HomeMy WebLinkAboutCHANGE ORDER - BID - 7579 RIVER RESTORATION AT WOODWARD TECHNOLOGY CENTER LOT 4 (4)F®rt Collins
Natural
Areas
BID NUMBER: 7579
CONTRACTOR: Walsh Construction Inc.
CHANGE ORDER NUMBER: 4
Natural Areas
9745 Hna . MM Roan
PO. aoa 580
Fon Coons. CO &1622 6580
970.418.2815
9794162211-W
Change Order Form
1. Reason for change: See Attached Exhibit A dated September 29, 2614
2. Description of Contract Change; See Attached Exhbit A dated September.29, 2014
3. Change in Contract Cost: See Attached $ 395,800.40 ncrease Decrease
4. Change in Contract time: See Attached a66 days Increase Decrease
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
APPROVED BY:
APPROVED BY:
a: CpIbeClOr.
Purchdhy
PrcjW Film
4e33ff
$1,994,383.00
($49.625.00)
$0.00
396.800.40
19.85%
17.35%
$2,340,358.40
DATE:
DATE: /C9 2/
DATE: /O Lz
O
O
O
O
O
O O
U
m
O
YI
r
O
h
(O]l
v
C
w
r
w
w
w
w
w
w
w
N
w
w
w
N
w
w
N
w
N
w
w
w
w
w w
w
0
0
o
0
o
o
r
w
o
vi
o
J
6
ry
e
h
ro
a
0
o
0
O
U
tq
N
N
M
w
N
N
w
w
w
N
w
N
w
N
w
N
w
N
w
w
O
O
O
O
J
w
w
J
r
F
� O
m LL 6
oLL� J
M O
Q Z
O
w
U K
w
w
w
N
w
N
Ww�
w
m W
J z j
z z
m J
U N Q
?'a
rc
O w
J m a
y6
N
N
N
N
f9
N
N
w
w
w
N
N
w
M
w
N
N
N
N
N
w
as
O q
Qr J
a
w C,
G
m
s 5
w
NwNwNwwwwww
wwwwwwwww
O
Z J
Q
x a J
U
w
� r
tt
m 7
J
J
LL
J
Q
O Q 7
O < O
� m
Itl K 1-
X
Z
J
Q
z m f
r
z
w
UZ w U
U
r
p it2)
g
m
o
o.2
mm
<
a
OK
<
¢
Q _J
w
<>
Z
S O Z
O
%
w K
J
O
U m LL r
C
O
N
Z
O Z J
Q
F
� C � ZU
rc
WO p
w
O 3 LL 2
U
w
3
O Q N
¢
U
Z K U
wm
m
mg3
w
LL
�Oa
�.
wz
wNm
3?
wa0O
U<
m w
ww0
O N
LLm
¢ z O J
WQN<O
Q<
O D U
W r
m
O W W O U
�<
2zor
a0<
3�
W
TF Wo
� City of
Fort Collins
Invoice
Wm. T. Welch Company LLC
Attn: Will Welch
1315 Oakridge Drive, Suite 100
Fort Collins, CO 80525
- . Customer #5222.17_
utilities
electric • storrnwater • wastewater • water
700 Wood St.
PO Box 580
Fort Collins, CO 80522
970.221.6700
970.221.6619 fax 970.224.6003 TDD
utilities@fcgovcom fcgovconr/utlNties
September 4, 2014
Remit to:
City of Fort Collins
117 N. Mason Street
P.O. Box 580
Fort Collins, CO 80522-0580
Imoice-#6.549Z_ --_- _-- -
DESCRIPTION
Charge for Temporary Wastewater Discharge Permit for Woodward Campus Construction.
CHARGES
CREDITS
BALANCE
Fixed Charge Calculations:
Use Calculations:
PIF Calculations:
Total Due:
$7.81
$116.08
$ 895.64
$1,019.53
Terms: This bill is due and payable 30 days from invoice date.
If you have any questions, please contact Jon Haukaas at (970) 221-6671.
City use:
5030.453020 - $109.51
5030.453090 - $6.57
5030.473120 - $903.45
Qlr
<nncy@walshoonstruction.us> d?
