Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7546 DIRECTIONAL BORING & TRENCHING SERVICES�/g7gqS- WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN, THE CITY OF FORT COLLINS AND Colorado Boring Company DATED: December 16, 2014 Work Order Number: CBC-01-400901809-14 Purchase Order Number: ProjectTille: Vine & Shields Intersection Improvements Original Bid/RFP Project Number & Name: 7546 Directional Boring & Trenching Commencement Date: December 16, 2014 Completion Date: January 31, 2015 Maximum Fee: (time and reimbursable direct costs): Not to Exceed $6,000.00 Project Description: Potholing and Utility Locating for existing water line and storm sewer. Additional potholes exceeding estimated quantity may be necessary in order to locate utilities. Scope of Services: See Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Profe tonal By: te:sL City of Fort Collins By: Project Manager Dale: I Z/ )b( ZD ((-( By: Gerry Paul Director of Purchasing and Risk Management (over$60,000.00) Date: COLORADO BORING CO. 3813 Canal Dr. Ft.Collins, CO.80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins Traffic Address 626 Linden St. City, State Ft. Collins, CO. 80524 Phone 221-6816 QUOTE Quote # 6264 Date 12/15/2014 PO # Rep Contact Caleb Feaver QtV Description Unit Price ''Tdta1;;;:•; 0 Trenching $ 7.00$::•:::•:...•:•:• 0 1-2" Directional Bore $ 8.00 .$'.•.'.'.'.'i.':'i.'. 0 1-3" Directional Bore $ 8.00 '$.'.'.'.'.'.''''•'' 0 2-2"Directional Bore $ 9.00 •$''•'•'''•'•'•'�'• 0 2-3" Directional Bore $ 10.50 ;ffi;•:•::•::':•:-:': 0 3-2" Directional Bore $ 11.50 •$:•..::•:•:':':•,•:' 0 1-4"Directional Bore $ 9.00 .$•.•.'.'.','.'.'.'.'' 0 1-4"and l-2"Directional Bore $ 10.50 '$•'•''•'•'''�•• 0 1-4" and 2-2" Directional Bore $ 12.00 $' •' •' •'' •' •' •"•' •= •' 0 1-4" and 3-2" Directional Bore $ 14.50 :{�•;•::::•:•;::-:•. 0 2-2"and 2-3" Directional Bore $ 16.00$.: •.•.'.'.': •. •. •, •.' 0 1-5" Directional Bore $ 10.00 .$'.''•'.'''•'•'='• 0 2-5" Directional Bore $ 15.00 '$•'•'•'•''''•''-'' 0 3-5" Directional Bore $ 17.00 •$':;•:•::;:•:�. 0 1-6" Directional Bore $ 11.00 ;$•:•:•:....•.•.�.•. 0 2-6" Directional Bore $ 16.00 •$.'.'.'.'. •. •.'.'.':'.' 0 3-6"Directional Bore $ 18.00$'•'•'•''•''''•=' 0 Hole Hog Tunneling$ 8.00 '$''•'•'•''''•:-:: 0 Mud Control Vacuum Machine per hour $ 125.00 •$:;;•: •:... •:�•,• 6 Pothole in Paved Surfaces each $ 145.00 .$.•.•.::::87dA0: 1 Pothole in Unpaved Surfaces each $ 75.00 '$.'.'.'.'.'.'.'.75.00• 0 Pothole Crew per day $ 950.00 $''' •' •' •' •'' •' •=' 6 Pavement Pothole Restoration persq. ft. $ 12.Oo ;$;'•:•;•;:7Q:Q0: 0 Concrete Pothole Restoration per sq.ft. $ 14.50 •$::::....-.,. 1 Dirt Pothole Restoration persq. ft. $ 12.00 .$•. •. •....•.•12:00. 0 Replace Sod persq. ft, $ 1.00 '$.'.'.'