Loading...
HomeMy WebLinkAboutCHANGE ORDER - AGREEMENT MISC - DITESCO LLC (2)CHANGE ORDER NO.1 11+1r PROJECT TITLE: DDA Old Town Square Renovations PROJECT MANAGER: Ditesco PROJECT NUMBER: We PURCHASE ORDER NO.: 9141272 DESCRIPTION: (See below) 1. Reason for change: The reason for this contract change is to amend the contract value to include additional services to the Downtown Development Authority for the Renovation of Old Town Square. Ditesco has contracted with CTL Thompson, Inc. to provide Geotechnical services during the design phase of the project and contracted with King Surveying to provide additional survey of Linden Street. Additional services were also provided through Ditesco's subcontractor, Slate Communications, to create a marketing video for the Old Town Square Ghost Sign Kids -Starter campaign. I 2. Description of Change: The description of the contract change Is summarized below and attached hereto as Exhibit A, B and C j The contract addition for CTL Thompson's work authorized CTL Thompson to drill two (2) geotechnical bore holes for soils sampling in Old Town Square. King Surveyor's was solicited to provide additional horizontal layout survey of Linden Street. Slate Communications provided videography and post - production services to create a video for the Ghost Sign Kick -Starter campaign. The costs associated with each addition are summarized below: Exhibit A - CTL Thompson Contract Addition - $3 500.00 Exhibit B -King Survey Contract Addition - $1,750.00 jExhibit C -Slate Communications Contract Addition - $2,457.08 3. Change in Contract Cost: $7,707.08 4. Change In Contract Time: None TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST ACCEPTED BY: -may DATE: Project Manager ACCEPTED BY: DATE: Owner if APPROVED BY: DATE: Ftrlc.�nvf t cc Owner Pmject Fle Project Manager m jl� '71'. JfP: ditesce 43:119h11 AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT Is made and entered into this 169, day of September.2014, by and between Dfresco. JLrd. whose address Is 1315 Oakridge Drive Suite 120 FoA CalCallins CO 8052E hereinafter referred to as 'Prime Consultant', and King Surveyorswhose address Is 550 East Garden Drive, Windsor. CO 80550, hereinafter referred to as 'Subcontractor.' WITNESSETH: WHEREAS, Prime Consultant is in need of hiring an Independent Subcontractor to perform professional services. Professional services ordered under this contract are defined as a bask survey for horizontal layout of Linden Street. This description generally comprises the Scope of Work, as defined In the attached Exhibit A. WHEREAS, Subcontractor has the time available and Is willing to perform the Professional Services according to the terns of [his Agreement. NOW, THEREFORE, In consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows: TERM: The term of this Agreement shall be from September 16, 2014through and until survey completion on or before December 31, 2014, 2. SERVICES PROVtDED BY SUBCONTRACTOR: Subcontractor agrees to perform tine Professional Services as denned In Exhibit A, Scope of Work, for the compensation provided below. COMPENSATION: Prime Consultant agrees to pay Subcontractor for all services performed hereunder at a not to exceed value of $1,750 (one -thousand. seven -hundred fifty dollars) for horizontal layout survey services, as defined in attached Exhibit A. The Prime Consultant further warrants that it has sufficient funds for payment of fees provided for In this agreement. Compensation shall not be based upon project approvals, financing or any other outcome. 3. INOEPENDENT CONTRACTOR: Subcontractor agrees that he or she Is an Independent contractor and will not become an employee of Prime Consultant, nor Is he or she entitled to any employee benefits from Prime Consultant as a result of the execution of this Agreement. 4. PROPERTY: Subcontractor agrees that all work products produced under this contract shall become property of the Owner with copies provided to the Prime ConsultanL 5. INDEMNIFICATION DESIGN AND INSURANCE: Subcontractor agrees to Indemnify Prime Consultant, Its members, managers and employees, against liability for Injury or damage caused by any negligent act or omission by Subcontractor In the performance of Unix Agreement and shall hold Prime Consultant harmless from any loss occasioned as a result of the performance of this Agreement. Prime Consultant agrees to Indemnify Subcontractor Its officers and employees against liability for Injury or damage caused by any negligent act or omission by Prime Consultant In the performance of this Agreement and shall hold Subcontractor harmless from any loss occasioned as a result of the performance of this Agreement Subcontractor shall be responsible for the professional quality, technical accuracy, finely completion and the coordination of all services rendered by Subcontractor and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. Page 1 of 3 ditesco PM*1 &ComtMKUW SV B. NON -ASSIGNMENT: Subcontractor may not assign or transfer this Agreement, any Interest therein or claim thereunder, without the prior written approval of Prime Consultant. 