HomeMy WebLinkAboutCHANGE ORDER - BID - 7664 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROADCHANGE ORDER NO.1 / '. PROJECT TITLE: Fossil Creek Trail Underpass at Trilby Road CONTRACTOR: ECI Site Construction Management PROJECT NUMBER: Bid 97664 PURCHASE ORDER NO.: 9145253 DESCRIPTION: 1. Reason for change: A plan revision to the to the 24" storm sewer require a changes to the work required for completion. (See attached) 2. Description of Change: Relay existing 24" RCP $1,573.20 24" RCP (add) $581.40 48" manhole (credit) ($3,656.17) 72" manhole (add) $5,731.60 3. Change In Contract Cost: 4. Change In Contract Time: 0 $4,230.03 O TOTAL APPROVED CHANGE ORDER $0.00 TOTAL PENDING CHANGE ORDER $0.00 TOTAL THIS CHANGE ORDER $ 4,230.03 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.33% TOTAL % OF ORIGINAL CONTRACT, ALL C.O. S 0.330/6 ADJUSTED CONTRACT COST 51,285 531.95 (Assuming all change orders approved) ACCEPTED Contractor's ACCEPTED Project Mane REVIEWED ,. Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect �. Contractor . Engineer Project File Purchasing DATE: /0�30/1`/ DATE: /y5 /J/ r DATE: DATE: DATE: SITE CONSTRUCTION MANAGEMENT TO OWNER: City of Fort Collins Attn: Jason Stutzman 215 N. Mason St. 2n" Floor Fort Collins, CO 80522 Adjustment to Item #603 Relay 24" RCP 24" RCP Addition Adjustment to Item #604 48" Manhole Credit 72" Manhole Addition 2526 E. Highway 402 CHANGE P.O. Box 2135 ORDER Loveland, CO 80539 Phone: (970) 669-6291 Fax: (970)669-6411 Metro: (303) 530-7660 Fossil Creek Trail Underpass PROJECT: S LemayAve. and E Trilby Road Fort Collins, CO 80522 CHANGE ORDER NO: DATE: CONTRACT NO.: CONTRACT FOR: 24 LF $65.55 8 LF $72.68 -1 EA $3,656.17 1 EA $5,731.60 Total The original Contract Sum was Net change by prevlously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The New Contract Sum including this Change Order will be Signature DATE ** Please sign above and return for processing. Signature DATE 2 10/21/2014 14-100002 Manhole and RCP Revision $1,573.20 $581.40 -$3,656.17 $5,731.60 $4,230.03 $1,281,301.92 $1,281,301.92 $4,230.03 $1,285,531.95 PROJECT TITLE: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1. Reason for change 2. Description of Change: 3. Change in Contract Cost: CHANGE ORDER NO.2 Fossil Creek Trail Underpass at Trilby Road ECI Site Construction Management Bid #7664 9145253 Changes for month of November Additional mrk was completed due to field quantity verification, additional work requested by FCLWD, and due to unforeseen subsurface site condtlons. 4. Change in Contract Time: 0 TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER a - 2-A Fly Ash Stabllization - ADD $ 11,944.80 2-6 12' Gate Valve - ADD $ 4,912.95 4 Removal of Asphalt Met $ 138.69 21 Aggregate ease Course (Class 6) $ 1.638.95 22 Hot Mix Asphalt (Grading S)(75)(64-22) $ 8,222.43 23 Geosynlhetic Pavement Intedayer $ 202.18 24 Helical Plers (40' Bridge) $ 8,074.21 35 Guardrail Transition Type 3H-DELETE $ (1,651.88) 36 Guardrail Transition Type 3G - ADD $ _ 1,651.88. $35,334.20 TOTAL % ORIGINAL CONTRACT, THIS C.O. 2.76% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 3.09% ADJUSTED CONTRACT COST $1,320,668.20 (Assuming all change orders approved) ACCEPTED BY: y DATE: /�/y�(t� Contractor's Representative ACCEPTED BY: DATE: Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE:_IZZIL Title: APPROVED BY: DATE: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing o SITE CONSTRUCTION MANAGEMENT TO OWNER: