Loading...
HomeMy WebLinkAbout539869 VOGEL CONCRETE INC - PURCHASE ORDER - 9150319 (2)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. DATED: 12/01/2014 Work Order Number: 1-VOG-902070-2014STCPOND Purchase Order Number: Project Title: South Transit Center Detention Pond Repairs Original Bid/RFP Project Number & Name: 7391 (Annual Concrete Maintenance Contract) Commencement Date: 11/01/2014 Completion Date: 12/12/2014 Maximum Fee: (time and reimbursable direct costs): $16,600.00 Project Description: Repair Detention Pond Scope of Services: Vogel Concrete. INC is to repair deficiencies in the detention pond for the South Transit Center. In its current condition, the detention pond was excavated too deep, and does not allow the water to Flow to the outlet structure causing large amounts of ponding. Repairs will raise the pond bottom elevation, add a 2' concrete valley pan and re -grade side slopes for positive now. Vogel services are provided through an existing federally procured contract with the City and they have the ability to complete construction in a time e Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Profes{siiooatat �% � Date: 12/01/2014 fficient manner. City of Fort Collins) By: Erika Keeto Project Manager Date: 1210112014 By: Gerry Paul Director of Purchasing and Risk Management (over $60.000.00) Date: