WORK ORDER
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
MICHAEL BAKER JR., INC.
DATED: November 6, 2014
Work Order Number: 10-264902100-14
Purchase Order Number.
Project Title: Bridge Inspection, Maintenance, Repair and Replacement Program
2014-2016 Confined Space Inspections & Safety Anchor Installations
Original Bid/RFP Project Number & Name:
Commencement Date: November 6, 2014
Completion Date: April 30, 2016
Maximum Fee: (time and reimbursable direct costs): Not to exceed $19,057.60
Project Description: 2014-2016 Confined Space Inspections & Safely Anchor Installations
Scope of Services: See attached.
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions
contained herein and in the Professional Services
Agreement between the parties. in the event of a
conflict between or ambiguity In the terms of the
Professional Services Agreement and this work
order (including the attached forms) the
Professional Services Agreement shall control.
The attached forms consisting of five (6) pages
are hereby accepted and Incorporated herein, by
this reference, and Notice to Proceed is hereby
given.
Professional
By: A&
Date: //—/D—/�/
City of Fort Collins
Date: L1 I tZI.Ol
By:
Gerry Paul
Director of Purchasing and Risk Management
(over $60,000.00)
Date:
Exhibit `°A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
MICHAEL BAKER JR., INC.
DATED: November 6, 2014
Work Order No.
Purchase Order No.
Project title: Bridge Inspection, Maintenance, Repair and Replacement Program
2014/2015 Confined Space Inspection and Safety Anchor Installation
Commencement Date: November 6, 2014
Completion Date: April 30, 2014
Maximum Fee: $19,057.50
PROJECT DESCRIPTION:
This scope of work is for bridge inspection and related services of minor structures for the 2014-2015
inspection cycle (structures inspected between November 2014 and April 2015). This work order is
performed under the master agreement for the City's Bridge Inspection, Maintenance, Repair, and
Replacement Program. Work elements include project administration, field inspections and reporting, and
structure ratings. A detailed description of each anticipated service is described below.
Minor structures range in length from 4 feet to 20 feet with types that include, but are not limited to;
bridges, box culverts, pipe culverts, multi -plate arches, and rigid frames. Each structure shall be inspected
at a frequency not to exceed two years (or more frequently if determined by the City). The majority of the
City's minor structures have previously been inspected and load rated. However, there are a number of
structures that are either new or have not previously been included in the inspection program. Some
structures may have limited access (confined space) and shall be considered separately from other
structures.
Additionally, Baker will update the City's spreadsheet that defines if a structure is Structurally Deficient
(SD) or Functionally Obsolete (FO) as defined by the FHWA guidelines.
SCOPE OF SERVICES:
Baker will inspect a total of 11 structures. The breakdown of structures is: 9 re -inspections and 2 new
inspections. There are 11 confined space structures. Baker will provide all information collected from the
field inspections to the City for record keeping, including report output in an excel format consistent with
the City's asset management program (see below for more information).
Existing structures will be evaluated to compare current conditions to the conditions documented from the
previous inspection. Structures rated for the first time, as well as those structures where the inspection
Exhibit A - Work Order Form
Bridge Inspection, Maintenance, Repair and Replacement Program—201412015 Confined Space Inspection and Safety Anchor Installation
reveals significant changes from previous inspections, will required either a visual or load rating. It is
anticipated that there will be 2 load ratings and 9 rating verifications will be performed.
Any variations to the number of the anticipated inspections and ratings from that listed above will be
documented. Baker will coordinate with the City to modify the work order, as necessary.
Develop Excel Spreadsheet for Structural Classification
Work elements include: extracting the data from the City's PONTIS database, importing the data into excel
and updating equations that determine the structural classification based on the criteria currently stipulated
by the FHWA. The updated spreadsheet will be included with the other inspection reports as defined in this
Scope of Work.
