Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7089 WATER WW AND SW UTILITIES INFRASTRUCTURE DESIGN AND CONSTRUCTION SERVICES (14)Feb. 16, 2010 Connell Resources. Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Dan Giesler CONNNELL QUOTATION Date: 7/24/2014 Submitted To: Address: Contact: Phone: City Of Fort Collins - Utilities 700 Wood St. Fort Collins, CO 80522 Cliff Hoelscher (970) 22 Fax: (970) 221-6619 Bid Title Bid Number: Project Location: Project City, State: Engineer/Architect: Parle Site - Rigden Reservoir Rigden Reservoir Fort Collins, CO Anderson Consulting Engineers, Inc. item # Item Description EstimatedQuantity Unit Unit Price Total Price 10 Strip Topsoil Area 1@ 1211 28,500.00 CT $1.75 $49,875.00 20 Replace With 1211 28,500.00 CT $1.75 $49,875.00 30 Granular 165,000 From Area 1/Topsoil 100,000 From Area 2 (trucks) 265,000.00 CT $3.45 $914,250.00 40 Remove Clay From Area 3 35,000.00 CT $2.25 $78,750.00 50 Replace Clay With Granular 35,000.00 CT $3.45 $120,750.00 60 Dewatering Trench 1.00 LS $15,000.00 $15,000.00 70 Dewatering Costs 10.00 WK $3,100.00 $31,000.00 80 Contouring Area 2 (9 acres) 43,560.00 SY $0.30 $13,068.00 90 Seeding 27.50 ACRE $825.00 $22,687.50 00 Overhead @ 2%of cost 1.00 LS $0.00 $0.00 110 Contingency @ 5% of cost 1.00 LS $0.00 $0.00 7RWDO%LG3ULFH  10/29/2014 1:38:10 PM Page1 Civil •• Water Resources ••Environmental 375 East Horsetooth Road, Building 5, Fort Collins, CO 80525 Phone (970) 226-0120 / Fax (970) 226-0121 www.acewater.com Act ID Description Orig Dur Rem Dur Early Start Early Finish NOV 2014 10 DEC 2015 17 JAN 24 FEB 01 MAR 08 APR 15 MAY 22 29 05 12 19 26 02 09 16 23 02 09 16 23 30 06 13 20 27 04 1000 Work Order Issued 0 0 17NOV14 1010 Strip Topsoil Area #1 -28,500 CY 6d 6d 17NOV14 24NOV14 1020 Exc. Area 1 Material - Haul to Park -165,000 CY 36d 36d 25NOV14 27JAN15 1090 Set Dewatering Area 1 2d 2d 25NOV14 26NOV14 1030 Remove Existing Claystone From Park -35,000 CY 7d 7d 15JAN15 27JAN15 1040 Replace Park Claystone w/ Area 1 Matr. -35,000CY 5h 5h 28JAN15 28JAN15 1110 Place Claystone Fill in Area 1 - 165,000 CY 25d 25d 28JAN15 05MAR15 1050 Place Park Topsoil - Haul From Area 2 -100,000CY 25d 25d 28JAN15 06MAR15 1060 Replace Topsoil on Area 1 - 28,500 CY 7d 7d 06MAR15 17MAR15 1100 Park Site Work Complete 0 0 06MAR15 1070 Finish Grading - All Areas 4d 4d 18MAR15 23MAR15 1080 Seeding - 27.5 Acre 8d 8d 24MAR15 02APR15 1120 All Areas Complete 0 0 02APR15 Work Order Issued Strip Topsoil Area #1 -28,500 CY Exc. Area 1 Material - Haul to Park -165,000 CY Set Dewatering Area 1 Remove Existing Claystone From Park -35,000 CY Replace Park Claystone w/ Area 1 Matr. -35,000CY Place Claystone Fill in Area 1 - 165,000 CY Place Park Topsoil - Haul From Area 2 -100,000CY Replace Topsoil on Area 1 - 28,500 CY Park Site Work Complete Finish Grading - All Areas Seeding - 27.5 Acre All Areas Complete Start date 17NOV14 Finish date 02APR15 Data date 17NOV14 Run date 10NOV14 Page number 1A © Primavera Systems, Inc. Connell Resources, Inc. CoFC Rigden Park Site Earthwork Early bar Progress bar Critical bar Summary bar Start milestone point Finish milestone point