HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9147159WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
`THE CITY OF FORTCOLLINS
AND
Connel
DATED: 11/5/14
Work Order Number:
Purchase Order Number:
Project Title: Soapstone RoadlTrail,Repalr
'Original Bid/RF15, Project Number & Name:
Commencement Date:
Completion Data:
Maximum Fee: (time and reimbursable direct costs):M993i20
Project Descrlptlon: Repair damaged roads and.trsils'from 20
d4ri'water as miell ss f'iz eroded sectloris.
Scope ofServices: damaoed.roads.and trails:
Professional agrees to perform the services
City of F.6 pill
identified above and on the attached forms In
accordance with the _terms and conditions
By
contained herein,and in the Professional Services
ProjectMa
Agreement_ between the
parties 'in the event of a
conflict between or ambiguity
in the'terms'of the
Date: _ l
Professional Services Agreement end this work
order. (including the "attached, forms) the
ProfessionalServices Agreement shall control,
By:.
Gerry Paul`
The'attached forms consisting of _ ( pages
Director of Purchasing and Risk'Managernent
are hereby'accepted and inoorpgrated herein; by
(over $66,000.00)
this reference, and'Notice to Proceed Is hereby
given.
Date: _ b� I
l� 673
Connell_ Resources. Inc.
7786 Highland,Meadows.Pkwy, #100
Fort CoI11ns;.CO 80528
Phone: (870) 223-3151
Fax: (970)223=3191
Estimator: Roland Tremble
QUOTATION Date: 10/10/2014
Submitted Tod
City Of Fort Collins - Natural Resources
Bid Title
Soapstone Prairie Roads
Addremm
Fort Collins, 00
Bid Number.
Project Location:
Wyoming Border
Contact,.
Ryan Kogut
Project City, State:
Larlmer County, CO
Phone:
970416.2206 Fax: 970416-2211
Engineer/Archltectd
Item & .Item
Description -
-Estimated
Quantity - Unit Unit Price Total Piio;
Base Bid
00-100
Mobilization
1.00 EACH $3,810.00
$3,810.00
00-145
SiteManrdgement
12.80 DY $544.00
$6,963.20
23-300
Sutgrade Crew For Road / Trall Grading Work
13.00 DY $4,940.00
$64,220.00
Blade Full Mine
SkipTattor.Rig Time
0gmpac6or Half Time
Darer Half lime
Water Truck Half Time
Tandem Dump Truck Half Time
Total Price for above Base Bid Items;
$74,993.20
Total Bid Price: $74 993.20
Notest
• Pricing Is based upon site visit with Ryan kogut, and anticipated equipment needs to complete re shaping and grading of the e:dstirg tall system at
soapstone.patrie natural area. .
• The following are excluded from this proposal: Construction layout and engineering;. Drainage fadRty certification; Warrantee period In ewres of
one year; Street cleaning for work performed try,others; Permits; Fees; Dewatering; Erosion control; quality control or acceptance testing; Import tin
export of material; prairie dog removal; relocation, or ottefinination; landscaping, see(Ing, or revegetation.
Frost removal or winter,protaciion Is not included. If requested, It wig be billed eldw on a time and material baps or a lump wen amount that is
mubs0y agreed apon.
• Environmental site assesment / mdtgation of hazardous or contaminated materials Is excluded. Treatment or tes" for contaminated grwdwater
Is specifically excluded.
CONDITIONS AND AGREEMENT'S
badorcanom rip lbr gradlag work, a prim t
and material bash ore agotWed lump am
and Council
&DESIGN AND ENGINEERING SEW
p cdbmdmg, or re W oils gaEUed proressim
pe himodby Von*. spomncesoteae es
&EXTRA WORK:Upos written notice th
work describe& the parties shell negotiate a
within three Ulworkingdoe and Connall I
with came wok If Connell ecodders it nee
rmsusa&on Is writing On mother method e
7.9111ANTITY DETERMINATION AND
by sponsor will ba detitaud by midliplyirq
destyamed as a lump -sum quumiims.
&PAYMENTTERMS: Theapaasor ogrd
the 101h ofeteh mmWtfsHowing thenlave
eadded to a 1.1•M per tomb LATE PAY
by Commil of a panisl paym a- dull out be
9DERAULT: If spaoaor deDults to timely
modfied by Connell Romano. Inc maneir) If Out accepted by the named spomos(Me -Spooson within
perA msoce ofservlm battle tptmed am mqm an delays occasioned byebmmsomesbcYmd Comrcll'sommaL Complakadasets
sslabwdinkuhies. fuel or material sbortoges.'fire.gwcmmmtmNtiirymtegoWkq ace OfGo4miMcedoa cb•ages.coopeeme trot
toppinsimsunk"WL-d. Spoinorm furnish all contracts and acicgmmwotldn right ofwey>,
g.
rmotettal it m eoumeed discs 1-'A yard luekhx c®aM=On fm utnib.lastalMkn ea d
mina, n ummbw mbgmae wturaom ern enouakrt4 thew COMIt1aM shill be the erilede foroltange oidurwpofietkm bttweo l
Spomoradomwledges aim Comm is notpmridmg pmreWw4 deipo mcvgiee,ing sstvioea spawner is solely requadwe for
petfoo, eU snch amviees. m Uhdreod: Contain shall oh he liable fen mo damages resulting Dum deedpn mmtiaacmntaervies
.Key
quantities than bow rified by in -field measureuu m anaemeWdlo4 and the toad price mbepaa
retch quAnWOL Thu gootnigm dull M cmuidewd a ani[prie gouda maim h kryeil(ridy
:dne& lwoim orprog(m papmmts wan bedaeo
is tithe esseom to MIS Agtecmmcc Coaealwin be
4TE0F I"l,oncgpm:duebeleouea A mpuax
all oats and expenses pneladh a seavoble
It ZVM1411:25:31 AM Page I of 2