HomeMy WebLinkAboutWORK ORDER - RFP - 7616 WETLAND RIVER & FLOODPLAIN ECOLOGICAL RESTORATION (3)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and Biohabitats December 3, 2014 Work Order Number: NAD - 2014 Project Title: Finishing of Sterling RipRup Commencement Date: November IS, 2014 Completion Date: Maximum Fee: Project Description: Scope of Services: December 31, 2014 NTE $15,000 See attached description See attached Scope of Services Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the .parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provider By:—tr. q. 2) Date:` >eC e.ti 6'r— 3 lot APPROVAL: Director of Purchasing 3`)-750 ^� v The attached forms consisting of zero (0) pages are hereby accepted and Incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins By:�— Date: DL,e,, Jw. 0/Y' .0, Biohabitats 'SOUTHERN ROCKY MOUNTAIN 810REGION 1-32 V nec .Street Suite 200 Denver, CO 8o2o2 November 20, 2014 Rick Bachand Project Manager Fort Collins Natural Areas Program PO Box 580 Fort Collins, CO 80522-0580 PROJECT: Topsoil and Seeding of Riprap Bank at Sterling PROJECT NO. 14912.04 2014 Ecological Restoration On -Call Dear Mr. Bachand, This letter provides a brief scope of work and fee estimate for the installation of topsoil and seed on the riprap bank area at the upstream end of the Sterling project. The scope of work includes the items described below. Delivery of 6 loads of custom mixed sand/topsoil and 7 loads of standard topsoil. Each load is approximately 20 CY for a total of 260 CY. Hageman Earth Cycle will supply and deliver the topsoil. Install the custom sand/topsoil first to fill the voids in the riprap and then install the standard topsoil to cover the riprap. Roberts Excavation will use a 938 loader to move the topsoil to the top of bank and a 328 trackhoe to place the topsoil on the riprap. Roberts will also supply workers to wash the sand/topsoil into the riprap, rake the standard topsoil evenly over the riprap, and rake the broadcast native seed mix into the topsoil. We will use the same native seed mix that Natural Areas installed on the fioodplain at Sterling. Apply hydromulch with a bonding agent to stabilize the topsoil slope. This will provide appropriate stabilization of the slope over the winter. We will be careful to minimize construction equipment and haul trucks disturbance on site especially at the newly seeded construction staging area. Our fee to conduct the additional work will be on a time and materials basis in accordance with our 2014 contract rates, with an estimated not -to -exceed budget of $15,000. Thank you for your consideration of this request and for the opportunity to continue to assist you on this project. If you have any questions or concerns, please call me at (303) 477-0660. Sincerely, Claudia Browne, Project Manager