Loading...
HomeMy WebLinkAboutBID - 7660 BLOCK 32 DECONSTRUCTION (2)Addendum 2 – 7660 Block 32 Deconstruction/Dismantle Page 1 of 2 ADDENDUM NO. 2 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7660: Block 32 Deconstruction/Dismantle OPENING DATE: 3:00 PM (Our Clock) July 22, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed as follows: Exhibit 1 – Questions & Answers Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 2 – 7660 Block 32 Deconstruction/Dismantle Page 2 of 2 EXHIBIT 1 – QUESTIONS & ANSWERS 1. During the pre-bid walk on June 24, 2014 it was stated that the public sidewalks would not be removed. The contract documents state for the “contractor to deconstruct building structure, concrete slabs, foundations, paving and sidewalks.” Please clarify the sidewalks to remain. Response: The alley on the east side of 212 LaPorte shall remain, the construction fence will be installed approximately 6’ east of the building line. Approximately 15’ from back of street curb shall remain in place along LaPorte Avenue to the South and along Howes Street to the West. The alley along the north side of 208 Howes shall remain, the construction fence will be installed 3’ off the north side of the building line. 2. Who shall be responsible for the soil compaction inspections and test for backfilling of the site? Response: The City of Fort Collins will contract for the soil compaction inspections and testing. The contractor will be required to coordinate the necessary testing to ensure the soil compaction requirements are achieved. 3. Can another job walk be scheduled? Response: The City of Fort Collins is adding another building to the deconstruction/dismantle bid package and it is located at 500 Riverside Blvd. We will have another job walk to allow contractors to view the original three buildings and the new building added. This next job walk is scheduled for July 10, 2014 at 10:00 am at 212 Laporte Ave, Ft Collins.