No preview available
HomeMy WebLinkAboutCORRESPONDENCE - CONTRACT - 9147546City of Fort Collins Pago 1 Customer: CITY OF FORT COLLINS-ENGINEERING .Malt Baker --.Oversizing Invoice q /'-l7 Sy6 Invoice Number: 66656 C u stome r N umber: 175561 Invoice Date: 12/17/2014 Invoice Due Date: 111.612015 Company Number: 00292 Remit To: CITY OF FORT COLLINS 117 NORTH MASON STREET P.O. BOX 580 FORT COLLINS, CO80522-0580 Please Return the Enclosed Copy with your Payment Item Description Charges 001 Work Order 175647 - Progress Billing For College and Monroe .Balance Due 61,90477 61,904.77 TERMS AND CONDITIONS Payment is due within 30 days of the invoice date. If you have any questions, please contact samgon@fcgov.com or call 6103. City of For Traffic Operations Itemized Invoice 175647 COLLEGE& MONROE ENGINEERING 12/17/2014 Description: SIGNALS WFO Oversizing - Matt BaKer I1 I PRO -BILL 175501 Y Rebuild traffic signal. Install new CDOT spec poles on all four corners. Drill caissons on southwest, northeast and northwest corners. Install video detection for northbound. saithbound and westbound directions. Work order 171222, Northwest co rner caisson, eastbound video detection camera, and conduit relocation billed to developer. Progress Billing.-.Projectwill be completed in 2015. .............._._................._....... .............. ...... ,... ,.................. . Total Reaular Overtime Extended Description Hours Hours Costs Hours Costs Cost TRAFFIC EQUIPMENT OPERATOR 1 23.00 22.00 $645.70 4.00 $160.86 $806.56 TRAFFIC EQUIPMENT OPERATOR II 26.50 21.50 S867.40 5.00 $236.82 $1,104.22 UTILITY WORKER-STRTS/TRAFFIC 25.00 22.00 $425.38 4.00 $119.76 S545.14 Total Labor Description 12" Green LED - Dialight 12' Red LED - Dialight 12" Yellow LED - Dialight 3/4" Band 3/4" Buckles C256 9 x 12 Ped Button Sign Left 9 x 12 Ped Button Sign Right Backplate - Skybrac 3 Section Concrete, 4000 PSI BZ (CBZ4901) Conduit 2' 90% Elbow Conduit 2" Coupling Conduit 2" PVC Conduit 3" 90% Elbow Conduit 3" Coupling Conduit 3" PVC Double Push Button Adapter Ped Button Station 9" X 12' Pelco Ped Head Clamshell Empty - Left - Y Aluminum Ped Head Clamshell Empty - Right - Y Aluminum yL,40o.s1 Quantity Cost Per Unit Extended Cost 2.00 $36.00 S72.00 2.00 $28.80 S57.60 2.00 $33.30 S66.60 14.00 $1.12 $15.62 4.00 $0.78 $3.12 1.00 $3.66 S3.66 3.00 $3.66 $10.98 2.00 $22.01 S44.02 6.00 5118.68 S712.08 4.00 $1.49 $5.95 4.00 $0.36 $1.44 140.00 $0.72 $100.80 4.00 $5.17 $20.69 4.00 $1.07 $4.27 14000 $1.51 $211.68 1.00 S150.00 $150.00 4.00 $94.80 S379.20 2.00 $149.28 $298.56 2.00 $149.28 S298.56 Page 1 of 2 Pedestrian Countdown Head Module - DL Pole 30 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint Pole 45 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint Pole 50 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint Signal Head 3 Sec 12,12,12 With Visor Signal design and drawings Standard 3 Sec Syk Brac w148" Bands Wall Column Form, 36" Total Materials Description FORD F450 SUPERDUTY W/UTILITY BOX 2013 3500 CHEVY FLATBED UTILITYF450 TRUCK 1998 JOHN DEERE BACKHOE Total Equipment 4.00 $12600 $504.00 2.00 $12,048.00 524,096.00 1.00 $13,785.60 $13.785.60 1,00 $14.031.60 $14,031.60 2.00 $153.60 5307.20 1.00 53,303.26 $3.303.26 2.00 $1 W.18 $234.36 3.00 $20.62 $61.85 Hours Cost Per Hour Extended Cost 13.50 $14.40 5194.40 1.00 $26.40 $26.40 8.00 $12.12 $96.96 8.00 $43.80 $350.40 $668.16 Total- Work Order#175647 $61,904.77 Traffic Operations Use Only Dale Paid CommenlslNotes 51587 DC 6190477 Page 2 of 2