Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCORRESPONDENCE - CONTRACT - 9147546City of
Fort Collins
Pago 1
Customer:
CITY OF FORT COLLINS-ENGINEERING
.Malt Baker --.Oversizing
Invoice
q /'-l7 Sy6
Invoice Number:
66656
C u stome r N umber:
175561
Invoice Date:
12/17/2014
Invoice Due Date:
111.612015
Company Number:
00292
Remit To:
CITY OF FORT COLLINS
117 NORTH MASON STREET
P.O. BOX 580
FORT COLLINS, CO80522-0580
Please Return the Enclosed Copy with your Payment
Item Description
Charges
001 Work Order 175647 - Progress Billing For
College and Monroe
.Balance Due
61,90477
61,904.77
TERMS AND CONDITIONS
Payment is due within 30 days of the invoice date.
If you have any questions, please contact samgon@fcgov.com or call 6103.
City of
For Traffic Operations Itemized Invoice
175647 COLLEGE& MONROE
ENGINEERING
12/17/2014
Description: SIGNALS WFO
Oversizing - Matt BaKer
I1 I PRO -BILL
175501
Y
Rebuild traffic signal. Install new CDOT spec poles on all four corners. Drill caissons on southwest, northeast and
northwest corners. Install video detection for northbound. saithbound and westbound directions.
Work order 171222, Northwest co
rner caisson, eastbound video detection camera, and conduit relocation billed to developer.
Progress Billing.-.Projectwill be completed in 2015. .............._._................._.......
.............. ......
,... ,..................
.
Total
Reaular
Overtime
Extended
Description
Hours
Hours
Costs
Hours
Costs
Cost
TRAFFIC EQUIPMENT OPERATOR 1
23.00
22.00
$645.70
4.00
$160.86
$806.56
TRAFFIC EQUIPMENT OPERATOR II
26.50
21.50
S867.40
5.00
$236.82
$1,104.22
UTILITY WORKER-STRTS/TRAFFIC
25.00
22.00
$425.38
4.00
$119.76
S545.14
Total Labor
Description
12" Green LED - Dialight
12' Red LED - Dialight
12" Yellow LED - Dialight
3/4" Band
3/4" Buckles C256
9 x 12 Ped Button Sign Left
9 x 12 Ped Button Sign Right
Backplate - Skybrac 3 Section
Concrete, 4000 PSI BZ (CBZ4901)
Conduit 2' 90% Elbow
Conduit 2" Coupling
Conduit 2" PVC
Conduit 3" 90% Elbow
Conduit 3" Coupling
Conduit 3" PVC
Double Push Button Adapter
Ped Button Station 9" X 12' Pelco
Ped Head Clamshell Empty - Left - Y Aluminum
Ped Head Clamshell Empty - Right - Y Aluminum
yL,40o.s1
Quantity
Cost Per Unit
Extended
Cost
2.00
$36.00
S72.00
2.00
$28.80
S57.60
2.00
$33.30
S66.60
14.00
$1.12
$15.62
4.00
$0.78
$3.12
1.00
$3.66
S3.66
3.00
$3.66
$10.98
2.00
$22.01
S44.02
6.00
5118.68
S712.08
4.00
$1.49
$5.95
4.00
$0.36
$1.44
140.00
$0.72
$100.80
4.00
$5.17
$20.69
4.00
$1.07
$4.27
14000
$1.51
$211.68
1.00
S150.00
$150.00
4.00
$94.80
S379.20
2.00
$149.28
$298.56
2.00
$149.28
S298.56
Page 1 of 2
Pedestrian Countdown Head Module - DL
Pole 30 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint
Pole 45 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint
Pole 50 Ft Mast Arm W/15' Illuminair - CDOT Specs, Paint
Signal Head 3 Sec 12,12,12 With Visor
Signal design and drawings
Standard 3 Sec Syk Brac w148" Bands
Wall Column Form, 36"
Total Materials
Description
FORD F450 SUPERDUTY W/UTILITY BOX
2013 3500 CHEVY FLATBED
UTILITYF450 TRUCK
1998 JOHN DEERE BACKHOE
Total Equipment
4.00
$12600
$504.00
2.00
$12,048.00
524,096.00
1.00
$13,785.60
$13.785.60
1,00
$14.031.60
$14,031.60
2.00
$153.60
5307.20
1.00
53,303.26
$3.303.26
2.00
$1 W.18
$234.36
3.00
$20.62
$61.85
Hours
Cost Per Hour
Extended
Cost
13.50
$14.40
5194.40
1.00
$26.40
$26.40
8.00
$12.12
$96.96
8.00
$43.80
$350.40
$668.16
Total- Work Order#175647 $61,904.77
Traffic Operations Use Only
Dale Paid CommenlslNotes
51587 DC 6190477
Page 2 of 2