To: "William Welch" <wwelch@wmtwelch.com>
Woodward CO#4
Hi Will
Please find attached signed CO#4.
PLEASE CONFIRM RECEIPT OF THIS EMAIL.
Nancy Hall
Walsh Construction Inc.
591 benver Ave.
Loveland, CO 80537
970-622-8227
Fox 970-278-9396
noncy@walshconstruction. us
CO#4.odf (4.7 M81
October 8, 2014 12:06 PM
10-16-14
7579 River Restoration at Woodward Technology Center Lot 4
Justification for Change Order 4 - Over the 15% Line Item pricing
This change order included site and trail repairs following the 2014 high water runoff event.
The total change order was $395,800 and was $104,117 over the allowed 15%
for all change orders. The contractor was on site and it was cost efficient for
them to complete the job.
Although some of the repairs did not include line item pricing, the following line item
prices were needed to complete the work and are from the original bid schedule from
Walsh Construction. These prices were used to complete the work required to reestablish
the site and trail repairs.
Contract Unit
Item q Description Unit Quantity Price Total
506 RiprapTypeM CY
779 $72
$56,088.00
608 Crusher fines SY
675 $18
$12,150.00
10' Poudre River
608 Trail SY
809 $54
$43,686.00
Total
$111,924.00
The following is from the City of Ft Collins Charter
Sec. 8-161. Exemptions to use of competitive bid or proposal.
(f) Materials, certain services and construction competitively bid within twenty-four (24) months. In any
case where the City has, within the preceding twenty-four (24) months, pursuant to an invitation for
bids, awarded a contract for the procurement of any materials or for the procurement of services,
professional services or construction bid on a unit price basis, the Purchasing Agent may negotiate with
the successful bidder for the purchase of additional quantities of the materials or units of services or
construction. The Purchasing Agent may, based upon a reasonably prudent investigation of market
conditions at the time, make procurements at a price warranted by such conditions, even if the resulting
cost to the City is greater than the amount of the previous award.
0
0
0
Addendum 1- Revised Did Schedule
7579 River Restoration at Woodward Technology Center Lot 4
qB16
--'CONT"CT
4 �M,OVN--
49
U IT
'
��PLANMg
m-',
1. V
UNITPRJCE&��
'N"M
A MYNT
gg
1
202
Removal of Concrete Revetment
LF
270
$10.00
$ 2,700.00
2
203
Unclassified Excavation
CY
16689
$4.00
$ 66,756.00
3
206
Structure Excavation
CY
79
$30.00
$ 2,370.00
4
206
Structure Backfill (Class 1)
CY
76
$35.00
$ 2,660.GO
5
207
Topsoil (6,lnch) (Redistribute)
CY
21802
$3.00
$ 65,406.00
6
208
Erosion Control (SWMP S, Maintenance)
LS
1
$8,000.00
$ 8,000.00
7
208
1 Erosion Log (12 Inch)
LF
230
$4 OD
$ 920.00
8
208
Erosion Log (18 Inch)
LF
2700
$400
$ 10,800.00
9
208
Erosion Control Supervisor
Hit
80
$30.00
$ 2,400.00
10
211
Dewatering and Diversion
LS
1
530,ODO.00
$ 30,ODO.00
ii
212
Seeding(Native)
AC
29
$800.00
$ 23,200.00
12
212
Soil Preparation
AC
29
$6,800.00
$ 197,200.00
13
213
Mulching IHvdm Mulch)
AC
30
$1.300.00
$ 39,000.00
14
213
Boulder Wall(Complete)
