Loading...
HomeMy WebLinkAboutBID - 7664 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROADADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road OPENING DATE: 3:00 PM (Our Clock) July 23, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: 1. The Opening Date has been changed to 3:00 PM (our clock) on July 23, 2014. 2. Additional Information Exhibit 1 – Revised Bid Schedule Exhibit 2 – Questions & Answers Exhibit 3 – Description of Revisions Exhibit 4 – Revised Specifications Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 1 of 12 EXHIBIT 1 – REVISED BID SCHEDULE BID NO. CONTRACT ITEM NO. CONTRACT DESCRIPTION UNIT TRAIL PLAN STRUCTURAL PLAN TOTAL UNIT COST TOTAL COST 1201 Clearing and Grubbing LS 1 0 1 $ ‐ 2202 Removal of Trees EA 5 0 5 $ ‐ 3202 Removal of Concrete Sidewalk SY 172 0 172 $ ‐ 4202 Removal of Asphalt Mat SY 282 0 282 $ ‐ 5202 Remove 12" Water Line LF 132 0 132 $ ‐ 6202 Removal of Barricade EA 1 0 1 $ ‐ 7202 Removal of Fence LF 315 0 315 $ ‐ 8202 Remove & Replace or Protect Existing Landscaping LS 1 0 1 $ ‐ 9203 Unclassified Excavation CY 2910 0 2910 $ ‐ 10 206 Structure Excavation CY 0 1910 1910 $ ‐ 11 206 Structure Backfill (Class I) CY 0 954 954 $ ‐ 12 207 Topsoil (4‐inch) (Remove, Stockpile, Redistribute) CY 2090 0 2090 $ ‐ 13 208 Erosion Control LS 1 0 1 $ ‐ 14 210 Reset Ground Sign EA 2 0 2 $ ‐ 15 210 Reset Gate EA 2 0 2 $ ‐ 16 210 Reset Riprap LS 1 0 1 $ ‐ 17 211 Dewatering LS 1 0 1 $ ‐ 18 212 Seeding (Native) AC 2.702.7 $ ‐ 19 213 Mulching (Weed Free Hay) AC 2.702.7 $ ‐ 20 216 Soil Retention Blanket (Straw/Coconut) SY 580 0 580 $ ‐ 21 304 Aggregate Base Course (Class 6) CY 45 56 101 $ ‐ 22 403 Hot Mix Asphalt (Grading S)(75)(64‐22) TON 119 0 119 $ ‐ 23 420 Geosynthetic Pavement Interlayer SY39039 $ ‐ 24 503 Helical Piers (40' Bridge) LF 0 40 40 $ ‐ 25 503 Drilled 12" Caisson (100' Bridge) LF 0 120 120 $ ‐ 26 601 Precast Concrete Underpass System LS 0 1 1 $ ‐ 27 601 Precast Concrete Erection LS 0 1 1 $ ‐ 28 601 Structural Concrete Coating SF 0 2976 2976 $ ‐ 29 601 Structural Concrete Casting (Anti‐Graffiti) SF 0 2976 2976 $ ‐ 30 603 18 Inch Reinforced Concrete Pipe (FES Included) LF 183 0 183 $ ‐ Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 2 of 12 31 603 24 Inch Reinforced Concrete Pipe LF50050 $ ‐ 32 604 Precast Concrete Area Inlet EA 1 0 1 $ ‐ 33 604 Manhole (48‐inch) EA 2 0 2 $ ‐ 34 606 Bridge Rail Type 10 LF 0 128 128 $ ‐ 35 606 Guardrail Transition Type 3H EA 1 0 1 $ ‐ 36 606 Guardrail Transition Type 3G EA 1 0 1 $ ‐ 37 606 Guardrail Straight Flare End Anchor EA 1 0 1 $ ‐ 38 606 Guardrail End Type 3D EA 1 0 1 $ ‐ 39 607 Wooden Rail Fence LF 269 0 269 $ ‐ 40 608 8' Concrete Bikeway (5 Inch) SY 430 0 430 $ ‐ 41 608 10' Concrete Bikeway (5 Inch) SY 5537 0 5537 $ ‐ 42 608 Access Ramp w/ Truncated Domes EA 2 0 2 $ ‐ 43 609 2' Concrete Pan LF31031 $ ‐ 44 609 Hollywood Curb & Gutter LF80080 $ ‐ 45 613 Lighting System LS 0 1 1 $ ‐ 46 614 Signs EA 6 0 6 $ ‐ 47 619 12 Inch PVC C‐900 Waterline LF 150 0 150 $ ‐ 48 619 12 Inch 45° Horiz. Bend w/ Thrust Block EA 4 0 4 $ ‐ 49 619 Air Relief Valve EA 1 0 1 $ ‐ 50 626 Mobilization LS 1 0 1 $ ‐ 51 627 Pavement Markings SF 108 0 108 $ ‐ 52 628 Bridge Girder and Deck Unit (40 foot) EA 0 1 1 $ ‐ 53 628 Bridge Girder and Deck Unit (100 foot) EA 0 1 1 $ ‐ 54 630 Traffic Control LS 1 0 1 $ ‐ 55 631 Pedestrian Bridge Abutment (40 foot Bridge) EA 0 2 2 $ ‐ 56 631 Pedestrian Bridge Abutment (100 foot Bridge) EA 0 2 2 $ ‐ TOTAL BASE BID $ ‐ IN WORDS: Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 3 of 12 EXHIBIT 2 – QUESTIONS & ANSWERS (1) Can a four-sided box be used as an approved alternate