PURSUANT TO AN AGREEMENT BETWEEN THE CITY.OF FORT COLLINS 'AND MWH . DATED: November 4, 2014 Work Order t4imber: M-WRF-2614-16 Purchase Order Number. 9146989 "ad Tole: Drake Water Reclamation Facility (OWRF) South Process Train (SPT) Biological Nutrient Removal(BNR) and Equipmenl'Replacemertt Project Engineering Services During Construction (ESDC) Commencement Date: November 4, 2014 Completion Date: April 01, 2016 Maximum Fee: (time and reimbursable direct costs): $393,248.17 (with $77,987.22 to be allocated for work In 2014) Project Description: To provide Construction Management;Servloes (CMS) Including on -site inspection and engineering services during construction of the Drake South Process Trains (SPTs) Improvements. Scope of Services: See attached ExNbh'W On the City of Fort Collins: the th the terms Submitted end in the By: s parties. In Link Mueller, Project Manager ane avers on a conrua oetween or In the terms of the;Senlces Age shall control. The attached Exhibit'B" consisting of five (5) pages, plus figures and tables, Is hereby accepted and Incorporated herein by this reference, and Notice to Proceed is hereby given. MWH By: ' -Robert Armslrong, Regional M eager Date: i op: Purchasing Professional Date: /I 2d1y Reviewed 1A By;' ZL wen'L. OChief Enginee Date: &4.? hs! Accept By: ' CA eoc" WEBS, W816—rrOSOUF688 � S Treatmee�Mj Operations M er Ate. Y11411114 aul, Director of tng &'Risk Management Date. % t EXHIBIT "B" WORK ORDER NO. M-WRF-2014-16 DWRF SPT BNR & EQUIPMENT REPLACEMENT PROJECT ENGINEERING SERVICES DURING CONSTRUCTION SCOPE OF SERVICES PROJECT SCHEDULE • Contract Commencement Date: Nocetnbcr 1, 2014 • Contract Completion Date: April 1, 2016 • Construction schedule to be provided by Ilydro Construction Inc. FEE ESTIMATE • Pecs shall be on a time and reimbursable direct cost basis with a not -to -exceed limit • Sec Table B-1: Rate Schedule • See Table B-2: Fee Estimate • Not'Io-Fxeeed Total amount = $393,248.17, separated into'_ parts: o 2014 Ftigineering Services During Construction: $77,987.22 o 2015 Engineering Services During Construction: $315,260.95 Table B-2 shows the breakdown of funds that will be allocated for 2014 and then the remaining tasks. The tasks to be started in 2014 include the project setup costs, the partnering session, and two months of engineering services during construction scope. The remainder of the work will not start until 2015. SCOPE OF SERVICES '['his scope of work submitted to Fort Collins l:tihties (17CU) by MXVII Americas, Inc. (\I\\'l l) covers the Ftigincering Services during Construction (ESDC) for the Drake Water Reclamation Facility (D\\RI-) South Process 'Drain (SPI� Biological Nutrient Removal (BNR) & ligttipment Replacement Project. The 2014 DW11F SM and 1% Ui mein Replacement protect, which is the design phase of' this work, will be used as the basis for this cork. Services provided be MWI I and our subeonsultant shall consist of the tasks, activities, and deliverables described herein, and shall be based on the assumptions provided herein. 'I lie tasks to be completed under this scope of work are listed below and described in further detail herein. • Task 1 — Project administration • 'Task 2 — Construction \lanagenrvnt Services For the D\\'Rh SPT BNR & Replaceman Improvements Project, FCC' will contract with Ditesco directly for onsite resident project representative (RPR)/ Construction Managements Services ((:\IS); thus, Ditesco is not a subconsultant to \I\\'[1. For the SPI' MV I I Exhibit B: Page 1 of 5 November 4, 2014 construction services, \MRC'H's has modified our scope from CMS (per previous projects) to ESDC to clarify that the bulk of this consulting work will be offsite consulting engineering provided bt 1i\C'{-1 and its electrical and instrumentation and controls subconsultant, Carollo. Some site visits b} JT\\'H/ Carollo will be completed per the assumptions listed below. TASK 1- PROJECT ADMINISTRATION Objectives • Develop project setup documents • Provide oversight of technical progress, budget, schedule, and qualir- relating to ESDC. • Provide coordination and communication with project team members (FCU, Carollo, Hydro, Intersta[cs, Ditesco, and M\\11). Activities LI General 'Management & Conrdination • Gcncral Management and Coordination • Project Setup • Develop and maintain the following internal and external project control documents and systems for ESDC: • Financial Status 'Monitoring • Invoicing • Project Schedule • Project Execution Plan • Qualm Management Plan • ProjectWisc Document Management System • i {calth and Safer Plan • Risk Alanagement Plan Assumptions • 17-month project construction duration from onset of submittals through completed as-budt drawings (November 2014 through April 1_016). Nearly all construction activities for the Project arc expected to be completed by November 30, 2013; the additional months arc included in this scope to account for completion of final record drawings. • "the pmject control documents ss� be updates of the ones produced under the design contract. Deliverables • Jlonthlc Invoices • Monthly Status Reports '\lWl I I?xhibit 13: Page 2 of 5 November d. 2014 TASK 2 — CONSTRUCTION MANAGEMENT SERVICES Objective • Provide mainly off site LSD(, and Site Visits for Observation of Construction as described below. Onsire RPR/CNIS will be provided under a separate contract bY Ditesco. Activities 2.1 Construction iAIcctings 2.1.1 Weekly and bi-weekly phone-in construction meetings shall occur one day each week for 13 months total (November 2014 through November 2015) , assuming 1 hour per phone-in meeting. Jlecting agendas, construction logs (RFI, submittals, el,:) and meeting notes shall be completed by Diteseu and/or hydro Construction. Construction schedules shall be completed by Hvdro Construction prior to each meeting. 2.1.2 For one weekly construction mcering each month for 13 months, 13 total unsite. Visits inclusive of the construction meetings (November 2014 through November 2015). \f\\'H shall send engineering staff to D\\RF for in extended onsitc meeting and site Visit. JIVII has budgeted 12 hours per month for routine onsitc Visits. ^_.1.3 In addition, i\I\C'11 has budgeted for two additional, 6-hour unsite Visits to occur after November 2015) to help in punchlist,stirtup activites, and/or is- builting prior to final project closeout. 2.1.4 This task also includes attendance at dtc .11ternariVe Product Delivery System Partnering session by 3 members of NRVII and 2 numbers of Carollu. 2.2 Process %lechinical Engineering Services During Construction 2 2.I Submittal review (I011 submittals assumed) 2?3 Review shop drawings and other submittals 2.2.3 One MWI i process mechanical engineer to attend a blower stand test arid a factors acceptance test of the complete controls system. KIWI I has included, including two trips for two complete days to Springfield, \fO (roundrrip airfare, food, and car rental included). 2.2.4 Review R171S 2.25 Review O&M Nlanuils 2.2.6 Develop Final Record Drawings based on record drawing set (maintained and provided be others) 2.2.7 Ditesco and Hydro to develop SPT startup Plan — \f\Y'I I shall review as a submittal. 2.2.9 Stirrup onsite process mcchanical engineering shall include: 2.2.8.1 Three (3) 8-hour digs of onsire support for blower systent checkout/startup 2.2.9 Sixteen hours of miscellaneous Visits and to develop a Process-Mechanicil Punchlist. 2.3 Structural 2.3.4 RcNicw shop drawing and other submittals (review quantity included in 2.2.1) INAVI I Exhibit B: Page 3 of 5 November 4, 2014 2.35 Four (4) site visits of G hours each for onsite inspection, meetings and/or support (24 hours onsite help total) 2.3.6 Review RFIs 2.3.7 Develop Final Record Drawings based on record drawings (provided be others) 2.4 Electrical & Instrumentation and Controls (E/I&C) Engineering During Construction Services (Carollo) 2.4.1 Over the phone Construction \leetings, as described in Article 2.1.1 2.4.2 Onsitc Observation of Construction and Construction Meetings, as described in Article 2.1.2 2.4.3 Review shop drawing and other submittals (30 submittals assumed) 2.4.4 One Carollo engineer shall attend the blower factor- test in Springfield, \IO (two days, roundtrip airfare and food) 2.4.5 Review RFIs 2.4.6 Develop Final Record Drawing, based record drawings (provided be others) 2.4.7 Review O&M 'Manuals 2.4.8 Electrical Svstem Studv 2.4.9 Review Ditesco/ Flydro startup plan, treating it like a submittal review. 