LF
54
$150.00
$ 81100.00
15'
21*4
Deciduous Tree (3"Caliper)
FA
233
$500.00
$ 126,500.00
16
214
Deciduous Tree (Container- Contract Grow)
EA
115
$100.00
$ 11,500.00
17
214
Deciduous Shrub (S Gallon Container -Contract Grow)
EA
802
$20.00
$ 16,040.00
is
214
Brush Layer Cuttings (Live Makes)
CA
360
$10.00
$ 3,600.DD
19
214
Live Plantings (Plugs - Contract Grow)
EA
76037
$1,00
76,037.00
20
214
Landscapelml Intenance (24 Months)
Is
1
$60,000.00
60.000.00
21
216
Coir Matting (Channel Bank Protection)
5Y
1738
$4.00
6,952.00
22
216
Soil Retention Blanket f5traw/C-conut)
SY
3693
$3.00
11,079.00
23
226
Ag,,e,.te Base Course Class 5 or 6 (S'Loop Trail)
CY
234
$45.00
$ 10,530.00
24
306
Recondition Subgrade (12 Inch Depth)
SY
5956
52.00
$ 11,912.00
25
S06
Rlprap (Type L, 9 Inch at Spillway)
CY
72
$80.00
$ 5,760.00
=2E;--
506 llffixm
(Ty-O—e M:12 lhch at FES outfall and bridge crossing)
CY
46
$80.00
$ 3,680.00
*27.11
506 Ifilprap,
(Type 10112 Inch for Bank Stabilisation)
CY
5105
$72.00
$ 367,560.00
28
601
Concrete Class D (BoulderWall -Foundation)
CY
4
$650.01)
$ 2,600.00
29
601
Concrete Class 0 (Bridge Abutment, WIngwalls, Weir)
CY
41
$400.00
$ 16,400.00
30
602 _
Reinforcing Steel
LB 1
3600 1
$2.0D 1
$ 7,200.00I
31
603
121nch HDPE Storm Pipe FES Included)
1F
183
$30.DD
$ 5,490.00
32
604
ADS Area Inlet
FA
1
$1,506.00
$ 1,500.00
33
604
4" Irri ation Meter (Complete)
EA
1
$15,000.00
$ 15,OOD.00
34
607
Fence (Tree Protection - Adustments)
LS
1
SS,000.DD
$ 5,000.00
35
607
Fence (Waterfowl Exclusion Fence)
LF
5386
$3.00
$ 16,164.00
36
608
4lCrusher Fine Path 41nch) .
SY
2430
$18.0D
$ 43,740.00
37
6D8
10'.Poudre River Trail (Colored, 5 Inch)
SY
3209
$54.00
$ 173,286.00
38'
619
12"x4" Tapping Saddle
EA
1
$1,250.00
$ 1,250.00
39,
619
4" Gate Valve
EA
1
$900.00
$ 900.00
40
619
4" Water Line (PVC C-900)
LF
62
$40.00
$ 2,48D.00
41
621
24'Gravel Access Road
LF
2020
$30.00
$ 60,600.00
42
622
Bench
EA
8
$600.00
$ 4,800.00
43
623
12"x17" Irrigation Valve Box (pi exometercover)
EA
1
$100.00
$ 100.00
44
623
Irri aVan Controller
EA
1
$6,000.00
$ 6,000.00
45
623 1
Reduced Pressure Assembly
EA
1
$H,000.00
$ 8,000.00
46
623
Master Control Valve Assembly
EA
1
$0.00
$
47
623
8"Gate Valve Assembly
EA
1
$1,200-00
$ 1,200.00
48
623
6" Gate Valve Assembly
EA
4
$700.00
$ 2,800.00
49
623
4"Gale Valve Ass embly
EA
1
$S50.00
$ 550.00
50
623
8"Class 200 PVC Irrigation Mainline Pipe and Fittings
LF
778
$23,00
$ 17,894-.00
51
623
6"Class 200 PVC Vdgallon rv.wune Vleand Fltlipgs
LF
5651
$17.00
$ 96,067.00
52
623
4" Class 200 PVC Irrigation Mainline Pipe and Rs llin
LF
441
$12.00
$ 5,292.00
53
623
3"Class 200 PVC Irrigation Mainllne, Pipe and Fittings
LF
1437
510.00
$ 14,370.00
54
623
3/4" Polyethylene Drip Lateral Pipe and Fittings
IF
38133
$1.00
$ 38,133.00
55
623
16"Class 200 PVC Irrlgalion Pipe Sleeve'
LF
20
$40.00
$ 80D.00
56
623
12" Class 200 PVC Irrigation Pipe Sleeve
LF
198
$32200
$ 6,016.00
57
623
8" Class 200 PVC Irrigation Pipe Sleeve
LF
12
$30.00
$ 360.00
58
623
6" Class 200 PVC Irrigation Pipe Sleeve
LF
8
$26.00
$ 208.00
59
623
