HomeMy WebLinkAboutCHANGE ORDER - BID - 7391 MISCELLANEOUS CONCRETE ANNUAL (2)City of F&t Collins Chit W Order FCRRI PROJECT TITLE: 2014 SttW Mpinlene Program. Comele Coelrad PROJECT Nt1MBM* OW120.(SW/7961). - CONTRACTOR; Vogel Car*e%(PO914mI2) CHANGE ORDERNUMSER; 2 in prepoft dW" ordem Blow In order as eepmata nmoma0paraprephe fie Ion&A%V 1. ReM kw d wo9. 2. Daerip0on d &00% 3 CWV In ambad mst. 4. Chmp in c* iyad gm0. 1.1112. Die to aeugmrm of a WdWl to Ughmme Emelplleee, aba VWO Canatafa Inc, a Thb CDr&ad Cat •al be Uaclp W by SK41S.90. 4. Thelalwbenodl8n lowarad Oren ORIGK4L CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL TW CHANGE ORDER TOTAL % THIS CHANGE ORDER TOTAL GO. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED 19bom Mawman a Fopmm Planrdng, Devebpment s Transportation ea.at,Depsti mm A2SNkOSUM P.O. Sox S60 Fort Collins. CO 00522 05W 970.221.5S1S - MCA& 970221.6270. Fax .vrmrx��: _DATE: (pumbu pAWm orer300,000) as Caivaner Pwioliv P,*V Fft 51,578,461.70 (S900.372.09) S0.00 (t54,ad9g) 446% -OA4D% S026A72.79 �� 2t'�Q.Ut i� �o8u23 gnZl2o, 533 )O. Change Order No: 2 Date: 11/14/2014 Reason For Change: a. Vogel concrete was bought out by Keith LlghtBeld which required a new contract to be Issued 2) Description Of Change: a The original 2014 contract with Vogel Concrete was in the amount of $1,573,461.78. During the Months of May, June and one week in July Vogel used $528,672.79 of the contract monies. We transferred $990,372.09 of the 3) Changes In Contract Original Contract Money spent on Orginal Contract Money transferred to New Contract Money left on Original Contract 4) Total remaining in contract 5) Change In Contract Time