City of Fort Collins Attn: Jason Stutzman 215 N. Mason St. 2nd Floor Fort Collins, CO 80522 Stabilization of Sidewalk Subgrade Son Haul -Fly Ash Stabilization ECI Mark Up (5%) 2526 E. Highway 402 CHANGE P.O. Box 2135 ORDER REQUEST Loveland, CO 80539 Phone: (970)669-6291 Fax: (970)669-6411 Metro: (303) 530-7660 PROJECT: Fort Collins, CO 80522 DATE: CONTRACT NO.: 1 LS $11,376.00 The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased by this Change Order in the amount of The New Contract Sum including this Change Order will be Signature DATE ** Please sign above and return for processing. Signature DATE 10/29/2014 14-100002 $11,944;80 tZ $1,281,301.92 $1,281,301.92 $11,944.80 $1,293,246.72 SON -HAUL INC P.O. Box 1449 �N'� M— , Fort Morgan, Co. 80701 #929D FAX: 970/867-2186 OFFICE: 970/867-4401 SHOP: 970/867-7890 T0: ECI PROJECT : Sidewalk Stabilization ADDRESS: 2526 E. Hwy402 P.O. Box2135 LOCATION: E. Trilby Rd Loveland, CO 80539 Ft. Collins, CO PHONE: 970-669-6291 FAX: 970-669-6411 ATTENTION: Ian Mestdagh EMAIL: ian(a)ecisite.net erin<decisite.net <-- Invoices DATE: 12r212014 PAGE: 1 OF 1 SCOPE OF WORK: BASE BID Purchase, haul, spread and mix Fly Ash Stabilization @ 13%to a depth of 12" PROPOSAL: Quantity Unit Unit Price Total BASE BID Fly Ash Stabilization @ 13% to a depth of 12" 486 sy $9.00 $4,374.00 mobilization 1 ea $2,500.00 $2,500.00 Blade & Compact 486 sy $2.00 $972.OD mobilization 1 ea $1,500.00 $1,500.OD Additional Fly Ash to dry out stabilization area 35 to $58.00 $2,030.00 agreed upon onsite $11,376.00 1 • 2526 E. Highway 402 CHANGE P.O. Box 2135 ORDER REQUEST Loveland, CO 80539 Phone: (970) 669-6291 SITE CONSTRUCTION Fax: (970) 669-6411 MANAGEMENT Metro: (303) 530-7660 TO OWNER: PROJECT: City of Fort Collins Fort Collins, CO 80522 Attn: Jason Stutzman 215 N. Mason St. 2nd Floor CHANGE€2,Bj Fort Collins, CO 80522 DATE: 10/29/2014 CONTRACT NO.: 14-100002 CONTRACT FOR: Gate Valve The ContractChange is as follows , ;; , Qty ' ;Unrt Untt Cost Y E'n <Total v Adjustment to Item #616 12" Gate Valve Addition 1 LS-55,388.85 $4,912.95 Total $4,912.95 Not valid u€itil signed by the Subcontractor andContracfo"'r The original Contract Sum was $1,281,301.92 Net change by previously authorized Change Orders $ The Contract Sum prior to this Change Order was $1,281,301.92 The Contract Sum will be increased by this Change Order in the amount of $4,912.95 The New Contract Sum including this Change Order will be $1,286,214.87 Signature Signature DATE DATE "Please sign above and return for processing. _ � �� 9 fi a a Uers o 'October 2120 4� Chan a Order ID#�" � � -�- Pro ect ID FS �` ��Pf0 ecrName � "'and Date �n "`' 002 140801 Fossil Creek AVlCI SkMVVtrs Underpass Contract change requested by: Requestor Name: ❑ Summers Construction, LLC Anna Hoehn — ECI Construction Management XX Client XX Architect/Engineer Ct Construction Manager Date: 10-21-14 ❑ Code Enforcement Official ❑ Other: Request Reference Document: Revised plans Change order description: Reason(s)s for change order: Add one 12" gate valve and restraints. Revised scope. Supporting documentation provided. Time Extension Required: XX Yes D No Cost Change Required: XX Yes 0 No Number of Days': '/2 day Total (increase/decrease) Amoun . $4,679.00 Reason: Reason: Revised scope Extra work. Supporting documentation attached: Supporting documentation attached: See attached worksheets. Customer Approval: Summers Construction, LLC Approval: Name/Date Name/DateAWlm Suwtwters 10-2L-i4