2" Gass 200 PVC Irrigation Pipe Sleeve
LF
205
$14.00
$ 2,870.00
60
fi23
Drip PI Flush Cap Assembly
EA
141
$65.00
$ 9,165.00
61
623
Remote Control Drlp Valve Assembly 1")
EA
47
$450.00
$ 21,150.00
62
1 623
Nelson Big Gun QC Valve Assembly (Female)
EA
37
$900.00
5 33300.00
i
0
63
623
Nelson Big G un Assembly with Male QC Valve and Riser
EA
5
$1,700.00
$ 8,500.00
64
623
Manual Drain Valve Assembly
EA
9
$350.00
$ 3,150.00
65
623
1" Quick Coupler Assembly
EA
3
$400.00
$ 1,20D.00
66
623
Drip Emitter Assembly (1 GPH)
FA
•3798
$2.0D
$ 7,596.00
67
623
Control Wire
LF
6870
1 $1.00
$ 6,870.00
6B
623
Decoders
EA
48
$140.00
$ 6,720.00
69
625
Construction Surveying
LS
1
$15,000.00
$ 15,000.00
70
626
Mobilization
LS
1
$100,000.00
$ 1G0,000.00
71
628
Bridge Girder and Deck Unit(20'Pedestr'ran Bridge)
EA
1
$33,000.00
$ 33,000.00
72
629
Traffic Control Bike and pedestrian)
l5
1
$6,000.00
$ 6,000.00
TOTAL BASE BIO
$1964 , 3- O
IN WORDS Innil(levs /'Vc
ADD ALTERNATES
Dz
��
?� a
r
3
SNp t
r[ONTHNCT
>tITEM;NO
z'r CONTRACT DESCRIP710N dE"�"t7*`
a -� �y
_j-._.Ki.=..+•:.�a...
UNR
s�TRAIL�
sUNIFPRI[E
e.-'e r.-
s -, .kTOTAL �-
Poudre trail completion Japan the public) dale: March 15, 2014
ALT
including adjustment to traffic control duration, temporary
LS
1
$ 25,000.00
k1
construction fence placement/relocation
$25,OOD.00
ALT.
Exclude Landscape Maintenance 124 months), Irrigation System
M2
Operation, and Wa"ntee of plants
IS
1
-$60,000.00
$ (60,000.00)
Exhibit A
Change Order: 4
Dated: September 29, 2014
Project: 7579 River Restoration At Woodward Technology Center Lot 4
To: Walsh Construction, Inc.
8139 Open View Place
Loveland, CO 80537
Title: Proposal Requests for a) site, and trail repairs and adjustments
following 2014 high water runoff event; b) waterfowl exclusion
fencing and miscellaneous esthetic items; c) Miscellaneous other
changes and charges.
Item
Description
Cost
1a.
Proposal Request #8: Site, and trail repairs and adjustments
Increase Cost
following (2014) high water runoff event:
$380,756.40
Furnish the supervision, labor, material, equipment and indirect
expenses to complete the work required by Proposal Request
Number 8 dated 8/8/2014, prepared by BHA Design, Inc., including
the requirements, reports and plans; and per Walsh Construction
Inc. Change Order Proposal COP O15 Rev 1 dated 9/15/2014,
attached hereto. This increase in Contract Cost shall account for all
cost impacts to the Contractor due to the Poudre River leaving its
bank referenced in Change Order #2.
The Contract Time shall be extended 66 calendar days. This shall
account for the time lost to the Poudre River leaving its bank
referenced in Change Order #2.
2.
Proposal Request #10: Waterfowl exclusion fence and cross wires;
Increase
remove red sandstone and concrete slabs along river bank:
$15,554.00
Furnish the supervision, labor, material, equipment and indirect
expenses to complete the work required by Proposal Request
Number 10 dated 9/24/2014, prepared by BHA Design, Inc.; and
Walsh Construction Inc. Change Order Proposal COP 016 dated
10/1/2014, attached hereto.
