Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 9147411EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN ( cn� I' THE CITY OF FORT COLLINS I ` AND Anderson Consulting Engineers, Inc. Dated. 5/5/2014 Work Order Number: Purchase Order Number: Project Title: East Community Park Site Commencement Date: 5/1/2014 Completion Date: 7/30/2014 Maximum Fee: (time & reimbursable direct costs): $6,311.00 Project Description: Grading and design services for East Community Park (Rfgden park site) Scope of Services: See attached scope of services Acceptance Service Provider agrees to perform the services Identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. Service Provider / 8: Date: Ib/3o 7a/4 CC: Purchasing The attached forms kgfisisling of two (2) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Bv: Date: Director or Purchasing and Risk Management if over $50,000 VENDOR: VENDOR #: ADDRESS: PHONE#: CITY OF FORT COLLINS REQUISITION Anderson Consulting Engineers DATE ENTERED: j;../`j/)4 REQ #: AfZFL`lJ7 14,S'7`7 % FOR: 375 E. Horsetooth Road, Bldg. 5 BID #: Fort Collins, CO 80525 INSTRUCTIONS: (970)226-0120 FAX #: (970) 226-0121 VENDOR CONTACT Brian Smith Rigden Park Design Services APDS Contract QUANTITY DESCRIPTION TOTAL PRICE CHARGE NUMBER 1 See attached Scope of Work $6,311.00 400702400.0.3 AUTHORIZED SIGNATURE Project Manager r-i ANdERSON CONSU[TING ENC{iNEERSr INC. Civil • Water Resources • Environmental July 9, 2014 Mr. Jason Stutzman Fort Collins Park Planning and Development PO Box 580 215 N. Mason Street Fort Collins, CO 80522-0580 Re: Rigden Park Design Services (ACE Project No. COFC2011.07.03A) Transmitted VIA Email Dear Jason: This letter represents our invoice for engineering services provided in support of the referenced project. These services were provided during the time period ending July 5, 2014. During this time period, Anderson Consulting Engineers, Inc. (ACE) completed the following work: • Development of original pothole plan fiigureand coordination efforts with Connell toexcavate the potholes. A site visit and efforts to collect information from the potholes. • Development of the Park Site plan and cross sections figures, including the original pothole locations and information. • Coordination efforts with Park Planning and Connell to identify and excavate additional potholes. A site visit and efforts to collect information from the additional potholes. • Revision to the original Park Site plan and cross section figures to include the additional pothole information. • Further revision to the Park Site plan figure to graphically illustrate pothole Information in form of pothole logs. • Meetings and additional site visits with Park Planning and Utility staff to discuss and review pothole Information and fill material options for the Park Site. • Coordination efforts with Connell to conduct an existing ground survey of the Park Site and development of a fill gradient figure illustrating the type of fill material that have been placed on the Park Site to date. • Development of an existing ground surface based on the survey information collected by Connell. Fill quanitity calculations on the amount of fill necessary to bring the Park Site up to proposed grade. • Additional fill quantity calculations to determine the amount of claystone material that could be placed on the lower portions of the Park Site to maintain 4-feet of granular material on the top of the Park Site. • Development of legal descriptions for the Park Site that were requested by the City and prepared by King Surveyors, Inc. P:\COFC2011\COFC2011.07.3 Rigden CM\Invoices\COFC2011.07.3A Invoice Letter.dou 375 East Horsetooth Road, Bldg. 5 • Fort Collins, CO. 80525 Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com Mr. Jason Stutzman July 9, 2014 Page Two If you have any questions related to this invoice or our work effort, please do not hesitate to contact me. Sincerely, ANARSON CONSUITINq ENCI NEERS, INC. Brian A Smith, P.E. Senior Engineer BAS/tlw Enclosure P:\COFC2011\COFC2011.07.3_Rigden CM\Invoices\COFC2011.07.3A Invoice Letter.doa ANdERSON CONSULTING ENGINEERS, INC. Civil • Water Resources • Environmental Anderson Consulting Engineers, Inc. 375 E. Horsetooth Road, Bldg. 5 Fort Collins, CO 80525-3102 970-226-0120 City of Ft Collins -Park Planning and Development PO Box 580 215 N. Mason Street Fort Collins, CO 80522-0580 Professional Services for the Time Period Ending July 05, 2014. PO Number: Mini Order Project Billing Labor Bradley A. Anderson Brian A. Smith Outside Services King Surveyors, Inc. Invoice Summary pnvolce num6eri 15846 Date 07/09/2014 Project COFC2011.07-3A Rigden Park Design Services Billed Hours Rate Amount 16.00 175.00 2,800.00 31.00 97.00 3,007.00 Labor subtotal 47.00 5,807.00 Outside Services subtotal Project Billing subtotal Billed Amount 504.00 504.00 6,311.00 Invoice total 6,311.00 Total Prior Current Description Billed Billed Billed Project Billing 6,311.00 0.00 6,311.00 Total 6,311.00 0.00 5,311.00 Aging Summary Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120 15846 07/09/2014 6,311.00 6,311.00 Total 6,311.00 6.311.00 0.00 0.00 0.00 0.00 City of Ft Collins -Park Planning and Development Invoice number 15846 Invoice date 07/09/2014 Page 1