Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7597 SENIOR CENTER AV PROJECT (2)CHANGE ORDER NO. 02 PROJECT TITLE: Fort Collins Senior Center Expansion CONTRACTOR: National Speaker & Sound PROJECT NUMBER: 7597 DESCRIPTION: Additional Scope of Work Fort Collins In preparing change orders show In order as separate numbered paragraphs the following: 1. Reason for change: Staff has requested to add AN items to the project z Description of change -Add � 3. Change in contract cost and receptacles in MU 4 & 5 and three floor box covers in 4. Change in contract time: Change completion to July 31. 2014. (Attach additional sheets as required) ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER Total C.O. %e of Original Contract ADJUSTED CONTRACT COST Assumino all chanae orders aooroved 2.98% -13,93% $136,000.00 -$23,000.00 $0.00 $117,050.00 ACCEPTED BY: 17�3n fi� Contra is Representative MAOartinez Date ACCEPTED BY: S S Project pager_ en H tt atee �}e e o REVIEWED BY: �p�`•J/(, 414 Print Name Bob Adams - Recreation Director Ie APPROVED BY: Dom- i,- PN Avra'v l & 0 Print N Ken Mama, - operelon Services Maim Dafte APPROVED BY: Print Name Date If over $60,000 - Purchasing Director ox City Clerk Project File Contractor Purchasing Engineer National Speaker & Sound 1559 So. Broadway Denver, CO 80210 Phone:303-777-4970 Fax:303-777-2351 www.nationalspeaker.com Bill To: Brian Hergott City Of Fort Collins Accounting Dept Po Box 580 Fort Collins, CO 80522-0680 tluom--13k0.. U-79/21(014 10. Expires: 7i291,015 Suliatl:.I Account: 1883 Code9702216738 By: W: 970 771-6738 Page 1 Terms: N 30 Mark - Contracting Ship To Brian Hergott City Of Fort Collins Accounting Dept Po Box 580 Fort Collins, CO 80522-0680 Nola: 7r9r(114 10.53AAI Change orckr for the micropham Plata and canlmkr For fox I and 2. and also the 3 additional Itom box corm fu the auditorium. �'D`�ncripl!aa '""' wimt ti" , - .1 Oi'� scent s, `�tTmd „t7, ... _ - - I RAPSPYDF 12 GANG PLATE Wmi TWO FEMALE XLI..._. zouI 1 0.001 0.001 0.001NI I BIAREDI (CONTROL I ?WI 1 0.001 0001 0001NI I CABLE IMISC I 1.001 1 0.001 0.001 000I NI I PROGRAMMING I PROGRAMMING I 1.001 I 0001 0.001 0.00 I N I I LABOR I LNiOR I LOD I 1 0.001 0.001 0.00 I NJ I ACra245LBK I srANDARD LID BLACK 1 3.001 I 0.001 0.001 0.00I NI I SYSTEM I SYSTEM PER CONTRACT 1 1.001 I 4050 001 0.0111 4050.00 IN I SubTotal: 4,050.00 no tax: 0.00 TOTAL: 4,050.00 THANK YOU FOR YOUR BUSINESS Policy stu mcm Coca hen! ,4vow pROss N L unA q 1ST R & SO National Speaker & Sound —1559 South Broadway— Denver, Colorado 80210 Office (303) 777- 6400 — (800) 748-2213 — Fax (303) 777-2351 Change Order Request #1. dditional microphone receptacles in MU-4/5 Total cost of $2,100.00 Includes 2 plates mounted on wall of each room with 2 microphone Inputs per plate, wire, installation, programming and 2 Biamp Red I Controllers mounted in each room to control local volume of microphones and AN system. #2. Preview Monitor in control booth rack for DVD player Total Cost $1,225.00 Includes 1 Tote Vision LCD-703HD1 rack mount preview Monitor, wire, and installation 93. Rack Mount VGA. HDMI, and 1/8 audio plate Total Cost $1,150.00 Includes additional SVSI Encoder, wire, programming, installation #4. loor Box covers and insert plates already approved by Brain Qty of Three $1,950.00 Total Cost of All changes $6,425.00 Thanks Mark National Speaker