HomeMy WebLinkAboutCHANGE ORDER - BID - 7222 ASPALT OVERLAYFart Collins 111" Change Order Form Planning, Development & Transportation Sheets D9pervaent' 625 Ninth Street P.O, Boa 580 Fort Collins. CO 80522.0580 970,221,ee15 • Phm 970.221.8270 - Fax PROJECT TITLE: 2014 Street Maintenance Program. Aspire! Overlay PROJECT NUMBER: 902120 (Bid e7222) CONTRACTOR: Maven Mariana Materials (PO 91422" CHANGE ORDER NUMBER: 2 in Preparing change crdara show in dater as sepemte raurhnered pamgminns ffM folwAft 1. Reason for dwW. 2. Des&Wm of change. 3. Change In contract o0g. 4. ChwW In contract dt w. 1.62. Seeanadwdlordala0s 3. The conked scat Wl nwaave 0y S3,94e.95. 4. Them was be w charge In oontmd lme. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST $0.00 WAD - "Sam O.N% Aws ACCEPTED BY. ! � GATE: 9—'9r/ SUBMITTED BY: pwmsontsth ) (Sued Maintenance Program 18,166,2D1.80 DATE: 9 q -t" APPROVED BY: _ - DATE: lPttrdla" Aged over $80,00(1) rz Convaerar pwdre Raga Fe P _ 0 48oLA (c PO q,y2Zo1 otica jkc>, 5 33V 10 Vt.AW 011Kto Change Order No: 3 Date: 9/8I2014 1 Reason For Change: a. In an effort to meet a deadline initiated by the traffic department, SMP needed to ask Martin Marietta to work on a Saturday. Due to the cunent restrictions Martin Marietta has on their Asphalt plant located on Taft Hill Rd, they needed to haul the material from Greeley to meet our schedule. This change order is to pay for the difference in haul prices by getting material from the Greeley plant vs the Taft . Hill Rd plant. 2 Description Of Change: a. The deadline we needed to meet was the first day of school in the 2014 fall semester at CSU. The work was being performed on City Park Ave, from Mulberry St to W Elizabeth St. This project was originally scheduled to be started on the first day of summer, however the Utility Department and the New Development division of Engineering delayed this work because of their work on Plum St. The Traffic department would not let us close down City Park Ave while Plum St was closed adjacently. Plum St was open the Monday before school started, giving us a tight, six day timehame to complete the work, thus making us pave of a Saturday and paying for the difference in haul. 3 Change In Contract Amount: a. No Change. CO 3 Additional Haul Costs with mix from Greelcy. 34.88(tbn 1 757.05 1 6.89% $3.948.95 TOTAL CHANGE IN CONTRACT AMOUNT Change In Contract Time 4 No Change