HomeMy WebLinkAboutWORK ORDER - RFP - 9147411EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN ( cn� I'
THE CITY OF FORT COLLINS I `
AND
Anderson Consulting Engineers, Inc.
Dated. 5/5/2014
Work Order Number:
Purchase Order Number:
Project Title: East Community Park Site
Commencement Date: 5/1/2014
Completion Date: 7/30/2014
Maximum Fee: (time & reimbursable direct costs): $6,311.00
Project Description: Grading and design services for East Community Park (Rfgden park site)
Scope of Services:
See attached scope of services
Acceptance
Service Provider agrees to perform the services
Identified above and on the attached forms in
accordance with the terms and conditions contained
herein and in the Services Agreement between the
parties. In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached forms)
the Services Agreement shall control.
Service Provider /
8:
Date: Ib/3o 7a/4
CC: Purchasing
The attached forms kgfisisling of two (2) pages
are hereby accepted and incorporated herein by
this reference, and Notice to Proceed is hereby
given.
City of Fort Collins
Bv:
Date:
Director or Purchasing and Risk Management
if over $50,000
VENDOR:
VENDOR #:
ADDRESS:
PHONE#:
CITY OF FORT COLLINS
REQUISITION
Anderson Consulting Engineers DATE ENTERED: j;../`j/)4 REQ #: AfZFL`lJ7
14,S'7`7 % FOR:
375 E. Horsetooth Road, Bldg. 5 BID #:
Fort Collins, CO 80525 INSTRUCTIONS:
(970)226-0120
FAX #: (970) 226-0121
VENDOR CONTACT Brian Smith
Rigden Park Design Services
APDS Contract
QUANTITY
DESCRIPTION
TOTAL PRICE
CHARGE NUMBER
1
See attached Scope of Work
$6,311.00
400702400.0.3
AUTHORIZED SIGNATURE
Project Manager
r-i ANdERSON CONSU[TING ENC{iNEERSr INC.
Civil • Water Resources • Environmental
July 9, 2014
Mr. Jason Stutzman
Fort Collins Park Planning and Development
PO Box 580
215 N. Mason Street
Fort Collins, CO 80522-0580
Re: Rigden Park Design Services
(ACE Project No. COFC2011.07.03A)
Transmitted VIA Email
Dear Jason:
This letter represents our invoice for engineering services provided in support of the referenced project.
These services were provided during the time period ending July 5, 2014. During this time period,
Anderson Consulting Engineers, Inc. (ACE) completed the following work:
• Development of original pothole plan fiigureand coordination efforts with Connell toexcavate
the potholes. A site visit and efforts to collect information from the potholes.
• Development of the Park Site plan and cross sections figures, including the original pothole
locations and information.
• Coordination efforts with Park Planning and Connell to identify and excavate additional
potholes. A site visit and efforts to collect information from the additional potholes.
• Revision to the original Park Site plan and cross section figures to include the additional
pothole information.
• Further revision to the Park Site plan figure to graphically illustrate pothole Information in
form of pothole logs.
• Meetings and additional site visits with Park Planning and Utility staff to discuss and review
pothole Information and fill material options for the Park Site.
• Coordination efforts with Connell to conduct an existing ground survey of the Park Site and
development of a fill gradient figure illustrating the type of fill material that have been placed
on the Park Site to date.
• Development of an existing ground surface based on the survey information collected by
Connell. Fill quanitity calculations on the amount of fill necessary to bring the Park Site up to
proposed grade.
• Additional fill quantity calculations to determine the amount of claystone material that could
be placed on the lower portions of the Park Site to maintain 4-feet of granular material on the
top of the Park Site.
• Development of legal descriptions for the Park Site that were requested by the City and
prepared by King Surveyors, Inc.
P:\COFC2011\COFC2011.07.3 Rigden CM\Invoices\COFC2011.07.3A Invoice Letter.dou
375 East Horsetooth Road, Bldg. 5 • Fort Collins, CO. 80525
Phone: (970) 226-0120 • Fax: (970) 226-0121 • www.acewater.com
Mr. Jason Stutzman
July 9, 2014
Page Two
If you have any questions related to this invoice or our work effort, please do not hesitate to contact me.
Sincerely,
ANARSON CONSUITINq ENCI NEERS, INC.
Brian A Smith, P.E.
Senior Engineer
BAS/tlw
Enclosure
P:\COFC2011\COFC2011.07.3_Rigden CM\Invoices\COFC2011.07.3A Invoice Letter.doa
ANdERSON CONSULTING ENGINEERS, INC.
Civil • Water Resources • Environmental
Anderson Consulting Engineers, Inc.
375 E. Horsetooth Road, Bldg. 5
Fort Collins, CO 80525-3102
970-226-0120
City of Ft Collins -Park Planning and Development
PO Box 580
215 N. Mason Street
Fort Collins, CO 80522-0580
Professional Services for the Time Period Ending July 05, 2014.
PO Number: Mini Order
Project Billing
Labor
Bradley A. Anderson
Brian A. Smith
Outside Services
King Surveyors, Inc.
Invoice Summary
pnvolce num6eri 15846
Date 07/09/2014
Project COFC2011.07-3A Rigden Park Design
Services
Billed
Hours
Rate Amount
16.00
175.00 2,800.00
31.00
97.00 3,007.00
Labor subtotal 47.00
5,807.00
Outside Services subtotal
Project Billing subtotal
Billed
Amount
504.00
504.00
6,311.00
Invoice total 6,311.00
Total
Prior
Current
Description Billed
Billed
Billed
Project Billing 6,311.00
0.00
6,311.00
Total 6,311.00
0.00
5,311.00
Aging Summary
Invoice Number Invoice Date Outstanding Current Over 30 Over 60 Over 90 Over 120
15846 07/09/2014 6,311.00 6,311.00
Total 6,311.00 6.311.00 0.00 0.00 0.00 0.00
City of Ft Collins -Park Planning and Development Invoice number 15846 Invoice date 07/09/2014