Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7417 ASPHALT SURFACE TREATMENT PROJECT (5)Cit Of Planning, Development & Transportation Fort Colhns syntrrDepartment P.O. Box SOD / �••- Fort Collins, CO 60522.0580 970.221.5015 • Phone 070.221.6270 - Fa. Change Order Form PROJECT TITLE: 2014 Street Maimarlarlce Program, Asphalt Surface Maintenance PROJECT NUMBER: 902120 (Bid e7417) CONTRACTOR: A-1 Chipseal (PO 90143792) CHANGE ORDER NUMBER: 1 In preparing change orders show In order as sopwale numbered paragraphs the toADlWng: I. Reason for change. 2. Descnplhon of change. 3. Change In contract Coat. 4. Change in contract tins. 142. Increase In the Cost per square yard and Increase in area not in original contract Quantil(es. 3. The contract cost will be Increased by S274,655.00. 4. There n01 be no change In contract tine. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST 26.60% 20.60% $1,029.556.05 $0.00 SODO $274,655.60 51,304,211AS ACCEPTED BY: �<:-z t 'r! + k- GATE: (U ItqIILi Y Coll SUBMITTED BY: _„�J r! - A—` DATC: 10 pYJ I� ($treat Maintenance Program agar) SUBMITTED BY: A DATE: (CN sl on Inepecto (0 2� / f APPROVED BY: - —q DATE: (96rChasing Agent Was 500,OOD) Contract Pwow" P.*1 Fla P� it gp2-11( . 533o ( o �eA0-0�( o;35a�rag Change Order No: 1 Date: 10/16/2014 1 Reason For Change: a. Changed all treatments from slurry seals to Capeseals b. Added Castle Ridge area as a Slurry treatment 2 Description Of Change a. cast increased $2.39 per S.Y., was $2.24 is now $4.63 per S.Y. b. This area was not in the original contract quantities 3 Change In Contract Amount: Item Qty Unit Unit Cost Total Cost CAPE SEAL a' 409.09 (RESIDENTIAL) 111307.566 SY $ 2.39 $266,025.08 b. 409.06 TYPE II SLURRY SEAL 3,853 SY $ 2.24 $8,630.72 (RESIDENTIAL) TOTAL CHANGE 1N CONTRACT AMOUNT TOTAL $274,655.80 4 Change In Contract Time a. one day TOTAL CHANGE IN CONTRACT TIME I