PROJECT TITLE: Mason Grade Separation at NRRC - Steel Stairway
PROJECT NUMBER: 400903204
CONTRACTOR: Concrete Express, Inc. (PO #9141051)
CHANGE ORDER NUMBER: 1
1. Reason for change. 2. Description of change,
3. Change in contract cost. 4. Change In contract time.
1&2. See attached sheet for detail.
3. The contract cost will i oweeee by $20,056.90
4. There will be no change In contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
' dOSEPH M. aDEA
ACCEPTED BY:
REVIEWED BY:
SUBMITTED BY:
APPROVED BY:
11.64%
11.64%
$172,345.00
$0.00
$0.00
$20,056.90
$194401.90
DATE:
OATS: l \ r \� 1-
DATE: _/I - /A-/v
APPROVED BY: � DATE:
(Purchasing Agent over $60,DOD)
rx CanBeciOr
Purchasing
Project File
NRRC Stairway Project
Item# Item Quantitv unit $1 Unit Total
1
Contract Band
1
LS
$ 1,232.00
$ 1,232.00
z
Additional Steel Railing at NRRC Eastside Staima
11
LS
$ 5,800.00
S 5,800.00
3
Electrical Lighting System for Stairway
1
I LS
1 13024.9
$ 13,024.90
TOTAL
$20,056.90
Contract Bond was not included In the stairway pricing. Originally, the City was persuing a sole source for this work, but
1 Purchasing requried a contract because the scope of the work exceeded $50,000. The contract required a bond which was an
unforseen cost to CEI when they quoted the work.
Additional Steel Railing was requested by the City at the bottom level of the NRRC Ramps.
Electrical Ilghtings was not designed or priced with the stairway assembly contract. CEI has hired Sturgeon Electric to design
and install the lighting system. The City has approved the lighting design and pricing.
Posted to Pay Ado#2