HomeMy WebLinkAboutCHANGE ORDER - BID - 7673 NORTH COLLEGE IMPROVEMENTS PROJECT - CONIFER TO WILLOX#14CaW m ilsr�ao�5 Planning, Development & Transportatio City `y oEngineering CollinsC Fort 281 NoM Co8e0e Av P.O. Box 680 � ngin Fo Collins. CO80522.0560 970.221.6605 870.221.6676-tax 1 0 Change Order Form PROJECT TITLE: N. College, Conifer to Willox Project (Phase III) PROJECT NUMBER: 400903950 ( Bid 07673) CONTRACTOR: Zak Dirt (PO 09145479) CHANGE ORDER NUMBER: 1 In preparing change, orders show In order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. . 3. Change In contract cost. 4. Change in contract time. 1.82. See attached invoice for details 711e contract cost will not change. 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: ' u Representative) REVIEWED BY: SUBMITTED BY: APPROVED BY: ME $6,879.077.69 $0.00 $0.00 $0.00 0.00% 0.00% $6,879,077.69 DATE: DATE: �Z DATE: l — �?_ I J DATE: I / ZO _S. APPROVED BY: 1�A2EALA�. DATE: (Department Head) APPROVED BY: (j DATE: (Purchasing Agent over $60,000) w Contractor Pwchaa4p P WIW Foe ($12.4I4.28) Eng1needng.__ ';$12.414.28 Water utilities% North College Conifer to Wilox SUMFAARTOF,WORK-z�`Z Item # Item Quantity Unit $1 Unit Total as neciesled by City of Waterline Field Changes Fort Collins Ili" Water Dept 1 LS $ 12,414.28 $ 12414.28 2 IMinor Contract Revision 1 LS 1 $ (12,414.28)1 TOTAL $0.00 . w �4 REASON FOR CHANGEI�,; 0 The City requested that Big R Bridge install a 1/4" thick by 10" wide metal plate along the bottom chord of the structure to provide an WHEN POSTED I � : .":' �� : . ':l , �, - - I., Posted to Pay App #3 IAL NWZAK To: City of Fort Collins Project No: STE M455 -106 Date: Zak Job No: 11/20/2014 110.15 Attn: Randy Maizland Reference Drawing/Spec/Detail: Revised Water Plan and Profile Change Order Description: This change order is for the additional costs associated with the numerous redesigns of the waterlines on the North College Avenue Improvements - Conifer to Willox project. This change order incorporates the necessary changes to "Waterline B" associated with changing its location farther north to avoid conflict with the existing waterline, the request of the City of Fort Collins Water Department,to change the design of "Waterline B" to facilitate future replacement of the waterline that runs down Hickory Street, the necessary changes to the hydrant run on the NE corner of College Avenue and Conifer Street to avoid conflict with '.'Storm Sewer A," the necessary changes to the profile of "Waterline A to avoid conflict with the existing waterline shown as pothole 109 on sheet 33, and the cost of an additional fitting on "Waterline A" necessary to tie in to the existing pipe found to be at a different elevation than shown on the plans. ':.:Price Char gCforl0/:1TxRedesigniot Water;Linei6?and;Confler.HydranfRUn Description quantity Units Unit Price Bid Total 8X 8 Tee 1 EA $193.38 $193.38 8" Blind Flange 3 EA $1P1.00 $363.00 1 C.Y. Concrete Thrust Block 3 EA $172.43 $517.28 8" Joint Restraint 1 EA $140.69 $140.69 Additional Road Plates/Install 5 EA $660.00 $3,300.00 6" 45' Epoxy Joint 4 EA $169.80 $439.20 6" Mega Lug 7 EA $49.20 $344.40 6" Foster Adapter 1 EA $165.60 $165.66 8" X 6" Swivel Tee 1 EA $290.40 $290.40 6" Gasket Kit 8 EA $17.56 $140.00 Total10/17 Redesign Cost $5,893.95 0� Description Operator Truck Driver an and Pickup Description Cat Excavator Date: Driver ian and Pickup Description _ Cat Excavator M Tools uck Driver borer fireman and Pickup iuip Description 5DL Cat Excavator i0H Loader tndem nail Tools at Description c81t Sht 2 In Blue Board Inch Solid Sleeve asket/ SS Bolt Pack ega Lugs City Hourly Cost Hours Total Cost 2 $64.01 2.5 $320.05 1 $50.65 2.5 $126.63' 1 $47.88 2.5 $119.70 1 $65.76 2.5 $164.40 Equip City Hourly Cost Equip Hrs Total Equip Cost 1 $77.38 1.5 $116.07 Total 11/06 Cost $846.85 11/7/2014 Line City Hourly Cost Hours Total Cost 1 $64.01 8 $512.08 1 $50.65 2.5 $126.63 1 $47.88 8 $383.04 1 $65.76 8 $526.08 Equip City Hourly Cost Equip Hrs Total Equip Cost 1 $77.3B 2 $154.76 1 $54.67 2 $109.34 1 $5.40 1 $5.40 Total ll/07Cost $1,817.33 )lution and Removal of Plastic Casing City Hourly Cost Hours Total Cost 2 $64.01 6 $768.12 1 $50.65 2 $101.30 1 $47.88 3 $143.64 1 $65.76 3 $197.28 Equip City Hourly Cost Equip Hrs Total Equip Cost 1 $77.38 2 $154.7E 1 $63.25 2 $126.5C 1 $54.67 2 $109.34 1 $5.40 1 $5.4( Material City Material Cost Total Material Cost 2 $41.40 $82.8( 2 $137.32 $274.6, 4 $53.88 $215.51 4 $49.69 $198.7( Total 11/10 Cost Road Plate Rental 8 $140.00 $1, Total Waterline Cost $5,042. Roadplates $1,120. Profit $358. Total 11/07 Redesiqn/Delav Cost Total Cost of Waterline Redesigns and Delays $12,414.28