2.4.10 Develop 1_'%I&C Punchlisr 2.4.11 Develop Control Descriptions. 2.4.12 Startup onsite F/I&C engineering shall include: 2.4.12.1 32 hours in up to four trips for miscellaneous equipment checkout/ loop resting/ startup services. 25 Record Drawings Final record drawings will be printed with 3 full size (22" x 34") paper drawing sets for FCU records. along with a D\'D including all the Projects ise ides. Digital files of the final drawings shall include full sire and half size sets. Ass um rions • In addition to assumptions below, see assumptions listed in above tacks • \I\\'H Client Service Manager/ Project Manager ru attend four scheduled onsite meetings. • \i\C'l 1 and Carollo are not responsible to review and/ or approve pav applications. • M\CI I project Manager and one project Engineer to visit site once per month for meetings and/or construction observation • Construction meetings and onsite visits as described above • All phone-in meetings arc assumed to be ]-hour in duration. • All meetings arc assumed to be held in Fort Collins at the Drake V FJ-. • Assumptions regarding the number of submittals and RFIs and estimated review times that this scope of services is based upon are included in the list of Activities above. • 'Tune for one senior engineer to attend two blower witness test (travel and lodging to be paid for be manufacturer), assumes 2 days for two trips (4 days total). MWI-I Exhibit B: Page 4 of 5 November 4, 2014 • 1lydro and Ditesco will develop a single set of as -built drawings to deliver to %RX'H for creation of the final record drawings Deliverables by MWI I' • Documentation of issues and concerns Punchlists (by DfWH and Carollo) Final record drawings will be printed with 3 full size (22" x 34") drawing sets for FCU records, along with a DVD including all the ProjectWise tiles. Digital tiles of the final drawings shall include full size and half size PDF,. Project Close -Out Paperwork NAVI I Exhibit B: Page 5 of 5 November 4, 2014 TABLE' B-1 WORIK ORC6'W. 4*RF40!4.-1!6 OWRIFIElFrOWAND VIIIEWIFIERACENIMPROJOCT ENGINEERING S,qRVWkszuRwa co"mucnm JAWH RATE SMEDULE Personnel Classifficatlan Hourly Rate Pitncipal Technical Adviser, $250 Pdricipal Praitessloinal, $195 Super4ilng Pirc6s's' lonal $165 Senior OWessional $145 Prallesilonal $115 Assoclaia Professional $195, Supervising Designer $130 P"for Designer $105 Designer. 4$95 ssrvkir Adininistiatof $95 Admiriabimve Assistbrit $85 Receptionist $65 Rates for.OUw Direct Che O"Ifir Direct Charge! Associated Project Costs $9.50flabor hour ,Mileage Current Federal Rate CAD Computer Usage $18.00/hour ODC and Carollo Markup 15% MINH Table B-.1: Page 1 of 1 NoWmber4,2014 '� g IIF9Cf4_ i FJF ' k. l'.�. • .• *y I ISEBa J ppyy ( •°IA§ 5'faF$]S PC e$F�6!•• 8 ,ig 8 248!l446gA, A fiI, fill;PaR I �• .F�vg . L i n i i I i r m r:1 {{ 99 yp v 1 i jj 3 art Collins > I Date: 11/2612014 Vendor.: 113176 AM AMERICAS INC 1861 CALIFORNIA ST'02900 DENVER CO 80202-2806 PURCHASE ORDER PO Number .. ?area 9746989. 110112 fainumber must appear n all invoices, packing I s amf labels. Ship To: DRAKE WATER RECLAMATION CITY OF FORT COLLINS 3036 ENVIRONMENTAL DRIVE FORTCOLLINS C0 86U6. Del" Date: 11l2S12014 Buyer: PAT JOHNSON .Note: Line Description Order d UOM Unit Prim Extended Price CONSULTING SERVICES 1 LOT LS 77,987:22 - WO 11M-WRF-2014-16 Construction Management Services including on4site Inspection and engineering services during construction of the Drake South Process Train Improvements. Total cost Is E393.248.17, with $77,987.22 allocated for work in 2014. .CIry of Fat CoUns Director of Purchasing and Risk Manadin"M This order li,not valid over $500eunless signed by Gerry S. Paul ,C YAFort.CoA ns,Purclosing., PO BOX 580, Fort Collins, CO 80522-0580 Phone.970-221 6175' Fax: 970-221-6707 rFnd:purdresing®kgov.00m, Total . $77,987.22_ Pay terms net 30 days Invoice Address: City 0 Fort Collins Accounting Department PO BOX 580 Fort Coiling, CO` 80523r0580