PROJECT TITLE: 2014 SttW Mpinlene Program. Comele Coelrad
PROJECT Nt1MBM* OW120.(SW/7961). -
CONTRACTOR; Vogel Car*e%(PO914mI2)
CHANGE ORDERNUMSER; 2
in prepoft dW" ordem Blow In order as eepmata nmoma0paraprephe fie Ion&A%V
1. ReM kw d wo9. 2. Daerip0on d &00%
3 CWV In ambad mst. 4. Chmp in c* iyad gm0.
1.1112. Die to aeugmrm of a WdWl to Ughmme Emelplleee, aba VWO Canatafa Inc,
a Thb CDr&ad Cat •al be Uaclp W by SK41S.90.
4. Thelalwbenodl8n lowarad Oren
ORIGK4L CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL TW CHANGE ORDER
TOTAL % THIS CHANGE ORDER
TOTAL GO. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
ACCEPTED
19bom Mawman a Fopmm
Planrdng, Devebpment s Transportation
ea.at,Depsti mm
A2SNkOSUM
P.O. Sox S60
Fort Collins. CO 00522 05W
970.221.5S1S - MCA&
970221.6270. Fax
.vrmrx��: _DATE:
(pumbu pAWm orer300,000)
as Caivaner
Pwioliv
P,*V Fft
51,578,461.70
(S900.372.09)
S0.00
(t54,ad9g)
446%
-OA4D%
S026A72.79
�� 2t'�Q.Ut i� �o8u23
gnZl2o, 533 )O.
Change Order No: 2
Date: 11/14/2014
Reason For Change:
a. Vogel concrete was bought out by Keith LlghtBeld which required a new contract to be Issued
2) Description Of Change:
a The original 2014 contract with Vogel Concrete was in the amount of $1,573,461.78. During the Months of May,
June and one week in July Vogel used $528,672.79 of the contract monies. We transferred $990,372.09 of the
3) Changes In Contract
Original Contract
Money spent on Orginal Contract
Money transferred to New Contract
Money left on Original Contract
4) Total remaining in contract
5) Change In Contract Time