Anchor Installation
In addition, Baker will provide labor and equipment to install temporary anchors for confined space
structures at 36 locations as instructed by the City of Fort Collins. The temporary anchors will be provided
by the City of Fort Collins. Four anchors will be installed at each access manhole location. The City will
be responsible for the removal of the temporary anchors. Manhole access is located at the following
structures:
CANY-S-MULB
LOOM -MAP -A
OAK-WHTM
CHRY-GRNT
LRL-MLD
OLIV-OAK-A
CHRY-SYCM-A
LRL-MYRT-A
OLIV-W-LOOM
FCSHWD-0.0-MULB
MAP -LOOM
PRST-W-CTRE
FCLAPT-0.0-WHTM
MAP-WHTM-A
SHWD-S-MYRT-A
FCWHTM-0.0-MGNL
MGNL-OLIV-A ,
WHTM-MLD-A
GRNT-S-MAP
MTN-W-WHTM
WOOD-S-SYCM
LAKE-W-CNTR
MYRT-W-SHWD
LOOM -MAP
OAK-MTN-A
I. Project Administration
Upon notice to proceed, Baker will perform project administration duties throughout the length of the
contract.
A. Invoices will be provided to the City on a monthly basis and will include a billing summary and a
progress report for work performed during the current billing period and project to date.
B. All documents will receive a quality assurance and quality control (QA/QC) review, in accordance
with the Baker Way, prior to submittal.
C. The following meetings are anticipated:
• Two Progress Meetings (Assume phone meetings only)
• One Project Delivery Meeting
H. Field Inspections and Reporting
Baker shall perform all inspections and reporting in accordance with the GUIDELINES AND
REFERENCES as described below. There are a variety of inspection types that will be performed under this
work order: re -inspection (unconfined space), new inspection (unconfined space), re -inspection (confined
space), and new inspection (confined space). In all cases, the general work activities include:
Inspection Preparation. At the outset of the project, all inspection information will be compiled
and organized. The project team will determine the preferred inspection order and schedule.
October 17, 2014
2 of 4
Exhibit A - Work Order Form
Bridge Inspection, Maintenance, Repair and Replacement Program — 201412015 Confined Space Inspection and Safety Anchor Installation
• Obtain Average Daily Traffic Count (ADT). Baker will use traffic counting devices to take a 24-
hour traffic count at each location.
• Field Inspection. Baker will perform structural inspections at each location specified by the City.
Inspectors will evaluate and assess the structural condition of appropriate elements, take or update
field measurements, take new photos, assess overall performance including scour (if applicable),
perform a visual rating (if applicable), and document recommended maintenance/repair activities.
• Documentation and Sketches. If available, previous documentation and sketches will be revised as
necessary. If no existing information is available, new documentation and sketches will be prepared.
CADD drawings will be prepared in Microstation.
• Report Production. Field inspection data will be input into PONTIS 4.1.1, or an alternative
database software program, for purposes of recording and managing the inspection data. Specific
report output shall be prepared as requested by the City; including six (6) excel output files.
• Inspection and Report QC. All inspection and reporting data will be reviewed for verification of
quality control procedures and data accuracy.
• Submittal. All deliverables will be submitted to the City at the end of the project. See
DELIVERABLES below for more information.
Any emergency inspections shall not be included with this work order, but shall be considered as part of a
separate work order. General work activities for emergency inspections shall follow those listed above, but
may also require additional activities, as determined on a case -by -case basis.
III. Structure Ratings and Verification
The work activities for this effort fall into one of three categories: verification of the existing rating,
preparation of a new visual rating, or preparation of a new load rating. The following chart defines when
each of the activities is required.
* Visual or load rating if deemed necessary due to significant
changes to structural condition, and as approved by the City
A. Verification of Existing Rating
All existing structures should already have a rating assigned through previous inspections. In this
case, Baker will verify that the element conditions defined with the existing rating have not changed
significantly. If conditions have changed such that further investigation is warranted, Baker may
perform a new rating (load or visual) if directed by the City. Such work will be considered out -of -
scope and not included with this work order.
