HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL11" 1 C(7-(q a --
WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
VOGEL CONCRETE, INC.
DATED 10/612014
Work Order Number, 09-VOG-400903700-14
Purchase Order Number:
Project Title: East side of Lemav (Parkwood-south to existing)
Original Bid/RFP Project Number & Name: 7658 (Annual Concrete Maintenance Contractl
Commencement Date, 10/20/2014
Completion Date: 1013112014
Maximum Fee: (time and reimbursable direct costs). $37.455.00
Project Description: Install approximately 680 LF of missing sidewalk and seven accessible ramps
Scope of Services:
manager
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. In the event of a
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of one (1) page are
hereby accepted and Incorporated herein. by this
reference, and Notice to Proceed is hereby given.
Professional
By
Date: 101612014 .
City of Fort Collins .�
By RobertMosbey
Project Manager '
Date 10/6/2014
By.
Gerry Paul
Director of Purchasing and Risk Management
(over S60.000 00)
Date.
IL7d;b,,
IFIELD ENTERPRISES:
LEIIVogel Concrete
Bill To
City of Fort Collins
Engineering Department
P.O. Box 580
Fort Collins, Co. 80522
Please Remit To:
6330 S. College Ave.
Fort Collins, CO 80525-4044
Project Location
Lemay sidewalk
Parkwood south
Invoice
Work Completed Invoice #
I IP6/2014 7185
Invoice Date
1 12/5/2014 1
P.O./ Work Order#. Terms
09-VOG-400903700-14 Net 30
Description of Work and Materials
Quantity
Unit
Cost
Amount
Excavation - General Over 50 CY
200.3
CY
35.00
7,010.50
Flatvvork-6"
2,595.18
SF
4.55
11,908.07
Pedestrian Access Ramp
484.62
SF
6.20
3,004.64
Apron - 8"
225.32
SF
0.55
1.475.85
Truncated Dome Panel
24
SF
45.50
1,092.00
Expansion and Caulking
40
LF
3.20
128.00
Vertical Curb and Gutter - No Sidc�valk
5
LF
23.00
115.00
Flollysvood Curb and Gutter - No Sidewalk
4.9
LF
15.50
73.95
Hollywood Curb, Gutter and 6" Sidewalk
2.63
LF
26.00
68.39
Vertical Panel Without Light
148
PEPD
1.10
162.80
Channelizing Barrels
2,120
PEPD
IAO
2.968.00
Size A Sign With Stand
369
PEPD
1.80
664.20
Cone With Reflective Strip
1,135
PEPD
0.90
1,021.50
Tmffic Control Supervisor
81
HR
41.00
3,321.00
Flagging
123
FIR
27.00
3,321.00
$36,236.89
Thank you for your business.
Total
We nooreciate Your business!
Phone #
Fax #
E-mail
970-484-3880
970-226-2659
moil a ogelconerete.mm
Balance Due $36,236.89