HomeMy WebLinkAboutBID - 7617 ASBESTOS ABATEMENT AT BLOCK 32Addendum 1 -7617 Asbestos Abatement at Block 32 Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 7617: Asbestos Abatement at Block 32 OPENING DATE: 3:00 PM (Our Clock) June 3, 2014 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 -7617 Asbestos Abatement at Block 32 Page 2 of 2 EXHIBIT 1 – QUESTIONS & ANSWERS 1. In the ECO Thrift Building: With the exception of the floor tile mastic, is all the sheetrock removal trace material only? Response: The majority of the building has asbestos containing surfacing materials (TS01 and TS02) on the drywall that must be removed with full containment controls. In addition, it is assumed that there is overspray of this material in and on electrical fixtures, structural components, floors, and non- drywall walls. Typically the drywall is removed to facilitate the textured surfacing removal. It is almost impossible to remove the textured surfacing from the drywall substrate. In the locations where the textured surfacing is not present, the drywall can be removed as a trace material. Worker protection and engineering controls to prevent dust migration out of the work area are still applicable. 2. Will we be able to have access for dumpsters in the dock area for roofing removal? Police annex: Reponse: Contractor supplied dumpsters will be allowed on the asphalt parking lot around the small Kiosk building at 222 LaPorte. 3. Will the City be responsible for cordoning off sidewalks during work that affects foot traffic adjacent the building (windows, roofing removal)? Repsonse: The City will plan to bring in some temporary fencing to go around these buildings to make them secure when abatement begins and leave the fence in place for the deconstruction phase. 4. Will power, water and sanitary sewer be provided for the project? Response: There is 110v Power, a hose bib for water and a single toilet in the small Kiosk which the city will allow crews to use during the abatement. This building will need to be cleaned up upon completion to look the way it did when you started your work.