7. TERMINATION: Either party may terminate this Agreement at any time by providing the other party with a 10-day written notice thereof. Furthermore, this Agreement may be terminated at any time without notice upon a material breach of the terms of the Agreement. In the event of termination, payment shall be due for all services and reimbursable expenses Incurred through the date of termination. 8. TIME OF THE ESSENCE; Time Is or the essence In each and all of the provisions of this Agreement 9. IAW/SEVERAUILITY; The laws of the Stale of Colorado shag govern the construction, Interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held Invalid or unenforceable by any court of competent jurisdiction, such holding shall not Invalidate or render unenforceable any other provision of this Agreement. 10. ACCEPTANCE NOT WAIVER: Prime Consultant's approval of drawings, designs, plans, specifications, reports, and Incidental work or materials furnished hereunder shall not to any way relieve Subcontractor of responsibility for the quality or technical accuracy of the work. Prime Consultant's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to Prime Consultant under this Agreement 11. NOTICES: Written notices required under this Agreement and all other correspondence between the parties shall be directed to the following and shall be deemed received when hand -delivered or three (3) days after being sent by certified mall, return receipt requested: If to Prime Consultant: Dltesco, LLC Keith Meyer, P.E. 1315 Oakridge.Drtve, Suite 120 Fort Collins, CO 80525 If to Subcontractor. IQng Surveyors Larry Pepsk 850 East Garden Drive Windsor, CO 80550 12. ENTIRE AGREEMENTIMODIFICATIONS: This Agreement constitutes the entire understanding between the parties with respect to the promises and covenants made therein. No modification of the terms of this Agreement shall be valid unless made In writing and agreed to by both parties. Page 2 of 3 ditesco Pmf•cf 6 Comilmikm Sam e, IN WITNESS WHEREOF, the parties hereto have signed this Agreement this 17 day of Zft - ATTEST* By; he ` e Name:Z&* JzFtvef Tiller Dale 9-1 7' %/q SUBSCRIBED AND SWORN to before me this ,1 day of WITNESS my hand and official seal. My commission expires: Notary Public CAHIBSA E Notary PuStele ofColoNoiuy ID 20081My Commiselon Expire2018 Page 3 of 3 No Text U 1- m 2 X W 00 too00omom 00 0 rm O O N O O o 0 N 0 1� O O O 00 _ 00 00 O In OG o0 06 oo t.: t0 ui o0 00 o0 01 " 00 00 k6 .4 4D Y14 N fl "1 to r w CL 0 u Y ul f0 O/ � to Ln In N O 4 n 'i 'i 'i N n a-1 N •-1 00 CDo v of o N V 7 O S N i 0o 00 n 00 n n 00 00 n :0.. 00 0 tow 0o m tow 00 m 0 w 00 0 0 0 to L 3 O S N C C m O 12 bo Gl Mn CL M L C `1 41 " C � C � C � : C 0 �O m ru {A U U C U U K U U OFU U 0C � K 4 co w v m a �- c w > N O C C O '��+ O C_ N W Y V CL O m L L C 7> Y_ Yto to _V `o CL o 0 0 ;; o c C m m L t m '� .' C C fA .O F- 70 O • CL E C v w d o m m v c iE 00 U 00 00 L Y\ t i N L u a+ c c` 3 '� N N tw m Ow0 w m 01 w in m m C C m �' > '> O O C C a+ 01 "O 'D A W m m u a�w+ .rw' v w cc): T d O N t �- �aa �Inlnln»wwu mt, 00 ManEXHIBIT AGREEMENT FOR PROFESSIONAL SERVICES THIS AGREEMENT is made and entered into this 411, day of August, 2014, by and between Ditesco. LLC whose address is 1315 Oakddge Drive, Suite 120, fort Collins. CO 80525, hereinafter referred to as "Pdme Consultant", and CTL Thompson, whose address Is 351 Linden Street, Suite 140, Fort Collins. CO 80524. hereinafter referred to as "Subcontractor.' WITNESSETH: WHEREAS, Prime Consultant is in need of hiring an independent Subcontractor to perform professional services. Professional services ordered under this contract are attached hereto as Exhibit "A' and comprise the Scope of Work to be provided by the Subconsultant. WHEREAS, Subcontractor has the time available and is willing to perform the Professional Services according to the terms of this Agreement NOW, THEREFORE, In consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows: 1. TER : The term of this Agreement shall be from August 4.2014, through and until survey completion on or before October 1. 2014. 2. SERVICES PROVIDED BY SUBCONTRACTOR: Subcontractor agrees to perform the Professional Services as defined in the Scope of Work, above, and as attached in Exhibit A. COMPENSATION: Prime Consultant agrees to pay Subcontractor for all services performed hereunder according to the amount set forth in the Scope of Work as $3,500 (three -thousand, five - hundred dollars). The Prime Consultant further warrants that it has sufficient funds for payment of fees provided for In this agreement. Compensation shall not be based upon project approvals, financing or any other outcome. 