Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7260 PROSPECT ROAD BRIDGE & MULBERRY STREET BRIDGE REPLACEMENT DESIGN SERVICES (4)Fart Collins Engineering Planning; Development & Transportation gal Nona Cort90Av P.O. BM we Fat Calms, C09l15Y MW 270321.41105 070.221.9373-Tax Change Order Form PROJECT TITLE: W. Mulberry/Prospect Bridge Replacement PROJECT NUMBER: 254902102.3 (RFP #7260) - PO #9116411 CONTRACTOR: KOG Engineering, LLC CHANGE ORDER NUMBER: 4 In preparing change orders show in order as separate numbered Paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4. Change In contract time. 182 See attached sheet fordetali. 3. The contract cost will Increase by $ 39,494.50 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ACCEPTED BY: 20.20% 55.31% $195,499.00 $68,644.00 $0.00 $39,494.50 $303,637.60 DATE: iz laa _ DATE: I I -r DATE: � Z. Z.01 ACCEPTED BY: - DATE: (Department Headj APPROVED BY: DATE: (Purchasing Agent over SKOD0) x Contactor Purchantla Project File ® KDG Engineering LLC 3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph.: 720.420.9069 Fax: 303.957.5477 K11009B December 7, 2014 Mr. Jin Wang City of Fort Collins Engineering 281 North College Avenue Fort Collins, CO 80521 Subject: Proposal for Additional Environmental and Design Services Fees —Change Order 4 Mulberry Street Bridge Replacement Dear Jin: As discussed, a combination of CDOT, FHWA, and City additional requirements has increased our work effort and time of performance. These are as follows: 1.1. CDOT has now taken direct involvement in this project for the Mulberry Street bridge replacement. Several new requirements were added including more stringent documentation for FHWA, using 11' lanes instead of existing widths, and maintaining a constant cross slope. This required additional effort to check and redesign. 1.2. The City's Traffic Engineering added substantial changes to the traffic control above what is typically required by CDOT. 1.3. During our last meeting with them, the extent of the environmental services has increased along with the design effort that is required to meet all the CDOT requirements. In addition to CDOT, FHWA has much stricter design and environmental requirements due to the recent flood issues. The extent of the environmental services has also increased due to the findings of the initial environmental evaluation of the site. 1.4. Current issues with contractor's and subcontractor's abilities on the fabricated steel railing for the Prospect Road project indicates a need to redesign the railing connections to the concrete. 1.5. The City is now designing a new water line alignment. Once their plans are done, their plans and quantities will be added to the Mulberry plan and specifications. In addition, it appears that the new alignment will severely impact the traffic control plan and construction phasing. This is a rough estimate of the time needed since the water line is not designed yet. 1.6. Due to the review time by CDOT and FHWA for the environmental and ROW approvals, the project cannot be practically advertised in 2014. The City anticipates advertising the project in late summer of 2015. The plans and specifications will have to be updated to the most current CDOT and FHWA requirements. M KDG Engineering LLC 3500 S. Wadsworth Blvd. Suite 400, Lakewood, CO 80235 Ph.:-720.420.9069 Fax: 303.957.5477 In addition, the extent of the construction services for the Prospect Road bridge replacement is exceeding our early estimates, primarily due to the extensive urban design features that were added to the bridge. We are therefore requesting additional funds and a time extension through September, 2016 to complete this project (to the end of construction). The attached Exhibit A has the fee proposal for this effort. Please review my fee proposal and scope of services to verify that they are acceptable to you. If you have questions or need additional information, please contact me at 720-420-9069 or e-mail me at skobayashi64@msn.com. Sincerely, Stanley H. Kobayashi, PE Project Manager Attached: Exhibit A, Engineers Estimate of'Fees Change Order 4 N O N O O O O N LL O tp M lV eD 40 W O O N O N o w w w w w » w w m o 0 0 y� O OO NN O M f9 xC W N O N O O O O b O N N Npp N O N y a O V T J IA s W _ w O O O O O O f Cq (O(pp O 0 O N N O O N N � F � N N E yN a `m o0 0'o `oS vi o p• 0 0 0 o � coin O L a v aG �i o ' o � = C O N O O N M w n n N . v c m 0 O C O O 0 O N O N o c 0 o - LL w� w o 0 9 62 O O O O O O N N W 0 O o o N 0 m W y m W ® N N vi C Q m c N QO O O w rM J a a o 0 0 0 0 0 0 0 o m � H N N `C yyyy 0 LrnN W m Sm N C C> C p Wq E a O Li Q. �_¢ O SD O U _� �Npern N O IL ed D cmc O E Ln O 1�- y 0 J �� �_ J C HE �'.E E 0 Sc N C y aaiN � S C LL c � m a CO O �- U