for the underpass structure? No, please bid according to the contract docs. (2) Is there any way to itemize the Helical Piers for the 40’ bridge as its own bid item so it can be measured and paid by the LF? This will help remedy any source of contention down the road since the required depths are unknown to meet the torque specs. A new bid item will be added for the helical piers. (3) Can the 12” caissons also be broken out as its own separate item just in case we need to go deeper than expected? A new bid item will be added for the 12” caissons. (4) There doesn’t seem to be a toe wall associated with the box culvert. Is this correct? The toe wall is only required at the wingwalls, see detail D on sheet S04. (5) It is understood that the city will be providing construction surveying. Will the city also be doing the certified as-builts that is needed to meet the floodplain requirements? Yes, the City will be doing the as-built surveying to meet floodplain requirements. (6) To clarify, the bid item “Precast Concrete Underpass System” is just for the material of the precast concrete and item “Precast Concrete Erection” includes the setting of this system. Is this correct? Correct, delivery of the materials should be considered incidental to either bid item. (7) Please clarify what is all in the bid item, “Concrete Class D (Wall).” Other than the bridge abutments (which is way less than 67 CY), I don’t see any structural concrete on the plans. The Concrete Class D (Wall) quantity should be zero. The Reinforcing Steel item quantity should also be zero. The wingwalls are included in the Precast Concrete Underpass System item. Topping concrete within the underpass will be included in the 10’ Concrete Bikeway item (discussed below in #8). Concrete and reinforcing for bridge rail curbs should be considered a part of the Bridge Rail Type 10 (Special) item. Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 4 of 12 (8) Are the bridge abutments incidental to the bridge bid items or they included in the “Concrete Class D (Wall)?” A new bid item will be added for the bridge abutments. (9) In regards to the cast in place concrete topping inside the box, in what bid item is this getting paid? The concrete topping inside the box shall match the 10’ Concrete Bikeway and that quantity is included with that item. (10) On Sheet C13, there is a reference to a Bentonite Blanket. Where does this get paid and what are the specs? The Bentonite Blanket will not be required. (11) Is a 404 permit required for this project? Yes, the Owner has acquired a Nationwide Permit No. 14 for the project. The CONTRACTOR is responsible for 100% compliance of all work accomplished in accordance with the terms and conditions of the nationwide permit. (12) Does asphalt need Flyash? No (13) Will CDOT be reviewing and approving the bridge drawings? No Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 5 of 12 EXHIBIT 3 – DESCRIPTION OF REVISIONS I. Revisions to the Plans/Bid Tab: A. BID TAB - The bid schedule has been amended as follows:  ADDED – item 503 Helical Piers (40’ Bridge)  ADDED – item 503 Drilled 12” Caisson (100’ Bridge)  DELETED – item 601 Concrete Class D (Wall)  DELETED – item 602 Reinforcing Steel  ADDED – item 631 Pedestrian Bridge Abutment (40 foot Bridge)  ADDED – item 631 Pedestrian Bridge Abutment (100 foot Bridge)  DELETED – F/A Erosion Control C. SHEET C3 – Summary of Approximate Quantities has been revised and attached. D. SHEET C13 – has been revised. Bentonite blanket note has been removed. E. SHEET S05 – has been revised. Note 7 has been revised to include concrete and reinforcing for the bridge rail curbs. II. Revisions to the Project Contract Documents: A. The Project Special Provisions table of contents has been updated B. A new project special item has been added to the project under section 631:  Pedestrian Bridge Abutment  This Special has been ADDED. It is intended to apply to both of the pedestrian bridges abutments. Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 6 of 12 PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD SUMMARY OF QUANTITIES 02/14/14 NA NA SMB MPO C3 Park Planning & Development 215 N.Mason Street Fort Collins, CO 80522 970-221-6360 Revisions No. Date Description By Revisions No. Date Description By SUMMARY OF APPROXIMATE QUANTITIES EXHIBIT 4 - REVISED SPECIFICATIONS Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 7 of 12 Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 8 of 12 7. PAYMENT WILL BE MADE UNDER ITEM 606, BRIDGE RAIL TYPE 10 (SPECIAL) FOR ALL POSTS, POST ANCHORS, BASE PLATES, BACKING PLATES, ANCHOR BOLTS, MISCELLANEOUS BOLTS, NUTS, WASHERS, TUBES, END PLATES, END TRANSITION, CORED HOLES, GROUT, REFLECTOR TABS, AND CONCRETE AND REINFORCING FOR BRIDGE RAIL CURBS. 8. PRIOR TO FABRICATION OF THIS ITEM, THREE SETS OF WORKING DRAWINGS WHICH COMPLY WITH THE REQUIREMENTS OF SECTION 105, SHALL BE SUBMITTED TO THE ENGINEER FOR INFORMATION ONLY. 9. STRUCTURAL STEEL: AASHTO M-183 (ASTM A-36) fy=36,000 psi ASTM A-588 fy=50,000 psi ASTM A-847 fy=50,000 psi 10. REFLECTOR TABS SHALL BE LOCATED ON EACH POST. SEE M-606-1 FOR DETAILS. OMIT REFLECTOR AT BEAM TERMINAL SECTION. Revisions No. Date Description By Revisions No. Date Description By Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 9 of 12 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS TABLE OF CONTENTS SPECIFICATIONS PROJECT SPECIAL PROVISIONS Item Description Date Page Index Pages (September 17, 2013) I-ii Revision of Section 101 – Definition of Terms (September 17, 2013) SP-1 Revision of Section 107 – Performance of Safety Critical Work (September 17, 2013) SP-3 Revision of Section 202 – Removal of Tree (September 17, 2013) SP-5 Revision of Section 202 – Removal of Concrete Sidewalk (September 17, 2013) SP-6 Revision of Section 202 – Removal of Asphalt Mat (September 17, 2013) SP-7 Revision of Section 202 – Removal of 12” Water Line (September 17, 2013) SP-7 Revision of Section 202 – Removal of Barricade (September 17, 2013) SP-9 Revision of Section 202 – Removal of Fence (September 17, 2013) SP-10 Revision of Section 202 – Remove and Replace or Protect (September 17, 2013) SP-11 In Place Existing Landscape Revision of Section 207 – Topsoil (September 17, 2013) SP-12 Revision of Section 208 – Erosion Control (September 17, 2013) SP-13 Revision of Section 209 – Dust Palliatives (September 17, 2013) SP-14 Revision of Section 210 – Reset Riprap (September 17, 2013) SP-15 Revision of Section 216 – Soil Retention Blanket (Straw/Coconut) (September 17, 2013) SP-16 Revision of Section 601 – Precast Concrete Underpass System (September 17, 2013) SP-17 Revision of Section 604 – Precast Concrete Area Inlet (September 17, 2013) SP-18 Revision of Section 604 – Manholes and Inlets (September 17, 2013) SP-19 Revision of Section 607 – Wooden Rail Fence (September 17, 2013) SP-20 Revision of Section 608 – Sidewalks and Bikeways (September 17, 2013) SP-21 Revision of Section 608 – Concrete Curb Ramps (September 17, 2013) SP-22 Revision of Section 609 – 2’ Concrete Pan and (September 17, 2013) SP-25 Hollywood Curb and Gutter Revision of Section 619 – Water Lines (September 17, 2013) SP-26 Revision of Section 628 – Bridge Girder and Deck Unit (September 17, 2013) SP-27 Revision of Section 631 – Pedestrian Bridge Abutment (July 15, 2014) SP-34 Utilities (September 17, 2013) SP-35 Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 10 of 12 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS SP-34 REVISION OF SECTION 631 PEDESTRIAN BRIDGE ABUTMENT Section 631 is hereby added to the Standard Specifications for this project as follows: DESCRIPTION 631.01 This work consists of the construction of the pedestrian bridge abutments as detailed in the construction plans. 