3. INDEPENDENT CONTRACTOR: Subcontractor agrees that he or she is an Independent contractor and will not become an employee of Prime Consultant, nor is he or she entitled to any employee benefits from Prime Consultant as a result of the execution of this Agreement. 4. PROPERTY: Subcontractor agrees that all work products produced under this contract shall become property of the Owner with copies provided to the Prime Consultant. 5. INDEMNIFICATION, DESIGN AND INSURANCE: Subcontractor agrees to Indemnify Prime Consultant, its members, managers and employees, against liability for injury or damage caused by any negligent actor omission by Subcontractor in the performance of this Agreement and shall hold Prime Consultant harmless from any loss occasioned as a result of the performance of this Agreement. Prime Consultant agrees to indemnify Subcontractor its officers and employees against liability for injury or damage caused by any negligent act or omission by Prime Consultant in the performance ,of this Agreement and shall hold Subcontractor harmless from any loss occasioned as a result of the performance of this Agreement. Subcontractor shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by Subcontractor and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. Page 1 of 3 ditesco 6. NON -ASSIGNMENT: Subcontractor may not assign or transfer this Agreement, any interest therein or claim thereunder, without the prior written approval of Prime Consultant. 7. TERMINATION: Either party may terminate this Agreement at any time by providing the other party with a 10-day written notice thereof. Furthermore, this Agreement maybe terminated at anytime without notice upon a material breach of the terms of the Agreement In the event of termination, payment shall be due for all services and reimbursable expenses incurred through the date of termination. B. TIME OF THE ESSENCE; Time Is of the essence in each and all of the provisions of this Agreement. 9. LAW/SEVERABILITY: The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 10. ACCEPTANCE NOT WAIVER: Prime Consultant's approval of drawings, designs, plans, specifications, reports, and incidental work or materials fumished hereunder shall not in any way relieve Subcontractor of responsibility for the quality or technical accuracy of the work. Prime Consultant's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to Prime Consultant under this Agreement. 11. NOTICES: Written notices required under this Agreement and all other correspondence between the parties shall be directed to the following and shall be deemed received when hand -delivered or three (3) days after being sent by certified mail, return receipt requested: If to Prime Consultant: Ditesco, LLC Keith Meyer, P.E. 1315 Oakridge Drive, Suite 120 Fort Collins, CO 80525 If to Subcontractor: CTL Thompson Spencer Schram, PE 351 Linden Street, Suite 140 Fort Collins, CO 80524 12. ENTIRE AGREEMENT/MODIFICATIONS: This Agreement constitutes the entire understanding between the parties with respect to the promises and covenants made therein. No modification of the terns of this Agreement shall be valid unless made in writing and agreed to by both parties. Page 2 of 3 ditesco IN WITNESS WHEREOF, the parties hereto have signed this Agreement this day of llL�fti / i4= T u. Name*./Tl� /�/EyEi2 Title: SUBCONTRACTOR: By: Name: SD//��en ,� 54,0 t Title: t-�oi P.t4 fi)axg5 2.r— Date 8L5fwl SUBSCRIBED AND SWORN to before me this _b*L day or /k, +was �� . 1014 . WITNESS my hand and official seal. Notary Publicly - (� My commission expires: 3, ,.e 11 r 'Lot TMMORMS IWMWRW() STATE OF0010 A00 NDTMY1020141023616 WCOMMISSION DM SM 13,2019 Page 3 of 3 CTLITHOMPSON August 1, 2014 (Revised August 4, 2014) Ditesco 1315 Oakridge Drive - Suite 120 Fort Collins, Colorado 80525 Attention: Jill Burrell, El Subject: Proposal for Geotechnical Investigation Old Town Square Renovation Fort Collins, Colorado Proposal Number: FC-14-0301 Revised CTLIThompson, Inc. (CTL) is pleased to present this proposal for geotechnical engineering services related to the proposed construction at the subject location. Our understanding of the project is based on the City of Fort Collins Request for Proposal (7595 Old Town Square Reno`vation): -We.understand geotechnical services for the improvements will be used for pavement, drainage, hand structural design. Structural design will likely include designs for stage elements, foundations for canopies over stages and