Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CHANGE ORDER - RFP - P1080 PFA ARCHITECTURAL AND ENGINEERING SERVICES
CHANGE ORDER NO. 1 PROJECT TITLE: Fire Station 8 CONTRACTOR: Belford Watkins PROJECT NUMBER: PO 9955379 DESCRIPTION: Station 8 Architectural Design and Services 1. Reason for change: Relocation of station to new lot 2. Description of Change: Completion of architectural services for Station 8 3. Change in Contract Cost: $151,944.00 4. Change in Contract Time: June 1, 2016 ORIGINAL CONTRACT COST $ 235,000.00 TOTAL APPROVED CHANGE ORDER 151,944.00 TOTAL PENDING CHANGE ORDER 0 TOTAL THIS CHANGE ORDER 151,944.00 ADJUSTED CONTRACT COST $ 386,944.00 (Assuming c a e orders approved) ACCEPTED BY: I DATE: I r/ 1+ Contractor's Representative ACCEPTED. BY: t� �0�-4— DATE: /©A/y6Loiy Fire Chief REVIEWED BY: Title: Project APPROVED BY: over $60,000 _Contractor_. Project File Architect: Belford Watkins Engineer Purchasing TE: ��1 Z Resolution 14-15 Authorizing the Fire Chief to Amend a Contract with Belford -Watkins Architects Involving Expenditure Over $75,000 Whereas, the unanticipated relocation of Station 8 in Timnath to the Riverbend Subdivision has caused a need to modify the station design to fit the change in lot size, and Whereas, the cost of modifying the Station 8 design is $151,W, and Whereas, sufficient funds are available and appropriated within the Station 8 Capital Project; however, the Station 8 design cost of $151,944 is above the Fire Chiefs spending limit of $75,000. Now Therefore, the Poudre Fire Authority Board of Directors authorizes the Fire Chief to amend the contract with Belford -Watkins Architects, including the $151,944 expense to modify Station 8 design to fit the Riverbend Subdivision lot. Approved this W day of October, 2014, by the Poudre Fire Authority Board of Directors. -.,:;' PFA B and Chair �— I ,. i riST