EXHIBIT "A"
WORK ORDER FORM
AGREEMENT BETWEEN THE'CITY OF FORT COLLINS
AND BANNER CONCRETE, INC.
BID NO: 7658 MISCELLANEOUS CONCRETE
Email work orders to bannerconcrete(okmail.com
DATE: l- 4 2014 WORK ORDER NO: STS 2014-01
REQUESTED BY: Angel Ontiveros PHONE NUMBER: 970-218-1973
BILL TO (name, address, zip): Annel.Ontiveros
EMAIL ADDRESS: aonfiverosQf aov com DEPARTMENT: Streets
PROJECT TITLE/DESCRIPTION: Miscellaneous Concrete Pheasant Dr.
SCOPE OF SERVICES: R&R D06 at 1119. COST: $5.211.a4
1131 1136. Rampat S_WC of Pheasant Dr.
and Paragon PI.
COMMENCEMENT DATE: a/4/14
CITY OF FORT COLLINS:
BY: Ansel Ontiveros
COMPLETION DATE: 811512014
DATE: 8/4/2014
Banner Concrete, LLC. agrees to perform the services identified above and on the attached forms in accordance
with the terms and conditions contained herein and in the Services Agreement between parties. In the event of a
conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached
forms), the Services Agreement shag control.
BANNER COJJGRETE, LLC �a/�
BY: '°='r`-T��7[DATE:
CC: Purchasing; the attached fonn(s) consisting of _ page(s) are hereby accepted and incorporated herein by this
reference, and Notice to Proceed is hereby given.
s: ^
g- 2.
I T
Bill To
City Ft. Collins Streets/Angel Ontiveros
715 Peterson Street
Fort Collins, CO 80524
bannerconcrete@gnail.com
Accounting:970-219-1026
QOZ150
Invoice
Date Invoice #
9/20/2014 1254
P.O. No.
Terms
Net 30
Quantity
Description
Rate
Amount
PHEASANTIPAPAGON
450.12
Remove monolithic curb, gutter & sidewalk per sq It
3.25
1,462.89
69.25
Driveover curb, gutter & 6" sidewalk per If
26.00
1.800.50
127.5
Remove concrete sidewalk per sq A
3.25
414.32
127.5
Pedestrian access rump per sq fl
5.50
701.25
8
Truncated dome panel per sq fl
30.00
240.00
181A6
Remove corrcrele driveway'apron!crosspan per sq fi
3.45
626.04
181.46
Aprm1--8" per sq ft
5.00
907.30
73.4
Asphalt pavement preservation per If
4.00
293.60
74
Sawcut concrtsWasphall 6"<8" per If
5.50
407.00
4.3
Expansion and caulking per If
5.25
22.58
3
Excavation -General less than 50 cu yd
90.00
270.00
T35
Aggregate base courseiRecycled base>5 tons
35.00
257.25
1.5
Temporary asphalt patching per ton
190.00
285.00
12
Size A sign with stand per each per day
1.62
19.44
100
Channelizing barrels per each per day
0.86
86.00
80
Cone with reflective strip per each per day
0.70
56.00
12
"No Parking" sign with stand per each per day
1.89
22.68
9
Traffic control supervisor per hour
33.50
301.50
streets
DOPMUMM
Arm MkSL. CIk,Gftf S f
Work Orderlillilitussi
Total S8.173.41