.' ' '•'•'•'•' ' 0 Replace Paved Asphalt Surface per cubic ft. $ 10.00 $' •' •' •'''' •' •'=' 0 Replace Paved Concrete Surface percu.ft. $ 24.00 ;$;•;•:•::;•:•:•.-;. 0 Sawcut Asphalt less than 4"per ft. $ 2.10 '$.'.'.'.':':':';'•'_':' 0 Sawcut Concrete less than 4"per ft. $ 3.91 .$'.'.'.'. •.•.'.'.'.=.' 0 Core Drill Asphalt less than 4" each $ 45.00 ' $'''' •' •' •'''•' •' 0 Core Drill Concrete less than 4"each $ 45.00 •$;•''':: •:•; •:=•; 0 Install Vault 12%18"-18" $ 45.00 ;;$•;•;•: ;•;•:. �.•. 0 Install Vault 14"-24"-18" $ 55.00 •$.•.•.•.•:•.•.•.'.':'.' 0 Install Vault 24"-36"-18" $ 65.00 .$'.'.'.'''•'•'•'='• 0 Install Vault 36"-48"-30" $ 140.00 ' $ •' ' ' ' •' •' •' ' '•' •' 0 Install Vault48"-96"-48" $ 25.00 •$:::;:•;•:•::=•:• Page 2 QtY Description Unit Price '•'•Total'.'.'.'.' 0 Locate Private Sewer Lateral $ 210.00$'•'•'''''•'•:•;: 0 Locate Private Water Lateral $ 65.00 :$•;•;•:::::•:•:-:•: 0 3Man Labor Crew perhour $ 135.00 •$:.......:-•.' 0 2"HDPE i e $ 0.80 .$'.•.•.•.•.•.'...=.•. 0 N'HDPE pipe $ 1.45'$"""""' 2 Traffic Management DaStandard $ 485.00 •$::•:•: •: •: •:$70:D0 0 Traffic Management Da4Hour Notice $ 685.00 .$•.:::.;•:•:r;: 0 ITraffic Management DaEmergency $ 785.00$.'.'....'.'.'.':'.' 0 LS Additional? m-7am. Weekend $ 210.00 .$'.'.'.'.''''•'•=•' 2 Arrow Board Rental per day $ 65.00 ' .'130:0D' D Flagger perhour $ 38.00 •$;•;•:::;::•:•=•:• 20 Cones each per day $ 4.00 .'$•,•.•.•. •.•.•.•WaD; 5 Sign Panel B per day $ 28.00 '$.'.'.'.'.'.'.'14.0.00 1 Sign Panel A per day $ 28.00 .$'.'.'''''•'28:00. 0 Sign Panel Special perday $ 31.00 '$'•:•:•::';:•:-:: 0 Overnight Closure per day (no monitoring) $ 55.00 ........... 0 1 Ton Truck with Hand Tools perhour $ 18.00 .$•.•....'.':.'.=.': 0 12 Ton Truck with Hand Tools per hour $ 23.00 ' $.'''' •' •' •' •' •'�'' 0 1 Rubber Tire Backhoe per hour $ 96.00 $''' •''' •' -'' •= •' 0 IDouble Axle Haul Truck per hour $ 44.00 :5 ; ; '•:•; :::•:-:•. 0 Equi ment Trailer perhour $ 13.00 •$..•. •. •. •.::, •: 0 Cable Trailer Hydraulic perhour $ 13.00 .$'.'.'.•.'.'.'.'.'.=.' 0 Cable Trailer per hour $ 10.00 ' $ •' •' •' •' •' •''' •'-' •' 0 Air Com ressor with Tools perhour $ 18.00$''•'•'•'•''•''=' 0 Vacuum Trailer per hour $ 75.00 :ffi•:•.•::;;:•:.-:: 0 Vacuum Truck perhour $ 80.00 •$:•.•......:,:' 0 Vacuum Truck3500 gal. per hour $ 101.00 0 Double Axle Dump Truck per hour $ 85:00'$•'•'•'•'•'•'•''•'-'' 0 1 Mini Excavator perhour $ 65.00 $;' ::•.:•...:• 0 Light Tower perhour $ 18.00 :$::•:':•:::;i:': 0 Arrow Board perhour $ 23.00 •$..•.•.•.'....':'.' 0 Innerduct Reel Trailer per hour $ 13.00 .$'.'.'.'.'.'.'''=•'• 0 Jumping Jack Compactor per hour $ 14.00 '$•'''''•''':-;•; 0 Mechanical/Bore Pits $ 300.00$;•;•;;; •: •;::=;• Job Location Subtotal Taxes Total Thank You '$.'.'.'.'' .'.'•' ' $.'.'.'.'.' 2,377.00 2;377.00 Vine Dr. and Shields St. Ft. Collins, CO.