PROJECT TITLE: Mason Grade Separation at NRRC -,Steel StalrAw
PROJECT NUMBER: 400903204
CONTRACTOR: Concrete Express, Inc. (13049141051)
1. Reason for change.' 2. Description of change.
3. Change in contract cost 4. Change In contract time.
1&2. See attached sheet for detail.
3. The contract cost will not change. $0.00
4. The contract time willbe extended to December 19, 2014..
ORIGINAL CONTRACT COST
$172.346.00
TOTAL APPROVED CHANGE ORDERS
- $20,050.90
..... _.
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$0.00
TOTAL % OF THIS CHANGE ORDER
-0.00%
TOTAL C.O. % OF ORIGINAL CONTRACT
11.64%
ADJUSTED CONTRACT COST
$192,401.90
(Assuming all change orders approved)
i ACCEPTED BY:
i
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
APPROVED BY:
(Purchasing Agent over $60,000)
cc contractor
Podmsln0
PMW Fla
DATE:
r
— 7--/
IL-1S .
1 're -!S'
I
21
CKANGE OROER
NRRC s Imay Project
,.. ., SUMMARYOFWORK
Item# item Quantity Unit slUnit Total
i Time Extension - 1 I LS 1 $ - $
I(Of INt
The Contract is revised to set the contract compeltion date to December 19, 2014. See attached supporting documents.
PO to Pay App 93
$0.00
CE1
December 19, 2014
Mark Laken
City of Fort Collins — Engineering
281 N. College Ave
Fort Collins, CO 80521
RE: Steel Stairway Assemblies on the Spring Creek Overpass — Extension of Time Count
Request
Mark,
Please let this letter serve as request to extend the contract completion date for the Steel Stairway
Assemblies on the Spring Creek Overpass. Per your letter dated September 25, 2014, the, City of
Fort Collins noted that the shop drawings had been returned to CEI and that all of the City and
FHU's comments were addressed. You also noted that the City of Fort Collins anticipated the
installation in late October, 2014. There were several factors that lead to an anticipated
completion date of late October 2014, and to the actual completion date of December 19, 2014.
CEI.would like to request a substantial completion date of December 19, 2014. .
When Central Denver Ironworks (CDI) began fabrication, it was discovered during a field visit
that the elevation of the Light and Power manhole above the vault was in conflict with the
current design. Further exploration of this conflict resulted in CDI needing to do further
calculations to confirm that the Light and Power vault would support the loads of the stairway
assemblies and foundation system per the design. This ultimately caused a slight redesign of the
west stairway assembly. These conflicts caused CDI fabrication two weeks delay -to their
schedule, which also caused missing the painting window that was scheduled. Missing the
painting window was an additional week delay. This domino effect delayed delivery of the
stairway components and the start of erection in the field.
CEI and CD1 fast tracked this project as much as possible throughout, working with the delays
and conflicts, and is justified in requesting an extended time count on this project. If you have
any questions, please feel free to contact me.
Regards,
os
InM. D'Dea
e President
M27 WEST COLFAX AVENUE I DENVER. COLORADO 80204 I T: 303.562.2000 1 F: 303.893.1949
WE ARE AN EEO EMPLOYER
No Text