The Contract Times shall not be changed.
3.
Charge for Temporary Wastewater Discharge Permit for
Deduct
Woodward Campus Construction per City of Fort Collins Invoice
($510.00)
#65497 dated September 4, 2014. Invoiced value of $1,019.53 paid
by Owner is split between Owner and Contractor.
The Contract Times shall not be changed.
.
§§;,l-l•�t..!!!
„
!!!rrl.<!l.rr
!
}}\//\}///\//\/}//\j/////(/
:
\ )
.........\\.\
§
§�
4
...,.�........../
.............
!
k )
.
!
:_
\
�)}\EE�
1!,_
§
Proposal Request PR#: 8
Pricing/Response Form 8/8/2014
Owner: City of Fort Collins
Project Name: Woodward Technology Center - Lot 4 River Restoration
Architect: BHA Design Inc. Contractor:Walsh Construction. Tnc.
Please submlt an ftemized proposal for changes in the Contract Surn/Time for proposed modifirationsto the Contract Documents described herein. Submit
propos t within 10 days, "notify the Archded in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A
CCD, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED.
Description of Change:
Site and trail repairs and adjustments following high water runoff event on the LNG site as per attached plans. Changes
Grading changes
Plant relocations
Trail vertical adjustments and reinforcements in spill areas
Erosion control measures
detailed costs for work change request
� I
CONTRACTOR BLOCK
NO CHANGE ❑ Contingency Deduct
ADD ❑ Allowance
DEDUCT Contractor's PCO #
The Contract Time will be (increased) (decreased) (unchanged) by ( ) days.
This information shall be valid for thirty (30) calendar days from the date of signature below.
Contractors Signature: Date:
REVIEW AND APPROVAL BLOCK
Contingency ugges
(Check One:) Approved Rejected Deduct Allowance Amount Time
Architect: ❑ ❑ ❑ ❑
Comments
Date:
Contingency
(Check Oae:) Approved Rejected Deduct Allowance
Owner. - ❑ ❑ ❑ ❑
Signature
Comments:
Date:
Proposal Request
Pricing/Response Form
Owner: City of Fort Collins
PR #: 10
9/2Arz014
Project Name: Woodward Technology Center - Lot 4 River Restoration
Architect:
Walsh Construction, Inc.
Please submit an dem¢ed pmpos. l for changes In the Contract sumrrime for proposed modRcations to the Contract Documents described herein. SubmI
proposal within 10 days, or notify the Architect in writing of the date on which you anticipate submitting your proposal. THIS IS NOT A CHANGE ORDER, A
CCU, OR A DIRECTION To PROCEED WITH THE WORK DESCRIBED,
icription of Change:
Install cross wires over the mix 2 and 3 planting areas. Include reflective tape at 40' spacing. Use 10' x 10' cross pattern at
south east end of pond where fences are more than 15' apart Use.zig zag pattern for remaining portions of pond edge
(<15' between fences).
Remove exposed red sandstone and concrete slabs along the river bank. Include any stones larger than U' x IT'that are
clearly visible and not bound by live roots. Cover remaining cobbleMp rap with a V-7of topsoil prior to seeding.
Add green protection fence around mix 3 basin (area to be planted with excess mix 1 plugs).
Remove remaining mulch from tree protection areas. Prepare mulched areas with 1"-7'top soil prior to seeding. Remove
tree protection fencing prior to seeding.
CONTRACTORBLOCK
NO CHAT
ADD
DEDUCT
The Contract Time will be (increased) (decreased) (unchanged) by (
❑ Contingency Deduct
❑ Allowance
Contractor's PCO #
) days.
This information shall be valid for thirty (30) calendar days from the date of signature below,
Contractors Signature: Date:
REVIEW AND APPROVAL BLOCK
Architect:
Comments:
Date:
Owner:
Comments:
Date:
Contingency
(Cbmk OneJ Approved Rejected Deduct Allowance
❑ ❑ ❑ ❑
Contingency
(Cheoka.c:) Approved Rojeoted Deduct Allowance
❑ ❑ ❑ ❑