Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (3)WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND VOGEL CONCRETE, INC. DATED 10/6/2014 Work Order Number: to-VOG-400903700-14 Purchase Order Number: Project Title: East side of Lemav (Parkwood-Kirkwood) Original Bid/RFP Project Number & Name: 7658 (Annual Concrete Maintenance Contract) Commencement Date. 11/312014 Completion Date: 11121/2014 Maximum Fee: (time and reimbursable direct costs): $44,305.00 Project Description: Install approximately 951 LF of missing sidewalk and three accessible ramps. Scope of Services: manager. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control The attached forms consisting of one (1) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given Professional By: i Date: 101612014 City of Fort Collins By Robert Mosbev Project Manager Date. 10/6/2014 By: Gerry Paul Director of Purchasing and Risk Management (over$60,000.00) Date: LIGHTFIELD ENTERPRISES z aha, LEINogel Concrete Bill To City of Port Collins Engineering Department P.O. Box 580 Fort Collins, Co. 80522 Please Remit To: 6330 S. College Ave. Fort Collins, CO 80525-4044 Project Location Lemay sidewalk Parkwnod north Invoice Work Completed Invoice# 11/26/2014 7186 Invoice Date 1 12/32014 1 P.O] Work Order#. Terms I-VOG-400903700-14 Net 30 Description of Work and Materials Quantity Unit Cost Amount Excavation - General Over 50 CY 200.3 CY 35.00 7.010.50 Flatwork-6" 3.195.18 S17 4.55 14,538.07 Pedestrian Access Ramp 784.62 SF 6.20 4.864.64 Apron - 8" 225.32 SF 6.55 1,475.85 Truncated Dome Panel 44 SF 45.50 2,002.00 Expansion and Caulking 40 LF 3.20 128.00 Vertical Curb and Gutter - No Sidewalk 5 LF 23.00 115.00 Hollywwod Curb and Gutter- No Sidewalk 4.9 LI' 15.50 75.95 Hollywood Curb, Gutter and 6" Sidewalk 2.63 LF 26.00 68.38 Vertical Panel Without Light 148 PEPD 1.10 162.80 Channelizing Barrels 2,120 PEPD 1.40 2,968.00 Size A Sign With Stand 369 PEPD 1.80 664.20 Cone With Reflective Strip 1.135 PEPD 0.90 1,021.50 Traffic Control Supervisor III lilt 41.00 4.551.00 Flagging 163 FIR 27.00 4.401,00 $44,046.89 All work is complete! Total We annreciate vnar hnslnessl Phone# Fax# E-mail 970-484-3880 970-226-2659 nail a vogelconcrete.com Balance Due $44.046.89