benches, seat wall designs, and foundations for other accessory features. To develop the required geotechnical design and construction criteria appropriate for this project, you have requested we drill two borings, carry out a laboratory testing program and provide you a report summarizing our testing and presenting geotechnical recommendations. We understand the work will need to be completed within the timeframe of 7:00 am and 10:00 am. Borings will be backfilled with pea gravel and pavers removed during our investigation will be replaced. A detailed scope of services is included within the attached Service Agreement- We propose to provide the geotechnical engineering services described for a lump sum fee of $3,500. For any other services you may need with this project, our fee schedule is included with the attached Service Agreement as Exhibit B. CTL will make appropriate effort to complete the work described within a reasonable period. Based on the described project scope, we anticipate completing the project about 3 to 5 weeks following your notice to proceed. Additional work, changes to the project scope, or unforeseen complications due to third parties may require additional time. Our Mr. Spencer Schram will be the Project Manager and your key contact for the geotechnical portion of this project. 351 Unden Street, Suite 140, 1 Fort Collins, CO 80524 1 Phone: 970•206-9455 1 Fax: 970-206-9441 1 www-ctlt.com T If this proposal and the attached Service Agreement are acceptable, please complete, sign, and return a copy for our records. Thank you for your consideration. We look forward to the opportunity to work with you on this project. When you are ready for us to begin work or if you have any questions, please contact the undersigned. Respectfully Submitted, CTL I THOMPSON, INC. 49e-&�Ak- Spencer Schram, PE Geotechnical Department Manager DrrESCO CTLIT PROPOSAL NO. FC-14.0301 REVISED 2 Exhibit A CTLITHOMPSON GEOTECHNICAL INVESTIGATION $3,500 1. Drill two borings in the area of the proposed construction. • Borings will be drilled to depths of 30 feet or to auger drill refusal. • Samples will be taken for additional testing • Groundwater levels will be measured in the borings upon completion. 2. Test some samples from the borings as we believe needed for the analysis. Testing will include gradation, Atterberg limits, swell -consolidation, water-soluble sulfate, and Hveern Stabilometer testing. Soil samples will be retained in the upper 5 feet for future permeability testing, if needed. 3. Prepare a report summarizing the results of the field and laboratory work proposed above, and CTL's analysis, opinions, conclusions and recommendations Including the fallowing: • A general description of the proposed construction site • A location map showing the boring locations • Summary logs of the borings with descriptions of the soilstbedrock and groundwater levels measured in the borings. • Discussions regarding: - recommended foundation types and design criteria; - recommendations for slab -on -grade floors and/or other floor systems depending upon the engineering properties of the ground; - lateral load criteria for design of below -grade walls and retaining walls, if needed; - recommendations for compaction of engineered fill, foundation wall backf ill and utility trench backfill, as needed; - excavation considerations including excavation difficulties, side slopes, slope bracing and temporary dewatering recommendations, if needed; - the acceptability of on -site natural soils and existing fill for reuse as engineered fill; groundwater affects on the proposed construction. A subsurface drain design, if needed, will be provided; - need for special cement In concrete contacting foundation soils if the site soils/bedrock samples are high in water-soluble sulfates; and - pavement section alternatives and construction recommendations. 4. Two hard copies and one digital copy will be provided signed by a Professional Engineer registered in the State of Colorado. DfTrsco Service Agreement Page 5 of 7 CTLIT SERVICE AGREEMENT NO. FC-14-0301 REVISED - Exhibit B IF CTLITHOMPSON p�m nbl Includes analysis and preparation of reports, calculation time, travel, consultation, sample preparation and direct supervision of the CTL Field Investigation Services Coring (2 Hour Minimum) 1151 hour Construction Observation and Testing Services X14108 DITESCO Service Agreement Page 6 of 7 CTLIT SERVICE AGREEMENT NO. FC•14-0301 REVISED Exhibit B IF CTLI,THOMPSON Specialized Testing and Services Environmental Assessment, Remedia6an Design, Underground Storage Tanks, Environmental Quote on Request Drilling and Sampling, Methane Hazard 3114/DS DITESCO Service Agreement Page 7 of 7 CTLIT SERVICE AGREEMENT NO. FC•14-03DI REVISED