HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9147489Invoice
City0ff r1
Fort Collins
Invoice Number: 66640
Customer Number: 175501
Invoice Date: 12/16/2014
Invoice Due Date: 1/15/2615
Page 1
Company Number: 00292
Customer: Remit To:
CITY OF FORT COLLINS-ENGINEERING_ CITY OF FORT COLLINS
117 NORTH MASON STREET
P.O. BOX 580
FORT COLLINS, CO 80522-0580
Please Return the Enclosed Copy with your Payment
Item Description
Charges
001 Work Order '174905 Progress
Balance Due
57,115.81
57,115.81
Engineering Department
PO # Amt.
Aocouni #
Dale
Approval
Vendor #
Doc # Wch #
a
TERMS AND CONDITIONS
Payment is due within 30 bays of the invoice date.
If you have any questions, please contact saragon@fcgov.com or call 6103.
City of
Frt Collins Traffic Operations Itemized Invoice
174905 COLLEGE & CONIFER/HICKORY
ENGINEERING Engineering: Matt Baker
1211612014 I 10/0112014 I I PRO_BILL
175501
Description: SIGNALS WFO
Drill new caissons NEC, NWC, and SEC at Hickory. Remove NWC signal pole and install temporary pedestrian pole away
from planned excavation area. Extend conduit from existing pull box locations to new locations. Relocate poles and rewire
intersecti
on.
Progress bill for.2014. Work tocon.t.inueinSping2015 ...............
....._.... _.....,............
.... ....
Total
Reoular
Overtime
Description
Hours
Hours
Costs
Hours
Costs
TRAFFIC EQUIPMENT OPERATOR 1
33.50
33.50
$1,138.46
0.00
S0.00
TRAFFIC EQUIPMENT OPERATOR II
32.50
32.50
$1.311.18
0.00
$0.00
TRAFFIC SIGNAL TECH 1
1.00
1.00
S37.43
0.00
$0.00
TRAFFIC SIGNAL TECH II
1.00
1.00
$43.16
0.00
S0.00
UTILITY WORKER- STRTS/TRAFFIC
9.50
9.50
$192.43
0.00
$0.00
Total Labor
Description Quantity Cost Per Unit
1C 12 G Green (Trace Wire)
210.00
S0.14
2C 18G Single Pair)
10.00
$0.59
5C 14G (Signal Wire)
30.00
S0.47
Conduit 1,5" 90% Elbow
2.00
S1.97
Conduit 1.5" PVC
10.00
$0.34
Directional Bore
1.00
$52,722.60
Light and Power Charges, Remove Signal Equipment
1.00
$533.35
Rental Charges, Loader -Skid 74"
1.00
$228.00
Total Materials
' Description
Hours
Cost Per Hour
BUCKETTRUCK
3.00
FORD F450 SUPERDUTY W/UTILITY BOX
23.00
LARGE DUMP TRUCK
8.00
UTILITYF450 TRUCK
1.50
TRENCHER
._. ._...._ ..__._... ............. ___. __........
3.50
................. ...... ..... ......
S30.25
$14,40
$38.40
$12.12
$21.60
Extended
Cost
$1,138.46
$1.311.18
$37.43
$43.16
$192.43
$2,722.67
Extended
Cost
$30.24
$5.88
$14.04
S3.94
$3.36
$52,722.60
$533.35
S228 00
yUj'u" I,
Extended
Cost
$90.76
$331.20
$307.20
$18.18
$75.60
Pagel of 2
TRAILER 0.00 S4 80 $28.80
Total Equipment $851.74
Total - Work Order #174905 $57,116.81