B. Visual Rating
When applicable, Baker will prepare a visual rating for the inspected structure. The visual rating
shall be based on the condition of the structure at the time of the inspection and prepared in
accordance with the GUIDES AND REFERENCES as defined below.
C. Load Rating
When applicable, Baker will prepare a load rating for the inspected structure. The load rating shall
be based on the structure as originally constructed (if possible) and include such effects such as new
October 17, 2014 3 of 4
Exhibit A - Work Order Form
Bridge Inspection, Maintenance, Repair and Replacement Program—2013-2014 Minor Bridge Inspections
rehabilitation elements, deterioration or damage. The load rating shall be performed using Load
Factor Design methodology with the HS-20 design vehicle. All load ratings shall be prepared using
hand calculations, AASHTOWare VIRTISO software, and/or other applicable software. Quality
Control for the calculations and report shall be prepared in accordance with CDOT policy.
GUIDELINES AND REFERENCES
All inspections will be conducted in accordance with current NBIS standards and supervised by personnel
meeting the requirements outlined in the Code of Federal Regulations, 23 CFR 650.307. Applicable
inspection standards include:
• CDOT PONTIS Bridge Inspection Coding Guide
• Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation's
Bridges (Report No. FHWA-PD-96-001)
• Bridge Inspector's Reference Manual (Publication No. FHWA NHI 12-049)
• CDOT Bridge Rating Manual
• Any other applicable documents as approved by the City
DELIVERABLES
The following is an estimate of the deliverables required for this project. As the project develops, the type
and number of deliverables may vary. Refer to the detailed discussions above for further information. All
inspection information shall be compiled onto a single CD and delivered to the City at the end of the
project.
1. Project Administration (Ongoing)
• Monthly progress reports with monthly invoices
• Meeting and telephone conversation documentation
• Quality Control review of all project deliverables prior to submittal
2. Inspections (Delivered at End of Project)
• One printed copy of bridge inspection reports (rating form and photos in color)
• One PDF file of the bridge inspection report for each bridge inspected, including a one -
page summary sheet indicating "Urgent", "Routine", and "Safety Repairs Required",
with costs and sufficiency rating
• All photos in a digital format with descriptions
• Electronic sketches of the bridge in a Microstation format
• One PDF file of the load rating calculations, if applicable
• PONTIS output of six (6) tables in excel format (bridge, eleminsp, insp_wcand,
inspevnt, roadway, and userbrdg)
• Recommendations for re -rating of bridges, if any
3. Develop Structural Classification Spreadsheet
• Electronic version of the Excel spreadsheet
SCHEDULE
All work shall be completed by April 30, 2015.
October 17, 2014 4 o f4
Exhibit "B"
Task Order 16 Fee Summary
for
Michael Baker Jr., Inc.
City of Fort Collins
Bridge Inspection, Maintenance, Repair and Replacement Program
Description:
2014/2015 Confined Space Inspection and Safety Anchor Installation
Project Administration & Meetings
16
$2,265.72
Inspections
34
$5,469.48
Temporary Anchor Installation
84
$9,731.91
Structural Adequacy Spreadsheet -Update
8
$1,192.14
Subtotall
$18,659.25
REIMBURSQBLE(EXP,ENSE$:((Approximate
Copies & Plotting (B&W) (150 x $0.05)
$16.25
Copies & Plotting (Color) (200 x $0.50)
—
$212.50
Mileage (1 trip x 150 mi x $0.565 / mi)
—
$169.50
Subtotall
$398.25
SG§O sgft NU� { y ar x
J �T. h_...... ..-st,.b. ..1 ,..-.. .. o- �>. nF:z..l ,i �. n.r-. +i iY w.Y,�{_Fi
01 . �*
l� .-X's
N/A
0
0.00
Subtotall
0
0.00
111612014 1 of 1