631.02 Materials shall meet the requirements specified in the following subsections: Concrete Class D 601 Reinforcing Steel 602 All materials used in the construction of the bridge abutments shall also follow the guidelines detailed in the plans. METHOD OF MEASUREMENT 631.03 Pedestrian bridge abutments will be measured by the complete Pedestrian Bridge Abutment installed and accepted. BASIS OF PAYMENT 628.08 The accepted quantity shall be paid for at the contract unit price for the pay unit listed below. Payment will be made under: PAY ITEM PAY UNIT Pedestrian Bridge Abutment (40 foot) EACH Pedestrian Bridge Abutment (100 foot) EACH Payment shall be full compensation for all work necessary to complete the item, which shall include all materials, tools, equipment, and labor. The bridge girder and deck unit shall be measured and paid for separately. Helix pier will be measured and paid for separately under item 503. 12” caissons will be measured and paid for separately under item 503. Anchor bolts and other hardware shall be included in Item 631. Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 11 of 12 FOSSIL CREEK TRAIL UNDERPASS AT TRILBY ROAD PROJECT SPECIAL PROVISIONS SP-35 UTILITIES The following Utilities are known to be within the project limits: Utility/Agency Contact Person Phone Number Xcel Energy (gas) Stephanie Rich (970) 225-7828 Fort Collins Loveland Water District Terry Farrill (970) 226-3104 South Fort Collins Sanitation District Terry Farrill (970) 226-3104 COFC Stormwater Glen Schlueter (970) 224-6065 COFC Light and Power Mike Hergenreder (970) 219-8367 COFC Fiber Optic Clint Reetz (970) 221-6326 Comcast Communications Don Kapperman (970) 567-0245 Century Link Bob Rulli (970) 988-2120 Paragon Point HOA Irrigation Scott Gablehouse (970) 539-0890 The work described in these plans and specifications will require full coordination between the Contractor and the Utility Companies, in accordance with Subsection 105.06 and while performing their respective operations, so the utility work can be completed with minimum delays to all parties concerned. In accordance with the plans and specifications, and as directed by the Engineer, the Contractor shall keep the utility company(s) advised of any work being done to their facility, so that the utility company(s) can coordinate their inspections for final acceptance of the work with the Engineer. The Contractor shall be responsible for protecting, supporting, and if necessary, shoring existing utilities while constructing the trail, pedestrian bridge, and associated work. The Contractor shall submit to the City and the individual utility companies’ plans of how the utility lines will be supported and protected during construction. NOTE: The Contractor shall be required to provide written notice to each utility company, with a copy to the City, immediately prior to any utility work expected to be coordinated with construction. The following utility work shall be performed by the Contractor: Storm sewer system modifications, water main relocation Addendum 1 – 7664 Fossil Creek Trail Underpass at Trilby Road Page 12 of 12